Construction of Storm Water Drainage System in Longding Market area
2026_APUDH_3190_1
EE/UD/LDG/SWD/2026
Open Tender
Civil Works
Item Rate
365 days
Longding
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EE (UD) Longding
₹93,597
18 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
25 Mar 2026
18 Mar 2026
SH:RCC Drain with slab cover - 556.06 Mtrs.
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced concrete work in foundations,footings,bases of columns etc. and mass concrete excluding cost of centering,shuttering and reinforcement in: A) M20 1:1.5:3 (1cement:1.5 course sand:3 stone aggregate 20mm nominal size).
Reinforement cement concrete in walls(any thickness including attached pillasters,Buttresses, Plinth Wall and string course filet etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1cement:3fine sand) of thickness not exceeding 6mmm to gives a smooth and even surface excluding cost of centering and shuttering and reinforcemrnt. A) M20 1:1.5:3 (1cement:1.5 course sand:3 stone aggregate 20mm nominal size).
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending,binding and placing in position complete. a) Tar/TMT steel
12mm cement plaster 1:3(1cement:3 fine sand)
Neat Cement punning
Centring and shuttering including strutting,proping etc and removal of form work for a) Foundation and plinth
b)Wall(Any thickness) including attached pilasters, buttresses, plinth and string courses etc.
c) Suspended floors,roofs,landings shelves and their supports,balconies and chajjas 3.5m height).
Add Carriage Charge
SH:Cattle Trap/Culvert - 3 Nos.
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Reinforced concrete work in foundations,footings,bases of columns etc. and mass concrete excluding cost of centering,shuttering and reinforcement in: A ) M20 1:1.5:3(1cement:1.5 course sand:3 stone aggregate 20mm nominal size).
Reinforement cement concrete in walls(any thickness including attached pillasters,Buttresses, Plinth Wall and string course filet etc from top of foundation upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1cement:3fine sand) of thickness not exceeding 6mmm to gives a smooth and even surface excluding cost of centering and shuttering and reinforcemrnt. A) M20 1:1.5:3(1cement:1.5 course sand:3 stone aggregate 20mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete. a) Tar/TMT steel
12mm cement plaster 1:3(1cement:3 fine sand)
Neat Cement punning
Centring and shuttering including strutting,proping etc and removal of form work for a) Foundation and plinth
b)Wall(Any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. b) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Add Carriage Charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.61 MB
NIT_SWD_LND.pdf
Tender Documents • 3.54 MB
BOQ_3388.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .