Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹31.9 L
EMD Value
₹31,933
Closing Date
30 Nov 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Forest Officer, Jayapur KL Division
At- Defunct Foresters Training School campus, Forest Colony, PO-Irrigation Colony, Jayapur, Dist- Koraput, PIN- 764004
Construction of CG No. 1 (New) at Boipariguda CG Campus of Jayapur KL Range under Jayapur KL Division under CG Rent and Interest Fund during 2026-27 FY
2026_DFJPK_146785_1
DFO-JPR-KL-01/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Boipariguda CG Complex
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹31,933
Yes
20 Nov 2026
20 Nov 2026
1 Dec 2026
20 Nov 2026
30 Nov 2026
20 Nov 2026
20 Nov 2026 - 30 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures in all types of soil as per drawing and technical specification, including setting out, shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom to required level & line, backfilling the excavated earth to the extent required including compaction and utilising the remaining earth locally for road work including all Cost, Conveyance, royalties and of all materials, labour, T&P, cess and machinaries required for the work etc. complete as per direction of the Department. | 99.37 | cum | 311.53 | ₹30,956.74 |
| 2 | Cement concrete of prop (1:4:8) using 4cm size H.G. metal of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing etc., complete including cost, conveyance cess and royalities of all materials with labour, curing and T&P required for the work complete and as per direction of the department. | 41.57 | cum | 5,932.55 | ₹2,46,616.1 |
| 3 | Filling in foundation and plinth with sand well water and rammed with all cost labour T&P etc. complete as per direction of the department. | 54.99 | cum | 699.25 | ₹38,451.76 |
| 4 | Flyash brick masonary in C.M.(1:6) in Foundation & Plinth using 9" size Flyash bricks of approved quality including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance cess and royalities of all materials with labour, curing and T&P required for the work complete and as per direction of the department. | 28.36 | cum | 5,812.11 | ₹1,64,831.44 |
| 5 | R.C.C. work in (1:1.5:3) using 12mm down graded C.B HG chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing for four weeks, centering, shuttering and finishing the exposed surface smooth including cost, conveyance, cess and royalties of all materials with labour, curing and T&P required for the work complete and as per direction of the department.-Coulmn Footing | 19.14 | cum | 9,067.5 | ₹1,73,551.95 |
| 6 | R.C.C. work in (1:1.5:3) using 12mm down graded C.B HG chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing for four weeks, centering, shuttering and finishing the exposed surface smooth including cost, conveyance, cess and royalties of all materials with labour, curing and T&P required for the work complete and as per direction of the department.-Plinth Beam | 6.58 | cum | 9,067.5 | ₹59,664.15 |
| 7 | R.C.C. work in (1:1.5:3) using 12mm down graded C.B HG chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing for four weeks, centering, shuttering and finishing the exposed surface smooth including cost, conveyance, cess and royalties of all materials with labour, curing and T&P required for the work complete and as per direction of the department-Coulmn | 11.5 | cum | 20,889.5 | ₹2,40,229.25 |
| 8 | R.C.C. work in (1:1.5:3) using 12mm down graded C.B HG chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering and curing for four weeks, centering, shuttering and finishing the exposed surface smooth including cost, conveyance, cess and royalties of all materials with labour, curing and T&P required for the work complete and as per direction of the department-Lintel | 0.29 | cum | 16,781.55 | ₹4,866.65 |
| 9 | Straingthening bent up or coiled rods cutting, bending, cranking, hooking, welding or jointing ( if required) the M.S. rods or Tor steel and binding wires of approved quality including binding tying the grills hoisting, lowering and placing in proper position as required for RCC works and for providing cost, conveyance and of M.S. rods or Tor steel and binding wires of 18 to 20 gauge and labour & cess with all T&P required for the work etc., complete in all floors ( weight of binding wires will not be considered for payment and payment will be made on weight of M.S. rods or Tor steel only) as per the direction of the department. | 35.2 | Qntl | 9,159.15 | ₹3,22,402.08 |
| 10 | Flyash brick masonary in C.M.(1:6) in Super Structure using 9" size Flyash bricks of approve quality including splays cutting, circular moulding, champering and corbelling, watering and curing etc., complete including cost, conveyance cess and royalities of all materials with labour, curing and T&P required for the work complete and as per direction of the department. | 80.47 | cum | 5,845.45 | ₹4,70,383.36 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
dtcn_cg_final_pdf.pdf
Tender Documents • 0.81 MB
BOQ_622281.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .