Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹6.6 L+₹30,501.94 (4.81%)Admitted-Fee/PreQual/Technical/Finance NO 107 KAMATCHI AMMAN KOVIL STREET EEDAIYAMBUNDI VILLAGE THEVANAMPATTU POST TIRUVANNAMALAI TALUK AND DISTRICT 606 802 | TIRUVANNAMALAI | TIRUVANNAMALAI | TAMIL NADU | 606802 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹6.8 L+₹41,453 (6.54%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.3 L+₹96,774.14 (15.3%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.3 L+₹99,207.54 (15.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | JAYARAMAN BUILDERS L4 | PANDIYAN A L3 | T Manoharan L5 | OVIYA CONSTRUCTIONS L2 | V.KUMAR L1 | Lalitha.S L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Maintanance and Pot Hole epairs of Arungunam Sathiyav 1 Road to Vinnampoondi Road V - Kattu Colony Km 0/0 - 1/6(R-35) | |||||||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,304 | Sqm | 4.22 ₹9,722.88 | 6 ₹13,824 | 3 ₹6,912 Lowest | 4 ₹9,216 | 6 ₹13,824 | 7.2 ₹16,588.8 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank
with initial lead of 10M and lift Of 2M including all labour charges and incidental charges such as
shoring, strutting, providing coffer dams, bailing out of water as per 20A | 40.14 | Cu.m | 281.05 ₹11,281.35 | 131 ₹5,258.34 | 100 ₹4,014 | 98 ₹3,933.72 Lowest | 131 ₹5,258.34 | 165 ₹6,623.1 |
| 4.00 | Collection and supply Of Grity gravel for side berms and labour charges for filling etc complete | 8.25 | Cu.m | 1,686.3 ₹13,911.98 | 358 ₹2,953.5 | 100 ₹825 Lowest | 300 ₹2,475 | 358 ₹2,953.5 | 412 ₹3,399 |
| 5.00 | Providing and laying TACK COAT over the WMM surface (treated with primer) using3 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which Will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required
quantity Of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 206.25 | Sqm | 20.61 ₹4,250.81 Lowest | 43 ₹8,868.75 | 27 ₹5,568.75 | 28 ₹5,775 | 43 ₹8,868.75 | 54 ₹11,137.5 |
| 6.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. O. 17cum of 9.5-2.36 and below with 50_3kgs of VG30NG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,
carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness Of 40mm with lmechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc.. including labour for attending to paver to site
etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler. tipper trucks.paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH part-5 | 5.16 | Cu.m | 11,240.95 ₹58,003.3 Lowest | 16,000 ₹82,560 | 16,500 ₹85,140 | 14,000 ₹72,240 | 14,000 ₹72,240 | 16,000 ₹82,560 |
| 7.00 | Exterier Emulsion painting two coats with approved emulsion paintincludlng
,cost and conveyance Of all materials to and all labour charges etc.complete
,f0r 10 sqm | 34.56 | Sqm | 234.21 ₹8,094.3 | 206 ₹7,119.36 | 100 ₹3,456 | 98 ₹3,386.88 Lowest | 206 ₹7,119.36 | 247 ₹8,536.32 |
| 8.00Detailed Project Report for the work of potholes of the Road from CVP Road – Thakkanrayapuram Road to Anaipogi - Thakkanrayapuram Road ( via) urgudi ST Colony in Thakkanrayapuram panchayat(R-140) | |||||||||
| 9.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,510.45 | Sqm | 4.22 ₹10,594.1 | 6 ₹15,062.7 | 3 ₹7,531.35 Lowest | 4 ₹10,041.8 | 6 ₹15,062.7 | 7.2 ₹18,075.24 |
| 10.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank
with initial lead of 10M and lift Of 2M including all labour charges and incidental charges such as
shoring, strutting, providing coffer dams, bailing out of water as per 20A | 172.8 | Cu.m | 281.05 ₹48,565.44 | 140 ₹24,192 | 100 ₹17,280 | 96 ₹16,588.8 Lowest | 140 ₹24,192 | 165 ₹28,512 |
Tender Value
Refer Docs
EMD Value
₹8,600
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer Thellar
Block Development Officer Thellar
Maintanance and Pot Hole 1 repairs of Arungunam Sathiyav Road to Vinnampoondi Road Thakkanrayapuram Road to Anaipogi Thakkanrayapuram Thellar Mazhaiyur Road to Thellar Desur Limit Road Kalyanapuram Thirakoil panchayat in Thellar Panchayat
2026_RDTN_722249_1
5764/2025/A11 12.10.2026 THE2
Open Tender
Civil Works
Lump-sum
90 days
Block Development Office Thellar
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,600
Yes
13 Nov 2026
5 Nov 2026
12 Nov 2026
5 Nov 2026
12 Nov 2026
5 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintanance and Pot Hole epairs
of Arungunam Sathiyav 1 Road to
Vinnampoondi Road V - Kattu
Colony Km 0/0 - 1/6(R-35) | - | - | - | - |
| 2 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,304 | Sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank
with initial lead of 10M and lift Of 2M including all labour charges and incidental charges such as
shoring, strutting, providing coffer dams, bailing out of water as per 20A | 40.14 | Cu.m | - | - |
| 4 | Collection and supply Of Grity gravel for side berms and labour charges for filling etc complete | 8.25 | Cu.m | - | - |
| 5 | Providing and laying TACK COAT over the WMM surface (treated with primer) using3 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which Will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required
quantity Of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 206.25 | Sqm | - | - |
| 6 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. O. 17cum of 9.5-2.36 and below with 50_3kgs of VG30NG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,
carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness Of 40mm with lmechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc.. including labour for attending to paver to site
etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler. tipper trucks.paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH part-5 | 5.16 | Cu.m | - | - |
| 7 | Exterier Emulsion painting two coats with approved emulsion paintincludlng
,cost and conveyance Of all materials to and all labour charges etc.complete
,f0r 10 sqm | 34.56 | Sqm | - | - |
| 8 | Detailed Project Report for the work of potholes of the Road from CVP Road – Thakkanrayapuram Road to Anaipogi - Thakkanrayapuram Road ( via) urgudi ST Colony in Thakkanrayapuram panchayat(R-140) | - | - | - | - |
| 9 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 2,510.45 | Sqm | - | - |
| 10 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank
with initial lead of 10M and lift Of 2M including all labour charges and incidental charges such as
shoring, strutting, providing coffer dams, bailing out of water as per 20A | 172.8 | Cu.m | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
TenderDocument.pdf
Tender Documents • 0.78 MB
BOQ_867268.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .