| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | L1 | Accepted-Finance Being the lowest bidder L1 | |
| 2 | L2₹7.4 L+₹31,490.69 (4.42%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹7.9 L+₹76,769.72 (10.8%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹8.3 L+₹1.2 L (16.9%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | L5₹8.3 L+₹1.2 L (17.0%)Accepted-Finance | L5 | Accepted-Finance Being L5 |
Tender Value
₹11.9 L
Closing Date
24 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO Doda
Forest Complex Doda
Installation of Boundary Pillars 159 Nos in Shupershall Forest of Siraj Range in Doda Forest Division under Capex 2023-24
2023_FD_218646_1
e NIT 38 of 2023-24 dtd. 26-06-2023
Open Tender
Civil Works
Item Rate
60 days
Siraj Range in Shapershall Forest
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Doda
Exempted
26 Jul 2023
26 Jun 2023
25 Jul 2023
26 Jun 2023
24 Jul 2023
26 Jun 2023
Amount
Earth providing work in excavation by manual means in trenches for foundations drains, pipes cables, etc. (Not exceeding 1.5 mte width) and for shafts, wells, cesspits and the like not exceeding 10sq in plane. Depth height upto 1 mtr from cutting edge, disposal earth is to leveled and neatly dressed. All kind of soil. 159 numbers sides = 1.00 with dimensions 2.5 x 1.50 x 3.25 = 1938.81 cft.
Providing and lying in position cement concrete of specified grade exclusing the cost of centering and shuttering. All work upto plinth level 1:3:6 ( 1 cement and 3 coarse sand 6 graded stone aggregate 20 mm nominal size) crused of (i) 159 numbers of sides = 1.00 with dimensions 2.5 x1.50 x 2.00 = 1192.50 cft, (ii) 159 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 2.00 = 238.50 cft and (iii) 159 numbers of side 1.00 with dimension 2.50 x 1.50 x 0.25 = 149.06.
Filling available excavated earth ( Excluding rock) in trenches plinth sides foundation etc in layers not exceeding 20 cm depth consolidating layer by remaining and watering load upto 50 mtr and lift upto 1.5 m of (i) 159 numbers of sides = 1.00 with dimensions 2.5 x 1.50 x 1.00 = 596.25 cft and (ii) 159 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 1.00 = 119.25 cft
Reinforced cement concrete work in walls ( any thickness) including attached pllasters buttresses, plinth and string courses fillets, columns, pillars, fillets, piers, abutments, posts and struts etc upto floor five level excluding cost of cetering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 coarse sand 3 graded crushed stone aggregate 20 mm nominal size.) of 159 numbers of sides = 1.00 with dimensions 1.5 x 0.50 x 6.00 = 715.50 cft
Reinforcement for RCC work including straightening,cutting bening, placing in position and binding all complete cold twisted cold twisted bars having 159 numbers (i) 4 numbers of Iron bars having length 6 feet = 3816 feet = 1163.41 mtr which includes Weight Kg/mtr = 0.62 = total weight = 721.32 Kg (ii) 8 numbers of Iron bars having length 1.5 feet = 1908 feet = 581.71 mtr which includes Weight Kg/mtr = 0.39 = total weight = 226.87 Kg
Painting of pillars (with superior and exterior paint) including costs of labour charges incliuding painting of forest department logo and the front phase of the pillar with stencil for mainline BPs Red shade. Adventure 2189 (Nerolac) and for chak BPsYellow shade. Bumble bee 2014 (Nerolac) Exterior Emulsion paint is recommended. Solicon and acrylic emulsion based.
Centering and shuttering including shuttering propping etc and removal of form work for columns piers abutments pillers posts and struts for (i) 159 number having 2 sides of length 1.50 feet x depth height 6.00 feet = 2862 sft. = 265.99 Sqm (ii) 159 number having 2 sides of length 0.50 feet x depth height 6.00 feet = 954 sft = 88.66 Sqm.
Carriage of material from source to site of work by M.T and H.L av for sand av. M.T 22 Km and H.L 5050 mtr
Add for Repedite
Carriage of material from source to site of work by M.T and H.L av for Bajri av. M.T 22 Km and H.L 5050 mtr
Momin Jaffer Sheikh
MOHD ARIF BUTT
MOHD ASLAM
Ajaz Iqbal Bhat
ASHWANI KUMAR
RAM PERSHAD
RAJESHWAR SINGH
PARTAP SINGH
ABDUL WAHID
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .