| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹15.3 Laccepted-aoc | accepted-aoc |
Tender Value
₹17.2 L
EMD Value
₹18,000
Closing Date
27 Jul 2026, 3:00 pmClosed
Superintending Engineer,Tribal Welfare, Warangal
Opp: Abedkar Bhavan, Ahok Colony
Construction of Toilets and Bath Rooms to AHS (B) at Ramjiguda (V) Kerameri (M) in Kumaram Bheem Asifabad District
716020
SE/TW/WGL/NIT/269/2026-2027, Dt:06.07.2026
OPEN
Buildings
KOMRAM BHEEM
13 documents required · 9 mandatory · 4 optional
₹609
₹18,000
9 Oct 2026
10 Jul 2026
10 Jul 2026
Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)
Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed
Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedestals
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Column
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth Beam
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Roof Beam
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab 125mm thick
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Lintls
Brick Masonry in superstructure with CM (1:8) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqm including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., for Superstructure Walls.
Reinforced Fly Ash Brick Masonary partition walls 11.2 cm in CM(1:6) using Fly ash bricks of size 290 x 112 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust having a crushing strength of not less than 50.00kg/cm2 from approved source and using two mild steel bars of 6m dia in 6 every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges.
Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310 excluding seignerage & GST charges
Ceiling Plastering 12mm thick in CM (1:3) Single coat including cost and conveyance of all materials like cement, sand/rock sand (50:50), water etc., to site, , sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904)
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, water etc., to site, excluding sales & other taxes on all materials,including all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, water etc., to site, excluding sales & other taxes on all materials,including all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
Flooring with Non-skid red or white full body Ceramic floor tiles of size minimum of 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles, overheads & contractors profit etc., complete for finished item of work.
Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, any brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, natural river sand and manufactured sand (Rock sand) in the ratio of 50:50, water, tiles, etc. to site, excluding seigniorage charges, sales and other taxes on all materials, and all opertional, incidental and all labour charges such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work in all floors
Painting to External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., excluding sales & other taxes, including all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)
Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in Ground Floor (APSS No. 126) Category-B Steel
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Supply and fixing of premium make CPVC pipes and fitting to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes)1/2" to 2" SDR 13.5 pipes are made from idential CPVC compounds having the smae physical properties for Hot and Cold water (IS 15778:2007)15.90 mm dia OD Pipes SDR 13.50
Supply and fixing of premium make CPVC pipes and fitting to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes)1/2" to 2" SDR 13.5 pipes are made from idential CPVC compounds having the smae physical properties for Hot and Cold water (IS 15778:2007) 22.20 mm dia OD Pipes SDR 13.50
Supply and fixing of premium make CPVC pipes and fitting to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes)1/2" to 2" SDR 13.5 pipes are made from idential CPVC compounds having the smae physical properties for Hot and Cold water (IS 15778:2007)28.60 mm dia OD Pipes SDR 13.50
Supply and fixing of premium make CPVC pipes and fitting to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tube sizes)1/2" to 2" SDR 13.5 pipes are made from idential CPVC compounds having the smae physical properties for Hot and Cold water (IS 15778:2007) 34.90 mm dia OD Pipes SDR 13.50
Supplying & Fixing Orissa Pan 580 mm x 440 mm white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/ Neycer - ISI mark 580 mm x 440mm as approved by the Engineer-in-charge fixed in brick masonry with necessary ‘S’ trap of water closet, shall be encased in C.C. (1:2:4) 6" alround well above the joint, to stop leakage at the joint, cost & conveyance of all materials and labour charges etc., including sales and other taxes on all materials complete for finished item of work for all floors.
Supplying & Fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.
Providing & Placing on Terrace ( at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks inlcluding cost and conveyance of all materials to site labour charges etc., complete for finished item of work.
Supplying and fixing of 160mm dia 3 M Single Socket PVC/SWR pipe -4 Kg/sq.cm including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
Construction of 457.2x457.2 mm (1-6" x 1-6") brick in (1:6) prop; Masonary inspection chamber upto 914.4mm (3'-0) and fitted with light weight CI frame and coverof 20kg , including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work
Supplying and fixing of 110mm dia 3 M Single Socket PVC/SWR pipe -4 Kg/sq.cm including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)
Supplying and fixing of 4" (101.60mm) Multifloor tap with jali UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels.
Earth work excavation for Septic tank and depositing on bank for all lifts and with initial lead of 10m including operational, incidental, seigniorage charges, labour charges such as shoring, sheeting planking, strutting, dewatering etc., complete for finished item of work as per SS-20B (APSS No. 308)
Plain Cement Concrete (1:5:10) proportion (cement fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50, coarse aggregate, water etc. to site, mixing concrete in concrete mixer excluding seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., excluding Seigniorage charges.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Bottom Slab of 150mm thick
Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., excluding Seigniorage charges.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Side walls of 150mm thick.
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (natural river sand and Manufactured Sand (Rock sand) in the ratio of 50:50) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., excluding Seigniorage charges.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick
Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
ELECTRIFICATION
Supplying and wiring with 2 runs (14/0.30 mm)1.00 Sq.mm Fire Retardant (FR) P.V.C insulated 100W grader flexible copper cable L&T/ Havels /Standard/Polycab/Power flex make with ISI mark in the existing metallic / non-metallic conduct pipe with 6A flush type switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work for light, bell, fan and exhaust fan points in Non Residential Buildings
Supply and transportation of 20W + /- 10% >2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF≥0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI≥80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) of Milltec /Vimal opel / Maru mantero / Starex smil/ CPL make with ISI mark duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth and cost including ontinuity conveyance of all materials to site, labour charges and sales tax etc. complete for finished item of work
Supply and Run of 1 of 10 Sq.mm WPTC Finolex / ISI Aluminium wire of makes Polycab/ Gold Medal /million /Payal/ Power Flex along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including cost and conveyance of all materials to site, labour charges and sales tax etc., complete for finished item of work.
Supplying and fixing of batten holder / slanting holder anchor / Gold Medal olive / Million zoom make with ISI mark in lieu of ceiling rose of light point with 9w LED bulb all connections including cost and conveyance of all materials to site, labour charges for surface / flush mounting etc., sales tax complete for finished item of work.
Supply and fixing of ISI mark 25mm outer dia heavy grade FRLS with IS:9537 part 3 rigid PVC pipe Sudhakar / Macoplast / Modimake concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including wherever necessary , including necessary masonery work for light/fan pointand seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, etc., complete for finished item of work.
Supply and fixing of ISI mark 25mm outer dia medium grade FRLS with IS:9537 part 3 rigid PVC pipe Sudhakar / Macoplast / Modi make concealed in wall with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan pointand seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, etc., complete for finished item of work.
RUPEES SEVENTEEN LAKHS NINETEEN THOUSAND SIX HUNDRED AND NINETY TWO ONLY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BID NIT 269.doc
TENDER_DOCUMENT • 0.47 MB
BOQ NIT 269.xlsx
TENDER_DOCUMENT • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .