| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹74.4 LAdmitted-Finance | -0.30% | ₹74.4 L | L1 | Admitted-Finance |
| 2 | L2₹74.6 L+₹14,929.77 (0.20%)Admitted-Finance 211 158 NAYA PURA KARELI PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | -0.10% | ₹74.6 L+₹14,929.77 (0.20%) | L2 | Admitted-Finance |
| 3 | L3₹74.6 L+₹18,662.22 (0.25%)Admitted-Finance | -0.05% | ₹74.6 L+₹18,662.22 (0.25%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Rejected |
Tender Value
₹88.1 L
EMD Value
₹1.8 L
Closing Date
27 Aug 2026, 12:00 pmClosed
SE RED Prayagraj Circle
SE RED Prayagraj Circle, 21 Church Lane, Alenganj, Prayagraj
Under District Prayagraj, Construction work of auditorium in Vikas Handiya campus of Prayagraj district, Lot No 1
2026_REDUP_1177033_1
I/1292261/2026/SE RED Prayagraj/Prayagraj/26-27 Dt 05/08/2026
Open Tender
Civil Works
Percentage
270 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹1.8 L
SE RED Prayagraj Circle
16 Sept 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Work | - | - | - | - |
| - | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.as per DSR 2.31 | 525 | cum | 13 | ₹6,825 |
| - | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out th | 345.34 | cum | 197 | ₹68,031.98 |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.as per DSR 2.27 | 41.86 | cum | 1,608 | ₹67,310.88 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 fine sand derived from natural sources : 8 graded stone aggregate 40 mm nominal size der | 54.31 | cum | 5,157 | ₹2,80,076.67 |
| - | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. Concrete of M25 grade with minimum cement content of 330 kg /cum Upto Plinth Level As Code No-5.33.1.1 | 83.23 | cum | 7,195 | ₹5,98,839.85 |
| - | Centering and shuttering including stutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. As per DSR Code No- 5.9.1 | 201.2 | cum | 297 | ₹59,756.4 |
| - | Centering and shuttering including stutting, propping etc. and removal of form for Columns, pillars, piers, abutments, posts and struts. As per DSR Code No- 5.9.6 | 266.86 | cum | 728 | ₹1,94,274.08 |
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand). As per DSR Code No- 6.1.2 | 23.36 | cum | 5,399 | ₹1,26,120.64 |
| - | Centering and shuttering including stutting, propping etc. and removal of form for Lentels beams, plinth beams, girders, bressumers and cantilevers, As per DSR Code No- 5.9.5 | 523.57 | cum | 557 | ₹2,91,628.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.57 MB
BOQ_2211977.xls
BOQ • 0.39 MB
Prayagraj_SBD.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .