Loading…
Loading…
Tender Value
₹18.7 Cr
EMD Value
₹37.4 L
Closing Date
3 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
Construction of boundary wall at vulnerable locations of encroachment in IGP-BSL- BD & BSL-KNW section (27.250 Km). Project id - 01.01.64.23.1.50.001
DRMWBSL192026t6
DRMWBSL192026t6
Open
12 Months
Unknown (Unspecified Location)
₹0
₹37.4 L
11 Jun 2026
11 Jun 2026
19 Jun 2026
BSL-KNW section (27.250 Km). Project id - 01.01.64.23.1.50.001
Item- 1 NS items
S No. Item Description of Item Unit Qty Rate Amount
1 NS-3 Providing & laying in position 7mm Dia HTS Kg 84029.00 137.00 11511973.00
Indented wires with UTS of 1470 MPa
confirming to IS-6003 for manufacturing of
PSC element by using mechanical pulling
arrangement like Rabbit/ Bed master including
all accessories for stressing & destressing
operations as per approved make etc,
complete as per drawings and direction of
Engineer - incharge. Note: The rate is inclusive
of all contractors labour, materials including,
cutting, pulling arrangement, machineries,
tools & plants, taxes etc. complete. Payment
will not be made for any wastages .
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
2 NS-5 "Providing & grouting of PSC Column with RCC Numbers 8380.00 709.00 5941420.00
Foundation as per approved drawing with M-
60 grade cementitious grout (Non Shrink) of
approved make by suitable means (Free
flowing/pump), curing etc. complete as per
directions of Engineer-in- charge. Note: The
rate is inclusive of all contractors labour, tools
& plants, all materials including approved
quality of non- shrink cementious grout og
M60 grade, aggregates, all machineries,
placing in position, etc. Complete in all
respect. Payment will not be made for any
3 NS-1A "Fabrication, Manufacturing & Transportation Each 25104.00 1293.00 32459472.00
of Precast Prestressed Concrete elements of
M45 grade design mix concrete (i) Fabrication
& manufacturing of Prestressed Concrete (Pre-
tensioned) elements such as panel, column
etc. as per approved drawing in Controlled
Factory Environment with approved
methodology by using long line casting met
hod. Concreting should be done by batch
mixing plant with capable of producing zero
slump concrete, transported through
mechnical arrangement & layed on the bed,
finishing, curing and also provision of steam
curing. Cutting, making necessary cutout/holes
of required sizes for services in PSC element
after achieving required strength, yard
handling & stacking all complete as per
approved shop drawings & design mix as per
the direction of the En gineer-in-charge . (Cost
of HTS wires shall be paid separately under
relevant item). (ii) Transportation of Precast
PSC Elements from casting yard to site of work
by suitable Truck/Trailor with proper
accessories, including the cost of loading,
unloading & stacking at site with the help of
required capacity cranes . (iii) The rate is
inclusive of all ingredients i.e. cement, sand,
aggregate, admixtures, water etc. including
handling, batching, mixing, transporting,
placing and vibrating of concrete, curing,
scaffolding, shuttering, formwork, mould,
staging, lifting arrangement as per approved
drawing etc. with all lead and lift with
contractor's own labour, tools & plants
machineries all taxes etc complete as required
for successful completion of the item. Note-1:
No payment shall be made for damaged
Precast elements Note-2: 70% payment shall
be made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position. Note-3:
Incase of change of size of precast PSC
element, payment shall be adjusted on
volumetric pro-rata basis. a) PSC Panel of Size
2330mm X 600mm X 80mm as per Approved
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
4 NS 4/c Erection & Installation of Precast PSC/RCC Each 8380.00 832.00 6972160.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment
of elements, within erection tolerance as per
IS:15916 as per approved shop drawings and
all complete as per the direction of Engineer
grouting shall be paid separately). Note-1: The
rate is inclusive of all contractors labour,
materials including machineries, tools &
plants, etc. complete. Note-2: In case of
c h a n g e of size of precast PSC element,
payment shall be adjusted on volumetric pro-
rata basis. c) RCC Foundation 1300mm X
800mm X 700mm as per Approved Type Plan
5 NS 4/a Erection & Installation of Precast PSC/RCC Each 25104.00 228.00 5723712.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment
of elements, within erection tolerance as per
IS:15916 as per approved shop drawings and
all complete as per the direction of Engineerin-
Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete.
Note-2: In case of change of size of precast
P S C element, payment shall be adjusted on
volumetric pro-rata basis. a) PSC Panel of Size
2330mm X 600mm X 80mm as per Approved
6 NS 4/b Erection & Installation of Precast PSC/RCC Each 8380.00 304.00 2547520.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment
of elements, within erection tolerance as per
IS:15916 as per approved shop drawings and
all complete as per the direction of Engineer
in- Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete.
Note-2: In case of change 250mm as per
Approved Type Plan of size of precast PSC
element, payment shall be adjusted on
volumetric pro-rata basis. b) PSC Cloumn (H-
Section) of size 2650mm X 250mm X
7 NS 4/d Erection & Installation of Precast PSC/RCC Each 8380.00 19.00 159220.00
elements in correct & final position with proper
line, level and plumb at site making all
arrangements (i.e cranes, push-pull jacks & all
other T&P) for lifting, placing, Steel Props for
holding in position after Erection & Alignment
of elements, within erection tolerance as per
IS:15916 as per approved shop drawings and
all complete as per the direction of Engineer
in- Charge. (Cost of grouting shall be paid
separately). Note-1: The rate is inclusive of all
contractors labour, materials including
machineries, tools & plants, etc. complete.
Note-2: In case of change of size of precast
P S C element, payment shall be adjusted on
volumetric pro-rata basis. d) Column Cap
300mm X 300mm X 150mm as per Approved
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
8 NS - "Fabrication, Manufacturing & Transportation Each 8380.00 1722.00 14430360.00
1/b of Precast Prestressed Concrete elements of
M45 grade design mix concrete (i) Fabrication
& manufacturing of Prestressed Concrete (Pre-
tensioned) elements such as panel, column
etc. as per approved drawing in Controlled
Factory Environment with approved
methodology by using long line casting met
hod. Concreting should be done by batch
mixing plant with capable of producing zero
slump concrete, transported through
mechnical arrangement & layed on the bed,
finishing, curing and also provision of steam
curing. Cutting, making necessary cutout/holes
of required sizes for services in PSC element
after achieving required strength, yard
handling & stacking all complete as per
approved shop drawings & design mix as per
the direction of the En gineer-in-charge . (Cost
of HTS wires shall be paid separately under
relevant item). (ii) Transportation of Precast
PSC Elements from casting yard to site of work
by suitable Truck/Trailor with proper
accessories, including the cost of loading,
unloading & stacking at site with the help of
required capacity cranes . (iii) The rate is
inclusive of all ingredients i.e. cement, sand,
aggregate, admixtures, water etc. including
handling, batching, mixing, transporting,
placing and vibrating of concrete, curing,
scaffolding, shuttering, formwork, mould,
staging, lifting arrangement as per approved
drawing etc. with all lead and lift with
contractor's own labour, tools & plants
machineries all taxes etc complete as required
for successful completion of the item. Note-1:
No payment shall be made for damaged
Precast elements Note-2: 70% payment shall
be made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position. Note-3:
Incase of change of size of precast PSC
element, payment shall be adjusted on
volumetric pro-rata basis. b) PSC Column CH-
Section) of size 2650mm X 250mm X 250mm
with grooved as per Approved Type Plan"
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
9 NS - Fabrication, Manufacturing & Transportation of Each 8380.00 4200.00 35196000.00
2/a Precast RCC elements of M30 grade design
mix concrete (i) Fabrication and
manufacturing of precast concrete element
such as foundation & column cap as per
approved drawing, manufactured in controlled
factory environment with approved
methodology including moulds, mixing,
transporting and placing of concrete, vibrating,
curing, finishing, making necessary
cutout/holes of required sizes for services,
yard handling & stacking all complete as per
IS:11447:1985 and as per approved shop
drawings and design mix as per the direction
of Engineer in Charge (Cost of steel for
reinforcement shall be paid separately under
relevant item ) . (ii) Transportation of Precast
RCC Elements from casting yard to site of work
by suitable Truck/Trailor with proper
accessories, including the cost of loading,
unloading & stacking at site with the help of
required capacity cranes. ((iii) The rate is
inclusive of all ingredients i.e. cement, sand,
aggregate, admixtures, water etc. including
handling, batching, mixing, transporting,
placing and vibrating of concrete, curing,
scaffolding, shuttering, formwork, mould,
staging etc. with all lead and lift with
contractor's own labour, tools & plants
machineries all taxes etc complete as required
for successful completion of the item. Note-1:
No payment shall be made for damaged
Precast elements. Note-2: 70% payment shall
be made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position . Note-3:
Incase of change of size of precast RCC
element, payment shall be adjusted on
volumetric pro-rata basis. a) RCC Foundation
1300mm X 800mm X 700mm as per Approved
BHUSAWAL DIVN-ENGINEERING/CENTRAL RLY
10 NS - Fabrication, Manufacturing & Transportation of Each 8380.00 97.00 812860.00
2/b Precast RCC elements of M30 grade design
mix concrete (i) Fabrication and
manufacturing of precast concrete element
such as foundation & column cap as per
approved drawing, manufactured in controlled
factory environment with approved
methodology including moulds, mixing,
transporting and placing of concrete, vibrating,
curing, finishing, making necessary
cutout/holes of required sizes for services,
yard handling & stacking all complete as per
IS:11447:1985 and as per approved shop
drawings and design mix as per the direction
of EngineerinCharge (Cost of steel for
reinforcement shall be paid separately under
relevant item ) . (ii) Transportation of Precast
RCC Elements from casting yard to site of work
by suitable Truck/Trailor with proper
accessories, including the cost of loading,
unloading & stacking at site with the help of
required capacity cranes. ((iii) The rate is
inclusive of all ingredients i.e. cement, sand,
aggregate, admixtures, water etc. including
handling, batching, mixing, transporting,
placing and vibrating of concrete, curing,
scaffolding, shuttering, formwork, mould,
staging etc. with all lead and lift with
contractor's own labour, tools & plants
machineries all taxes etc complete as required
for successful completion of the item. Note-1:
No payment shall be made for damaged
Precast elements. Note-2: 70% payment shall
be made when PSC elements reach to site and
balance 30% payment shall be made after
erection & placement in position . Note-3:
Incase of change of size of precast RCC
element, payment shall be adjusted on
volumetric pro-rata basis. b) Column Cap
300mm X 300mm X 150mm as per Approved
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
drmwbsl192026t6.pdf
ATTACHMENT
GCC-2022-uptoACS10.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
AnnexureVIAFormatofEMDandPBG.pdf Annexure VIA Format of EMD and PBG
ATTACHMENT
PCEcircular.pdf
ATTACHMENT
BeneficiaryName.pdf
ATTACHMENT
BlankJVstandardformportion.pdf
ATTACHMENT
BidCapacityNew.pdf
ATTACHMENT
FormatforvalueofBforBidcapacity.pdf
ATTACHMENT
AnnexureVIAFormatofEMDandPBG.pdf
ATTACHMENT
Download all tender documents and submit your bid