Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
1 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
GSUBKN
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Any RRI/PI/EI/MACLS Supply, Installation Testing, Commissioning Signalling work OR Any RRI/PI/EI/MACLS Alterations Signalling work OR Any CTC/TMS Work
5 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If the bidder fails to submit copy of audited balance sheet alongwith the offer then contractual turnover of that year will be treated as NIL
"S&T associated work in c/w provision of stabling lines, marshalling lines and sick/fit coaches lines in Hisar station over Bikaner Division"
SNT-GS-BKN-2025-26-09
SNT-GS-BKN-2025-26-09
Open
Works - General
12 Months
Bikaner, Rajasthan
₹0
₹2.2 L
1 Apr 2026
9 Mar 2026
18 Mar 2026
124 items across 13 schedules · ₹1,24,29,861.55 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| manufacture and supply of Hot Architecture Electronic (EI) system complete as per specification No. Ver. 2 or latest, as requirement & tentative Signalling Plans & Diagrams. c Interlocking (EI) system consisting of Central Processing Interface Equipment/Relays requirements, Dual operator Grade VDU panel (42" LED) Redundancy (Hot stand-by dual one system online and system in standby mode), All Relays suitable for EI, cables and Jumper wires, grade maintenance Terminals with UPS minimum 1 hr back power supply converters equipments, Housing for EI and Relay R a c k s , fuses, disconnecting type terminals, mounting arrangements and necessary to make the EI functional as per approved plan. The tenderer should complete details of cards/ sub-modules connectors etc. station. Supply of 10% Essential the EI equipments subject to one of each type mainly of processor, cards/ module, relay etc. Item wise detailed with unit and quantity to be in separate annexure. (THIS BE USED ONLY FOR WORK IN EXISTING EI) RDSO Inspection charges: Railways Payment terms:100% | — | — | — | — | |
| 1 | with routes more than should be read as Per Vital | Per Unit | 30.00 | 62,549.98 | 18,76,499.4 |
| 2 | wiring, programming, and commissioning of EI supplied as per supply item 1.7 above of Chapter 1 of this including transportation from depot to site. The works and for installation, wiring, testing commissioning, grouting, cutting of refilling of the same, re- required CC/ masonry works, placing/ laying of insulated casing-capping/ cable trays/ pipes / Cables, termination of lugs/ connectors, painting,/ are to be provided/ done by the for the equipments supplied no. 7 of Chapter 1 of SOR. This the networking of built in EI of all the stations to system to any other places desired by Engineer-in-charge. SHALL BE USED ONLY FOR WORK IN EXISTING EI) Note: shall be comply to RDSO Advisory Note No dtd. 28.08.2014. wiring, programming, commissioning of Operator stand-by with Redundancy. Equipments/cards/Modules required stand-by with Redundancy shall & Installed by the Note:- This also includes Two nos. of composite & printer table (Godrej work table) and one no Godrej make chair model PCH7001. of indoor/ PIJF cables in on relays, tag blocks, CT per approved wiring diagram alterations/ modifications as site. Soldering to be done at termination. Dressing/ lacing shall be done neatly with help thread / plastic self lock strip size. The tools/ equipments/ simulation boards required for be supplied / fabricated by This includes replacement of cards/ LEDs/ equipments going during testing. Necessary supply boards with required plugs, sockets, surge & protection boxes shall be and installed by the contractor. shall be arranged by In case supplies are required extended, from Power room / relay same shall be extended by with his own materials 1X16 sq mm wires, cables, lugs, insulated ladders etc. After Factory Acceptance Tests Square Sheet testing system fault free while submitting to otherwise suitable necessary be taken by Engineer-in- Inspection: Consignee Inspection None Payment terms: 100% commissioning. | Job | 1.00 | 5,42,784.93 | 5,42,784.93 |
| 3 | work station note book as per Specifications . It also includes Laser Printer (Only branded). workstation should be capable of the system in case of any in yard interlocking in future. Specifications should be with the tender document by authority. Inspection: Inspection charges: None terms: 100% after supply | Station | 1.00 | 86,892.73 | 86,892.73 |
| 4 | preparation & supply of drawings print copies and original AUTO CAD FORMAT for Interlocking at each station. completion of the work, the drawings incorporating details are to be supplied as Specifications given in document (upto 6 Line). The specifications are as per 1.13 of SOR. Inspection: Inspection charges: None terms: 100% after execution | Station | 1.00 | 1,75,967.35 | 1,75,967.35 |
| 5 | of SWR literature in english associated mid-section gate with all corrections as SWRD & approved SIP. For technical corrections, editing, correction etc. are to be and one rough print to be railways for approval before required for final processing sanction. This also includes of maintenance cards in provided by Rly. Inspection: Inspection charges: None terms:100% after execution. | Station | 1.00 | 3,598.62 | 3,598.62 |
| 6 | of Station Working Rules to hindi and framing out in (or similar software )as per practice. The required SWR in will be provided by the and has been covered in item no. 1.21 of Chapter 1 SOR. Inspection: Consignee charges: None Payment after execution. | Station | 1.00 | 4,478.18 | 4,478.18 |
| 7 | photocopies & binding of the literature in English/hindi/Diglot Railway practice. Inspection: Inspection charges: None terms:100% after execution. | Set | 6.00 | 178.52 | 1,071.12 |
| 8 | and supply of laminated one the completion plans including diagrams and indoor as well as completion documents on 75-micron polyester film for Auto CAD. 6 (Six) sets xerox also be provided for each of mentioned below: Cable Cable Core Chart, Location for all the locations, Cable details, Signalling Plan, SWR Wiring Diagrams, Selection Locking table, Contact analysis, Tag Block analysis of Relay rack, Control cum Indication Diagram, Power Panel Track circuit plan, rack plan and Junction Box details Inspection: Consignee Inspection None Payment terms:100% | Sheet | 200.00 | 161.07 | 32,214 |
| Schedule total | ₹27,23,506.33 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
tenderdocumentsHSR.pdf
ATTACHMENT
conceptplan.pdf
ATTACHMENT
TelecomCircularNo09.pdf
ATTACHMENT
JPOforCableCut.pdf
ATTACHMENT
Contractore-MB.pdf
ATTACHMENT
GCCACS213.12.2022.pdf
ATTACHMENT
2022AdvanceCorrectionSlipNo_7ACS-
ATTACHMENT
GCC-2022-UPTOACS09.pdf
ATTACHMENT
GCCACS10.pdf
ATTACHMENT
GCCACS81.pdf
ATTACHMENT
GCCACS114.07.2022.pdf
ATTACHMENT
acs5dt20-10-2023GCC.pdf
ATTACHMENT
GCCACS9.pdf
ATTACHMENT
GCCACS3.pdf
ATTACHMENT
2022AdvanceCorrectionSlipNo_4ACS-
ATTACHMENT
GCC ACS 6 21.12.2023
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo_4ACS-4_1.pdf
ATTACHMENT
GCC2022AdvanceCorrectionSlipNo_6ACS-6.pdf
ATTACHMENT
GCCApril-2022AdvanceCorrectionSlipNo_7ACS-7.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .