Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹65,980.84Admitted-Fee/PreQual/Technical/Finance DHANAGAR PURA PETH BUDHWARA KATOL DIST NAGPUR 441302 | KATOL | NAGPUR | MAHARASHTRA | 441302 | -21.50% | ₹65,980.84 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹68,922.66Admitted-Fee/PreQual/Technical/Finance IMLI DAFAI RAKHIKOL DAMUA CHHINDWARA 480555 | CHHINDWARA | CHHINDWARA | MADHYA PRADESH | 480555 | -18.00% | ₹68,922.66 | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹80,765.59Admitted-Fee/PreQual/Technical/Finance | -3.91% | ₹80,765.59 | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹99,181
EMD Value
₹1,300
Closing Date
5 Jun 2026, 5:00 pmClosed
Assistant Manager (Civil), Gokul OCM
Civil Department, Office of SAM, Gokul OCm
Providing and Fixing Precast RCC Pillars for Monitoring Displacement of OB Dumps and Benches at Gokul OC Mine under MSA of Umrer Area.
2026_WCL_360386_1
um4514-civ-0003-2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Gokul OCM, Near Pirawa Village
Please refer tender document
3 documents required · 3 mandatory
₹1,300
9 Jun 2026
28 May 2026
6 Jun 2026
28 May 2026
5 Jun 2026
28 May 2026
28 May 2026 - 3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 3.24 | Cum | 200.85 | ₹650.75 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.88 | Cum | 6,309.15 | ₹18,170.35 |
| 1.03 | Suppling of precast survey pillers of size 100mm x 100mm x 1000mm including transportation as per instruction of Engineer-Incharge. | 120 | Nos | 260 | ₹31,200 |
| 1.04 | Engaging of TATA 407 or equivalent for shifting of material & pillars to different sites for average lead of 5 KM for grouting of pillars etc.as per instruction of Engineer-Incharge. | 12 | Day | 2,835.91 | ₹34,030.92 |
| 1.05 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_373255.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].