Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 41 21 A KMC TOWERS C2 C2 SCHEME ROAD THENI 625531 | THENI | TAMIL NADU | 625531 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
2 Mar 2020, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
1.Pinnathevanpatty Village road km 0/0-0/400-R41 2.Madhurapuri PDS shop to Dindigul kumuli joint road km 0/0-0/2-R262 3.Periyakulam vaigai dam road to perumal koil road Km 0/0-0/6-R260 4Construction of 60000 Lr OHT Tank Near Panchayat office
2020_RDTN_158728_1
2990/2019/D5 Dated 20.02.2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender documents
3 documents required · 3 mandatory
₹0
₹33,000
11 Sept 2020
21 Feb 2020
2 Mar 2020
21 Feb 2020
2 Mar 2020
21 Feb 2020
Amount
STRENGTHENING THE BT ROAD PINNATHEVANPATTI VILLAGE ROAD KM - 0/0 - 0/400 R-41
Picking the existing metal surface 7.5 cm thich removing the picked up stuff to the sides, Collecting all useful metal levelling and sectioning to camper power roll consolidation by power roller etc as per the standard specification
Collection and supply of Red gravel including cost and convenyance and stecking at road side to deptl guage for taking precentand filling to the standard specification
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
HECTA METER STONE
Provision for Name Board
STRENGTHENING THE BT ROAD FROM MADURAPURI PDS SHOP TO DINDIGUL - KUMULI JOINT ROAD KM - 0/0 - 0/200
Clearing scrub jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all incidental charges etc. complete. SI III A/3
Picking the existing metal surface 7.5 cm thich removing the picked up stuff to the sides, Collecting all useful metal levelling and sectioning to camper power roll consolidation by power roller etc as per the standard specification
Collection and supply of Red gravel including cost and convenyance and stecking at road side to deptl guage for taking precentand filling to the standard specification
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
HECTA METER STONE
Provision for Sign board
Provision for Name Board
STRENGTHENING THE BT ROAD FROM PERIYAKULAM - VAIGAI DAM ROAD TO PERUMAL KOVIL ROAD KM - 0/0 - 0/600 R-260
Picking the existing metal surface 7.5 cm thich removing the picked up stuff to the sides, Collecting all useful metal levelling and sectioning to camper power roll consolidation by power roller etc as per the standard specification
Collection and supply of Red gravel including cost and convenyance and stecking at road side to deptl guage for taking precentand filling to the standard specification
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying tack coat using 4.00kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
HECTA METER STONE
Provision for Name Board
CONSTRUCTION OF 60000 LITERS CAPACITY O H T TANK @ NEAR PANCHAYAT OFFICE IN SARUTHUPATTY PANCHAYAT
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - First depth
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay ,stiff block cottom, hard red earth shales, muram gravel stoney earth and earth mixed with small size boulders S.S 20 B - Second depth
Filling with the river sand including cost and conveyence of all materials to site and all labourges etc complete.
Cement concrete 1 : 4 : 8 mix using 40 mm gauge hand broken granite stone jelly for foundation including watering where ever necessary and laid in layers not more than 15 cm thick compacting etc complete
Supplying and erecting centering for side and soffits including supports and strutting upto 3.29 m height for plane surfaces in all floors with all cross bracing use mild steels of size 90cm x 60cm and 10 gauge stiffned welded with mild steel angles etc
PLANE SURFACE
A)Below G.L
B)G.L to 3.30 m
CURVED SURFACE
SQUARE COLUMN
Below Ground level
J)0 - 3.30 m outer column
K)3.31 - to 4.30m outer column
Supplying Fabricating and placing in position of HSD steel rods for reinforcement including the cost of steel and binding wire etc, complete as per standard specification.
Reinforcement Cement concrete 1 : 1.5 : 3 mix using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabrication charges etc
A)1.5m to 4.5 Below G.L footing for rectangular portion
B)0m to 1.50 below G.L
C)0m to 4.5m from G.L
D)4.51m to 7.32 m from G.L
E)7.33m to 10.98m form G.L
Painting in two coats over outer wall surface with approved quality of Cement paint with colour over one coat of priming coat including cost of materials and labour charges etc.
Fabrication, supply delivery and fixing of out side MS ladder of 45 cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixing at 30cm center to center welded, jointed etc., providing with sutable side support, clamps and locking arrangements provided with one coat of red oxide paint for provided access to roof top 1,00,000 lit capacity OHT of sutable inclined lenght including bottom anchorage and transportation of all etc
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 mix using 20mm metal for OHT including cost of reinforcement placing grill in position centering shuttering charges mixing of concrete curing etc.
Providing manhole cover of size 0.60 x 0.60m in RCC 1:1.5:3 with sutable reinforcement 50x50x6mm MS angle fixed along edges and as per departmental officers
80mm dia GI pipe for inlet connection
80mm dia for over flow & rain water harvesting pipe
80mm dia GM Gate valve
80mm dia coupling
90mm dia PVC pipe
Supply and fixing of GI, PVC pipes and specials arrangements etc
90 mm PVC pipe 6kg/cm2
90 mm PVC Bend 6kg/cm2
90 mm PVC MTA 6kg/ cm 2
90 mm PVC TEE 6kg /cm2
80mm GM Gate valve
solvent cement
Earth work execavation abd depositing on bank with in intial lead of 10 mts and lift of 2 mts in narrow trenches for laying the pipes in all kinds of soils as directed by the departmental officers
Laying and jointing of 90mm PVC pipeline
Refilling the execavated soils in the trenches
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G MURALIDARAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .