| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹90.1 LAccepted-AOC | l1 | Accepted-AOC L1 | |
| 2 | L2₹96.6 L+₹6.5 L (7.22%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹93.3 L
EMD Value
₹94,000
Closing Date
28 Nov 2019, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director DRDA Thoothukudi
O/O Project Director DRDA Thoothukudi
Improvements to 6 Nos of roads in Srivaikundam Panchayat Union of Thoothukudi District under SFC (B.Pt) 2019-20 - Package No TN/TUT-03-SFC (B.Pt)(2019-20)
2019_RDTN_148144_1
PD DRDA Tut Lr No. A4/7427/2019 dt 11.11.19
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi district
As per Tender Documents
4 documents required · 4 mandatory
₹0
₹94,000
O/O Project Director DRDA Thoothukudi
7 Jan 2021
21 Nov 2019
28 Nov 2019
21 Nov 2019
28 Nov 2019
22 Nov 2019
22 Nov 2019
90 days
Amount
Strenthening of Kettiyammalpuram - Udaiyarkulam road km 0/0-1/0 at Vellur Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-1/0
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15m
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Athamballam road km 0/0-0/6 at Mangalakurichi Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/6
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Construction of 3 m RCC slab Culvert at ch 0/300
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Cement concrete 1:4:8 (One cement ,four sand and eight hard broken stone) using 40mm. gauge hand broken granite stone jelly for foundation & Basement including watering wherever necessary and laid in layers not more than 15cm thick, compacting etc., complete complying with standard specification and as directed including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Supplying and erecting centering for sides and soffits including supports for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cmx60cm and 10 gauge stiffener welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak joist of 10cmx6.5cm spaced at about 90cm center to center etc. complete complying with standard specification and as directed.
Below sill (Without strutting )
Above Sill (With strutting )
Cement concrete 1:3:6 (One cement ,three sand and six hard broken stone) using 40mm. gauge hand broken granite stone jelly for foundation & Basement including watering wherever necessary and laid in layers not more than 15cm thick, compacting etc., complete complying with standard specification and as directed including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Reinforced cement concrete 1:11/2:3 using 20 mm gauge machine broken hard granite stone jelly for all R.C.C. works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing and providing fixtures like clamps in the R.C.C. deck slab sides and bottom of the slabs, shall be finished smooth with cement mortar 1:3:10 mm thick and with Kraft paper without claiming etc., as directed by the departmental officers complete complying with standard specification for Deck slab including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Supply and fabrication of Steel Grade Fe 415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
Cement concrete 1:2:4 (One cement ,Two sand and four hard broken stone) using 40mm. gauge hand broken granite stone jelly for foundation & Basement including watering wherever necessary and laid in layers not more than 15cm thick, compacting etc., complete complying with standard specification and as directed including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Supplying and filling with excavated earth including all cost and conveyance and all labour charges for watering,Ramming etc complete
Construction of Retaining wall at ch 0/300
Earth work excavation in all classes of soils except hard rock requiring blasting and depositing on bank with intial lead and lifts and all other incidental charges such as shoring, strutting, baling out water, forming protective bunds, coffer dam wherever necessary for dressing the bed below sill level etc., complete for foundation. As per SS20B
Cement concrete 1:4:8 (One cement ,four sand and eight hard broken stone) using 40mm. gauge hand broken granite stone jelly for foundation & Basement including watering wherever necessary and laid in layers not more than 15cm thick, compacting etc., complete complying with standard specification and as directed including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Cement concrete 1:3:6 (One cement ,three sand and six hard broken stone) using 40mm. gauge hand broken granite stone jelly for foundation & Basement including watering wherever necessary and laid in layers not more than 15cm thick, compacting etc., complete complying with standard specification and as directed including cost of cement which will be supplied by department at departmental section store and the cost of the same will be recovered from contractor at the rate noted in the special condition
Supplying and erecting centering for sides and soffits including supports for plane surfaces in all floors with all cross bracing using mild steel sheets of size 90cmx60cm and 10 gauge stiffener welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak joist of 10cmx6.5cm spaced at about 90cm center to center etc. complete complying with standard specification and as directed.
Below sill (Without strutting )
Strenthening of Senthilampannai Tholappan road km 0/0-2/0 at Tholappanpannai Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-2/0
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing KM stones of size 1.65 x 0.45 x 0.15m
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Karumpuli Sastha Koil road km 0/0-0/350 at Parakkiramapandi Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/350
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Arunthathiyar colony Kakkanji Salai road km 0/0-0/3 at Palayakayal Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/350
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
Strenthening of Aniyabaranallur Bye pass road km 0/0-0/350 at ANAYAPARANALLUR Panchayat in Srivaikundam Block under SFC (BP) - 2019-20 Package No.03
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/350
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer coat over the WMM surface using 7.00 Kg of bituminous emulsion SS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying tack coat over the primed WMM surface using 2.50 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHANMUGATHEVAR KRISHNAMOORTHY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .