Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,940
Closing Date
3 Oct 2026, 6:00 pm6d left
Executive Engineer RRWD SMC
Executive Engineer RRWD REGAL LANE LAL CHOWK
Construction of grill fencing of Graveyard opp Syed Masjid at Saderbal
2026_HAUDD_325710_1
NOTICE INVITING ETENDER No. 37 of 2026-2027 Dated 22.09.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Graveyard opp Syed Masjid at Saderbal
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹200
FA/CAO AC NO 0216010200000007
₹4,940
22 Sept 2026
22 Sept 2026
5 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for Site Clearance | 2 | No. | 553 | ₹1,106 |
| - | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 0.68 | Cum | 1,458.45 | ₹991.75 |
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 1.21 | Cum | 1,725.2 | ₹2,087.49 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.81 | Cum | 5,733.6 | ₹39,045.82 |
| - | Centring and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 33.07 | Sqm | 286.35 | ₹9,469.59 |
| - | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 42.58 | Sqm | 266.2 | ₹11,334.8 |
| - | EXTERIOR FINISHING: Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 42.59 | Sqm | 98.75 | ₹4,205.76 |
| - | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete: Hot finished welded type tubes | 980 | Kgs | 156.95 | ₹1,53,811 |
| - | Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications: Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/ 10sqm of approved brand and manufacture | 72.84 | Sqm | 142.05 | ₹10,346.92 |
| - | Providing and fixing of Track Dac Powder Coated Sheet roofing including cost of screws, etc in roofs, walls, gables etc complete as per directions of Engineer in Charge | 5.94 | Sqm | 1,250 | ₹7,425 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1101147.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .