| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.3 CrAccepted-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹19.3 Cr Quoted ₹20.7 Cr | 1 | Accepted-AOC work allotted |
| 2 | 2₹20.9 CrRejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹20.9 Cr | 2 | Rejected-AOC Rates are on higher side |
| 3 | 3₹21.9 CrRejected-AOC 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICATION 124103 | JHAJJAR | HARYANA | 124103 | ₹21.9 Cr | 3 | Rejected-AOC Rates are on higher side |
| 4 | 4₹22.4 CrRejected-AOC 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹22.4 Cr | 4 | Rejected-AOC Rates are on higher side |
| 5 | 5₹22.9 CrRejected-AOC 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS | PANIPAT | HARYANA | 132103 | ₹22.9 Cr | 5 | Rejected-AOC Rates are on higher side |
Tender Value
₹20.0 Cr
EMD Value
₹40.0 L
Closing Date
18 Dec 2023, 5:00 pmClosed
AMIT JAIN
EE PHE Division No. 1 Faridabad
Detail Project Report of Aug. Water Supply Scheme in Village Dhauj Distt. Faridabad Providing Sewerage pipeline in village Dhauj Distt. Faridabad (Under Mahagram Yojna)
2023_HRY_330184_1
20234271BDB2 5BCD 4176 97ED B9C417D998B4556PUH
Open Tender
Civil Works
380 days
DHUAJ DHUAJ
2 documents required · 2 mandatory
₹20,000
₹40.0 L
Yes
4 Nov 2024
22 Nov 2023
19 Dec 2023
22 Nov 2023
18 Dec 2023
22 Nov 2023
Amount
Crossing of Road/Drain for laying of pipeline through Horizontal boring under the existing Road/Drain By hydraulic mean complete in all respect
Provision for Restoration of water connection damaged due to laying of Sewerage Network
CCTVCAMERAS Providing and Installing 6 CCTV Cameras 4 Cameras for STP and 2 Cameras for MPS) complete as per satisfaction of the Engineer-in-Charge, within 96 hours of signing the Agreement along with 90 days recording (DVR). 32 inch LED Screen, 16 Channel DVR at STP Site and 8 Channel DVR at MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at both the sites i.e. MPS and STP shall be Synchronized at STP site. ( 1) At STP and MPS Site-1 No PTZ Speed dome 360 degree 50x zoom camera, 3 No. 12mm lens size No.3.6 mm lens size Make:- CP Plus internet protocol minimum 5mp WDR, Night vision colour mode 2.4.2 12mm very focal with extra CCTV cameras should be installed and commissioned before starting execution of years after 12 month defect liability period and 3 months trail run period complete in all respect as per approved NIT (Including 20% of O&M)
MAIN PUMPING STATIONS Design, construction erection, testing commissioning of MPS and following components including OandMtc. for 5 years after one year defect liability period and 3 month trial run period:- RCC Inlet, chamber screen chamber, collecting rectangular tank suitable for 3.00 MLD average flow with peak factor of 3.00 landscaping of the campus providing and installing of 5 no. Pumping Set of i.e. 1 no. 6100 LPM, 2 no. 2000 LPM and 2 no. 1000 LPM each having 15 mtr head, suitable size LT panel equipped with all safety devices, suitable automatic capacitor bank and submersible cable form LT panel to pump sets complete in all respect. K9 DI pipe of suitable dia at MPS Including welding and screwing of flanges, ISI marked D.L. fittings, Sluice valve, non return valves as per requirements even for bye-pass arrangements complete in all respect 3 Nos. CI Gear Operated Sluice Gate with SS Spindle (SS 410) and seats (SS 304) (2 nos. for screen and 1 no. for partition of collecting tank)as per design Supply and installation of 2 Nos, mechanical course screens of suitable size for 3.00 MLD average flow with peak factor of 3.0. The connecting sewer of same diameter and material of construction, laid at adequate depth between existing sewers to newly constructed structures is included in the scope of work. All the infrastructure except construction of staff quarter, and path ways/roads required to be executed at site to make the MPS functional is included in the scope of work for lump-sum job. All the pumping machinery, panel board, Level sensor etc shall be controlled by PLC andSCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internet facility The size and quantities of all the above components will be as per approved structural /Hydraulic /Mechanical/Electrical design to be approved by Departmental before actual execution of work including OandMtc. of 5 years after 12 months defect liability period and 3 months trail run period complete in all respect as per approved NIT (Including 20% of O&M).
SEWAGE TREATMENT PLANT Design construction, erection, testing and commissioning of STP 3.00MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) Technology complete in all respect including Landscaping MCC Panel room and all other contingent Electrical, Mechanical Electromagnetic Flow Measurement Device on inlet and outlet. Real Time Water Quality Monitoring with Data Collection System (Online analyzer), Piping and instrumentation works. With PLC and SCADA Arrangement for STP and MPS along with Synchronizing it with each other including furniture and laboratory equipment’s as per detail given in the bid document and including following components including OandM of 5 Years after 12 months defect liability period and 3 months trail run period. Supply and installation of 1 No. Main Gate of (MS) 12 ft. wide main gate and 4ft. wide wicket gate (total weight not less than 500 kg at STP site. As per satisfaction of Engineer-in-Charge. 2 No. High Mast of 9 mtr GI Octagonal pole of 4 m thickness (T=100 MM, B=200mm, Base Plate-320x320x20mm), Window at 500 mm from Base Plate with 6 No. LED energy outdoor suitable size reputed make efficient lamps on each pole, including 20 no. LED outdoor lights with Gl poles 7 mtr high including all accessories along the road and path complete in all respect. Providing and installing 2 No. Centrifuges (1Working plus 1 Stand bye) including centrifuge feed pump, all fittings, instrumentations, electric panel board etc. as per design complete in all respect, including packing dry sludge in 20Kg Bag and supplying the same in Market KisanSewa Kendra or as directed by Engineer-in-charge within lead as posited as clause 4.4.5 of NIT including operation and maintenance of 5 Years after 12 months defect liability period and 3 months trail run period. On line outlet effluent water quality monitoring system for BOD, COD, TSS, PH etc Supply, erection, testing and commissioning operation and comprehensive annual maintenance of effluent quality monitoring system at 3.00 MLD STP Dhauj for online (Continuous) measurement of PH, Total Suspended Solids (TSS). Chemical Oxygen Demand (COD). Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV- VIS range 200-720mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data in CPCB, HSPCB and PHED TUV approved complete in all respect as per Central Pollution Control Board (CPCB) Quidelines for online continuous monitoring system for effluent and as contained in scope of work including operation and Maintenance of 5 Years after 12 months defect liability period and 3 months trail run period Multi-parameter measuring converter, for connecting upto 18 intelligent sensors Scope including 8 analog inputs /Outputs (inputs and 4 outputs) (0/4-20 Ma). wide range power supply optical COD/BOD and TSS probe with spectral processing of the UV-VIS range for measurement in the outlet effluent of plant of 3.00 MLD STP at village Dhauj with integrated with automatic cleaning Robust digital pH/ ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature compensation (ATC) Cable length 100 Meter (minimum) Sensor adapter cable for all intelligent sensors, with IP68 water price connection to intelligent sensors net system cable length 100 Meter (minimum) Data Transfer to CPCB, HSPCB and PHED Servers during 6 year of OandM after commissioning after 3 months trial period (including 1 year of defect liability period) Providing GSM 5G, 4G Modem with mobile network connectivity including network charges for operation and Maintenance of 5 Years after 12 months defect liability period and 3 months trail run period complete in all respect as per approved NIT (Including 20% of O&M).
Laying of sewer line by Trenchless Technology in normal soil condition but not rock/bolder/any underground utilities like foundation road, Drain coming in alignment or other underground obstruction suitable for MS casing pipe of size complete for 800 mm i/d MS Pipe 12 mm thick casing pipe. consisting with:- 1. Machinery on hire basis, Labor Heavy Hydraulic Crane, Jacking Machine and other necessary equipment Horizontal Boring / Excavation. 2. Providing and inserting of 800mm i/d M S casing pipe 12 mm thick (Fe-330 grade) Fabrication as per IS 3589 of1991 from steel plate to IS 2062 including cutting, beveling, grinding and jointing with radiographically welding of pipe as per IS-1182 and testing completed in all respect. 3. Providing and Inserting 400 mm RCC NP/3 sewer pipe and testing complete in all respect. 4. Providing and fixing of MS Spacer at a distance of 2 Mtrs. apart to avoid to contract of casing pipe and carrier pipe complete for 800 mm i/d MS casing pipe of size comp.
Construction of HT / LT Panel room, PLC room, Centrifuge house, blower room and Lab cum office building and other buildings including doors, windows and fittings with toilet block including all Sanitary fittings etc. as per drawings attached at MPS and STP site covered area with RCC framed structure of brick work vitrified glazed tiles flooring, powder coated aluminum frame of size 100mm x 45mm of 10 gauge for chowkhat, 75mm x 45mm of 10 gauge for door frame, 45mm x 45mm of 10 gauge for window frame with 5mm thick glass AIS/Saint Gobain/ Modi Float Covered Area (250 sqm) ) including O and M for 5 Years after 1 year defect liability period and 3 months trail run period. (Including 20% of O&M).
Operation and Maintenance of the complete scope of work mentioned in the DNIT including 10 Nos. Tube wells (Except MPS and STP Component) as per schedule-IV for a period of 5 year (60 month) after 3 month of trial run and 1 year defect lability period (will be charged to the A/mtc. estimate) (water Supply and Sewerage system ) Operation and Maintenance during the defect liability period (Operation Only)
1st year operation and maintenance after defect liability
2nd year operation and maintenance
3rd year operation and maintenance
4th year operation and maintenance
5th year operation and maintenance
Bidder Name
Amount
Chahar Construction Co (GSTN-06AAMFC2979A1ZI) BID ID -991671
Jai Shree Balaji Constn Co. (GSTN-06AKLPK7500N1ZV) BID ID -993100
suresh kumar (GSTN-06AIPPK4333B1ZJ) BID ID -993393
Rajesh Kadiyan Contractor(GSTN-NA)--993838
SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED(GSTN-NA)--992065
SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED
Rajesh Kadiyan Contractor
Jai Shree Balaji Constn Co.
Chahar Construction Co
SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED
suresh kumar
Jai Shree Balaji Constn Co.
Rajesh Kadiyan Contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid