| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.3 Cr+₹10.3 L (8.72%)Rejected-Finance E 2 216 GROUND FLOOR SHIV RAM PARK NEAR LUCKY GARDEN NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | ₹1.3 Cr+₹10.3 L (8.72%) | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹1.3 Cr+₹14.7 L (12.4%)Rejected-Finance 301 VARDHAMAN CHAMBER II VIKASPURI NEW DELHI 110018 | WEST | DELHI | 110018 | ₹1.3 Cr+₹14.7 L (12.4%) | L3 | Rejected-Finance Not L1 bidder |
| 4 | L4₹1.4 Cr+₹17.3 L (14.6%)Rejected-Finance D S 185 186 SECTOR D LDA COLONY KANPUR ROAD LUCKNOW LUCKNOW UTTAR PRADESH 226012 | LUCKNOW | UTTAR PRADESH | 226012 | ₹1.4 Cr+₹17.3 L (14.6%) | L4 | Rejected-Finance Not L1 bidder |
| 5 | L5₹1.4 Cr+₹21.2 L (17.9%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹1.4 Cr+₹21.2 L (17.9%) | L5 | Rejected-Finance Not L1 bidder |
Tender Value
₹1.8 Cr
EMD Value
₹1.8 L
Closing Date
31 Dec 2019, 6:00 pmClosed
SM Electrical Raipur
S V Airport Raipur
ARMO 2020 22 of E and M Installation at S V Airport, Raipur SH Annual Operation and comprehensive maintenance of 3 X 300TR HVAC Plant, split type air conditioners, water coolers and RO water purifier
2019_AAI_34006_1
AAI/ENGG(E-E)/HVAC CMC/2019-20/E-NIT-03
Open Tender
Electrical Works
Works
730 days
S V Airport Raipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,120
Yes
AAI Raipur
₹1.8 L
Yes
11 Mar 2020
13 Dec 2019
8 Jan 2020
13 Dec 2019
31 Dec 2019
13 Dec 2019
13 Dec 2019 - 27 Dec 2019
Amount
Operation and daily routine maintenance of HVAC system of 3 nos X 300TR capacity in two shift per day (16 Hrs) including sundays & holidays by engaging of manpower as mentioned in the tender terms & conditions. System comprising of chillers cooling towers, all pumps,, Terminal building AHU's, LT Panels, Control Panels, VFD's, BMS & Load manager system etc. including monitoring, recording of various parameters of HVAC system as per detailed specifications, terms and conditions of agreement as required.
Operation of complete HVAC system on hourly basis for covering of additional watch hours between 22:00 Hrs to 06:00 Hrs on all days including Sundays & Holidays as per the instruction of Engineer - In -Charge by engaging the following manpower: Supervisor/ Highly skilled-01 no. Operator cum Technician (Skill)-01 no Helper( Un-Skilled)-02 nos
Job contract for comprehensive Maintenance of complete central HVAC System of 3x300 Tr capacity comprising of the following main components .The job includes attending to complaints, repairs/rectifications, supply & replacement of any required spares/accessories/parts consumables, rewinding works, refrigerent charging(topping up) etc. as when ever required. Job also includes servicing & overhauls of complete HVAC system (Once in a year), periodic inspections, Schedule/ preventive/breakdown maintenance as per tender terms & conditions for the period of one year as required.
3 Nos x 300TR capacity screw type chiller units including load manager & all associated installations & acessories but excluding any consumables/ spares require replacement due to ageing. These shall be provided by the AAI & replacemnt & commission shall be done by the agency.
Air Handling Unit of different capacity including control panels /instrumentation & all other accessories of following capacity - 34 Nos.
Cooling Towers complete - 3 Nos
Primary Chilled Water motorpump sets (15 HP ) - 4 Nos
Secondary Chilled Water motorpump sets (40 HP) - 3 Nos
Condenser motorpump sets( 30 HP) - 4 Nos
Makeup water motorpump set (3 HP) & starter panel and associated accessories-1 set
VFD Drive for secondary motorpump sets-3 nos
Load Manager for chillers & all associated installations
Electrical Panel for HVAC system (All the incoming & outgoing cables are covered in the scope of work only for maintenance & fault finding. Replacement of defective cables is not covered in the scope of item)
Building management system (BMS) for above said HVAC system along with all associated equipments like DDC panels, sensors/ transducers/ instruments/ control wiring/ networking/ computer /softwares /UPS etc except batteries of UPS.
Fist Year
Second Year
Annual comprehensive maintenance of single phase 1.5/2.0 TR (including star rated) split type air conditioners of different makes including stabilizer (wherever installed) of following capacity installed at different locations including providing all necessary consumables / spares & replacement of faulty compressor and carrying out complete preventive/ breakdown maintenance as required (Non Inverter Type AC- 17 Nos. + Inverter Type AC-69 Nos.)
Fist Year
Second Year
Annual comprehensive maintenance of water cooler so fall makes (i/c bubbler type 6 nos. Oasis make & 14 nos. normal water cooler) and upto 150/150 liters. cooling/storing capacity at different locations including providing all necessary consumables and spares including replacement of faulty compressor with original make as required.
Fist Year
Second Year
Annual comprehensive maintenance of industrial water purifiers(RO) of capacity 25 LPH at different locations including providing all necessary consumables and spares including replacement of Membrane(Once in a year), Carbon Filter (twice in a year) and sediment filter(every quarter) attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required.
Fist Year
Second Year
Annual comprehensive maintenance of domestic water purifiers (Kent RO) at different locations including providing all necessary consumables and spares including replacement of Membrane(Once in a year) ,Carbon Filter (twice in a year) and sediment filter( every quarter) attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required.
Fist Year
Second Year
Annual comprehensive maintenance of domestic water purifiers (Aqua Guard) at different locations including providing all necessary consumables and spares including replacement of ,Carbon Filter (twice in a year) and sediment filter( every quarter) attending monthly servicing/overhauling of system, attending breakdown call as & when required, complete etc as required.
Fist Year
Second Year
Annual comprehensive maintenance of three phases 3.0 Tr Tower Type split type airconditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
Fist Year
Second Year
Annual comprehensive maintenance of three phases 4.0 Tr Tower Type split type airconditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
Fist Year
Second Year
Annual comprehensive maintenance of three phases 4.0 Tr Cassette type inverter model airconditioners of different makes following capacity installed at different locations including providing of all necessary consumables and spares & replacement of faulty compressor and carrying out preventive & breakdown maintenance as required.
Fist Year
Second Year
Dismantling of Existing single phase/three phase Split /Floor mounted Air conditioner units (all type) complete of different rating from existing site. Before dismantling the full gas to be pump down properly and refilling of holes, plastering, finishing the walls making good the same including shifting the removed airconditioning unit up to new loaction / store room as required.
Fist Year
Second Year
Installation testing and commissioning of Split A.C/Tower A.C(all type) of various capacity up to 4 Tones etc. including connecting the outdoor & indoor units using refrigerant pipeswith insulation (existing or new one as applicable), wiring ,leak testing of entire system, top up of refrigerant as required, minor civil works as per requirement.
Fist Year
Second Year
Annual comprehensive maintenance of Air-cooler which includes replacement of khus once in the year, including rewinding of air cooler motor, pump, pipes as required etc. Scrubbing of Air Cooler body with emry /sand paper and double coat painting including applying red oxide etc. as required and quarterly cleaning of cooler sumps but excluding watering.
Fist Year
Second Year
Annual Service contract for 4 x16.5 Tr capacity of Air-cooled package Air-conditioning unit of Blue star make , operated on 3 phase, 415V, 50 Hz AC which includes only sundry maintenance and weekly testing for serviceability as per terms & conditions of contract & operation of plant as & when required basis but excluding supply of spares for the period of one year.
Fist Year
Second Year
Replacement of Compressor Oil of 3 X 300 TR Chillers
Compressor Oil (FVC68D/Emkart RL68H)
Filter Drier Core (48-DC)
Oil Filter
Supertech Engineers
Arctic Engineering Services
ANOOP REFRIGERATION
Sterling And Wilson Pvt. Ltd
dipsanudyog
KRISHNA REFRIGERATION
AIR PERFECTION
M K ENTERPRISES
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .