| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹8.4 LRejected-Finance | ₹8.4 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | PETCHIAMMAL L2 | MS.P B S CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation and depositing on bank with in initial lift of 2m in hard stiff clay cotton soil , hard red earth ,earth mixed wit small sized boulders and hard gravelly soil as per SS 20B | 19.68 | Cum | 210 ₹4,132.80 | 197 ₹3,876.96 |
| 2.00 | C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 67.9 | Cum | 5,340 ₹3.6 L | 5,327 ₹3.6 L |
| 3.00 | Supply and erection of Centerin shuttering including necessary support for plane surface in foundation and basement and in all floor for RCC colum footing colum plinth beam , beams roof slab, staircase steps,bed block , critical pier etc using mild steel sheets of 90x60 cm and 10 guage including conveyance of all materials to site and proper centering etc complete. | 131.2 | Sqm | 380 ₹49,856 | 365 ₹47,888 |
| 4.00 | C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 15.09 | Cum | 6,100 ₹92,049 | 6,078 ₹91,717.02 |
| 5.00 | C.C. 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete | 49.2 | Cum | 6,630 ₹3.3 L | 6,618 ₹3.3 L |
| 6.00 | Supply and fixing of Tarpat Arrangements | 9.9 | Sqm | 250 ₹2,475 | 234 ₹2,316.60 |
Tender Value
₹9.9 L
EMD Value
₹9,950
Closing Date
17 Dec 2025, 3:00 pmClosed
BDO (B.Pt.)
Panchayat Union, Manur.
CC Road
2025_RDTN_629784_2
A2/5647/2025
Open Tender
Civil Works - Roads
180 days
Manur
Refer Tender doc.
2 documents required · 2 mandatory
₹0
₹9,950
23 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
17 Dec 2025
9 Dec 2025
Amount
Earth work excavation and depositing on bank with in initial lift of 2m in hard stiff clay cotton soil , hard red earth ,earth mixed wit small sized boulders and hard gravelly soil as per SS 20B
C.C. 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and erection of Centerin shuttering including necessary support for plane surface in foundation and basement and in all floor for RCC colum footing colum plinth beam , beams roof slab, staircase steps,bed block , critical pier etc using mild steel sheets of 90x60 cm and 10 guage including conveyance of all materials to site and proper centering etc complete.
C.C. 1:3:6 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
C.C. 1:2:4 mix using 20mm metal including cost and conveyance of all materials to site and all labour charges etc., complete
Supply and fixing of Tarpat Arrangements
PETCHIAMMAL (BID ID -1535061)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_753626.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid