Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.5 LQualified Make: ACE
Model: ACE AF20E, 6M FFL, SD SOLID ACTION CONSTRUCTION EQUIPMENT LIMITED DUDHOLA DUDHOLA LINK ROAD 121102 PALWAL FARIDABAD INDIA PALWAL HARYANA 121102 | PALWAL | HARYANA | 121102 | Make: ACE
Model: ACE AF20E, 6M FFL, SD SOLID | L1 | Qualified MII | |
| 2 | L2₹13.5 L+₹1,500 (0.11%)Qualified Make: JECL--JECL ENGINEERING LIMITED
Model: JFB 20 (Std.) 304 FLOOR 3 PLOT 52 C BHARAT CHAMBER TATA POWER CARNAC BUNDER MUMBAI MUMBAI MAHARASHTRA 400009 | MUMBAI | MAHARASHTRA | 400009 | Make: JECL--JECL ENGINEERING LIMITED
Model: JFB 20 (Std.) | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹14.4 L+₹92,900 (6.90%)Qualified Make: godrej
Model: 2TE-GX 200 E UNO MFH 5500 3-STG SD ST 3-SPD 18% HB 201 202 LALA 1 LANDMARK MG ROAD HYDERABAD HYDERABAD | Make: godrej
Model: 2TE-GX 200 E UNO MFH 5500 3-STG SD ST 3-SPD 18% HB | L3 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
25 Aug 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6521331 Dated : 01-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : DIRECTOR ADRDE Adrde Agra
Department of Defence Research & Development
Office of DG (Aero)
Ministry of Defence (Director Adrde Public Fund Account) Splitting
8166923
GEM/2025/B/6521331
Two Packet Bid
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
90 days
AGRA
Total value wise evaluation
PRODUCT
4 documents required · 4 mandatory
Exempted
25 Aug 2025
1 Aug 2025
25 Aug 2025
Forklifts (V2) as per IS 6765:2003 and IS 10517 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6521331 Dated : 01-08-2025 Bid Document 1/8
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : DIRECTOR ADRDE Adrde Agra
Department of Defence Research & Development
Office of DG (Aero)
Ministry of Defence (Director Adrde Public Fund Account) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8166923.pdf
GEM_BID
Forklift_531c081d-4804-48c9-98671754023573085_buyer1_adrde.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .