Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.0 LAccepted-AOC GEVRA BASTI KUSMUNDA DISTT KORBA 495447 C G | KORBA | CHHATTISGARH | 495447 | L1 | Accepted-AOC Techno-commercially accepted by TC and approved by GM | |
| 2 | L2₹61.3 L+₹7.9 L (14.8%)Rejected-Finance 1ST FLOOR FLAT NO A 104 ANANT EMEGINE SOCIETY PURANA BUS STAND KORBA DISTT KORBA C G 495678 | 495678 | L2 | Rejected-Finance Rejected being L2 bidder | |
| 3 | L3₹63.7 L+₹10.3 L (19.4%)Rejected-Finance R P NAGAR KORBA C G DIST KORBA C G PIN 495678 | 495678 | L3 | Rejected-Finance Rejected being L3 bidder |
Tender Value
₹69.0 L
EMD Value
₹86,300
Closing Date
26 Sept 2023, 11:00 amClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG)
Cleaning of spillage/ overflown/jammed coal, slush, slurry etc. around various belt conveyors of New CHP Phase I, Kusmunda Project.
2023_SECL_287955_1
SECL/GM/KSM/EnM/ eTender/23-24/25
Open Tender
Miscellaneous Works
Item Rate
363 days
KUSMUNDA OPEN CAST PROJECT
Please refer Tender documents.
6 documents required · 6 mandatory
₹86,300
21 Nov 2023
6 Sept 2023
27 Sept 2023
6 Sept 2023
26 Sept 2023
7 Sept 2023
7 Sept 2023 - 15 Sept 2023
Amount
Description of Work
Cleaning of spillage,overflown, jammed coal,shale, slush, slurry etc. around various belt conveyors of New CHP Phase I, Kusmunda CHP for its smooth & trouble free running. As analysed, above work to be carried out manually by deploying 10 nos. unskilled manpower at different & distinguish location of CHP on daily basis including cost of Tools & Tackles, contractor profit & applicable rate of CMPF and Pension for 363 days.
Removal of coal, slush etc accumulated around the belt conveyor & ground level by lifting & shifting with bucket for rehandling in belt/ chute/ hopper. As analysed above work to be carried out manually by deploying 02 nos. unskilled manpower on daily basis including cost of tools/ tackles, contractor profit & applicable CMPF and Pension for 363 days.
Total impact of GST for the purpose of CTC
AARNA Constructions
BHAKULAL SAHU
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .