Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAdmitted-Finance | ₹9.2 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical UKHRA BARDHAMAN BARDHAMAN 713363 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | MUKHERJEE AND CHATTERJEE CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.00Discription of items | ||||
| 2.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or | 5.4 | Cum | 1,495 ₹8,073 Lowest |
| 3.00 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in-charge. | 5.4 | Cum | 2,150 ₹11,610 Lowest |
| 4.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.4 | Cum | 1,050 ₹5,670 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.4 | Cum | 6,000 ₹32,400 Lowest |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level | 22.69 | Cum | 6,850 ₹1,55,426.5 Lowest |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | 20.1 | Sqm | 265 ₹5,326.5 Lowest |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,361.4 | Kg | 95.5 ₹1,30,013.7 Lowest |
| 9.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 600 | Kg | 97.5 ₹58,500 Lowest |
| 10.00 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50mm (base | 56.25 | Sqm | 606 ₹34,087.5 Lowest |
Tender Value
₹10.9 L
EMD Value
₹13,700
Closing Date
10 Aug 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of Haulage in incline No. 1 for transportation of materials from surface to u/g mines of CM project at Nakrakonda- Kumardihi B Colliery under Bankola area.
2026_ECL_362631_1
ECL/GM/BA/E TENDER/26-27/ENM/18 Dt 27.07.2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹13,700
21 Aug 2026
27 Jul 2026
11 Aug 2026
27 Jul 2026
10 Aug 2026
27 Jul 2026
27 Jul 2026 - 1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Discription of items | - | - | - | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or | 5.4 | Cum | - | - |
| 3 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in-charge. | 5.4 | Cum | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 5.4 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.4 | Cum | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level | 22.69 | Cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | 20.1 | Sqm | - | - |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,361.4 | Kg | - | - |
| 9 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 600 | Kg | - | - |
| 10 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50mm (base | 56.25 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 1.28 MB
BOQ_375540.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .