Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.8 LAccepted-AOC GRAM AKSAULI PO PAHADA DISTRICT MIRZAPUR | 1 | Accepted-AOC Awarded | |
| 2 | 2₹5.9 L+₹14,768.52 (2.55%)Rejected-Finance KAILASHPURI COLONY RAMAI PATTI MIRZAPUR | 2 | Rejected-Finance not being L-1 | |
| 3 | 3₹6.0 L+₹19,463.83 (3.36%)Rejected-Finance | 3 | Rejected-Finance not being L-1 | |
| 4 | 4₹6.2 L+₹44,208.63 (7.63%)Rejected-Finance | 4 | Rejected-Finance not being L-1 | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SHYAM BIHARI DUBEY L1 | M/S RAVI SHANKAR L2 | MS VIJAY KUMAR SINGH L3 | NOORJAHAN COSNTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in hard soil mixed with boulder including all lead, lift with proper completion of work. . | 44.55 | Cum | 146.23 ₹6,514.55 | 80 ₹3,564 Lowest | 147 ₹6,548.85 | 154 ₹6,860.7 |
| 2.00 | Earthwork in filling for strengthening of banks with all lead & lift including cost of all material, labour, T&P etc. with proper completion of work | 88.52 | Cum | 176.19 ₹15,596.34 | 150 ₹13,278 Lowest | 180 ₹15,933.6 | 186.34 ₹16,494.82 |
| 3.01 | Laying stone boulder (25.kg to 60. kg weight) pitching with R.R Stone masonary in 1:4 cement mortor in slope of embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 92 | Cum | 3,388.66 ₹3,11,756.72 | 3,300 ₹3,03,600 Lowest | 3,511 ₹3,23,012 | 3,653.65 ₹3,36,135.8 |
| 3.02 | Relaying of existing stone boulder in pitching with R.R Stone masonary in 1:4 cement mortor in slope of embankment including cost of all material, labour, T&P binding wire etc. required for proper completion of work. | 40 | Cum | 2,497.28 ₹99,891.2 Lowest | 3,000 ₹1,20,000 | 2,590 ₹1,03,600 | 2,695 ₹1,07,800 |
| 4.00 | Laying C.C. 1:3:6 in foundation & bond stone (with 1 cement :3 Coarse sand FM not less than 2.00, 6 stone ballast size 20 to 40mm) including all cost of material labour T&P etc. with all lead and lift. Required for proper completion of work. | 9.45 | Cum | 3,706.31 ₹35,024.63 | 3,500 ₹33,075 Lowest | 3,740 ₹35,343 | 3,996.3 ₹37,765.04 |
| 5.00 | C.R. cut stone (Khanda) masonary with 1:3 cement coarse sand mortor including cost of all material, labour and T&P etc. including all lead and lift for proper completion of work. | 25.52 | Cum | 3,515.86 ₹89,724.75 Lowest | 4,000 ₹1,02,080 | 3,642 ₹92,943.84 | 3,788.4 ₹96,679.97 |
| 6.00 | Cement plaster with 1:3 C.M. on stone masonry including cost of all materials, T&P etc required for proper completion of work. | 121.8 | Cum | 169.05 ₹20,590.29 | 150 ₹18,270 Lowest | 173.9 ₹21,181.02 | 177.1 ₹21,570.78 |
Tender Value
Refer Docs
EMD Value
₹16,238
Closing Date
3 Oct 2025, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
EXECUTIVE ENGINEER BANSAGAR CANAL CONSTRUCTION DIVISION-7 MIRZAPUR
Protection work for wing walls of Aquaduct at km 32.060 of M.J.L.C
2025_UPIDC_1076102_2
NIT 01/EE/2025-26
Open Tender
Civil Works
Item Rate
LALGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹16,238
12 Nov 2025
22 Sept 2025
3 Oct 2025
23 Sept 2025
3 Oct 2025
23 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .