| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC | ₹2.6 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.0 Cr+₹39.4 L (15.3%)Rejected-Finance | ₹3.0 Cr+₹39.4 L (15.3%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹3.6 Cr+₹1.1 Cr (41.3%)Rejected-Finance | ₹3.6 Cr+₹1.1 Cr (41.3%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹3.7 Cr+₹1.2 Cr (45.6%)Rejected-Finance | ₹3.7 Cr+₹1.2 Cr (45.6%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹3.9 Cr+₹1.3 Cr (49.8%)Rejected-Finance UNIT NO 143 PLOT NO 3B KH NO 56 23 PEHLADPUR ROAD MAHADEV CHOWK NORTH WEST DELHI DELHI 110042 UDYAM DL 06 0137637 | NORTH DELHI | DELHI | 110042 | ₹3.9 Cr+₹1.3 Cr (49.8%) | L5 | Rejected-Finance Being L5 |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
8 Aug 2023, 6:55 pmClosed
GM(CIVIL)
NHPC Limited, Dibang Multipurpose Project,Roing,Ar.P-792110
Design, Supply ,Fabrication, installation and commissioning of double storey Pre-Fabricated NHPC Administrative Building at Chimri, Dibang Multipurpose Project, Arunachal Pradesh of Area 1047.00
2023_NHPC_761602_1
NH/DMP/PNC/NIT/2023/04 dtd 18.07.2023
Open Tender
Civil Works
Works
120 days
NHPC Limited, Dibang Multipurpose Project
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
NHPC Limited
₹6.8 L
Yes
29 Nov 2023
18 Jul 2023
16 Aug 2023
18 Jul 2023
8 Aug 2023
18 Jul 2023
Amount
Pre-Fabricated NHPC Administrative Building at Chimri
Design, Supply, Fabrication, installation and commissioning of double storey Pre-Fabricated NHPC Administrative Building at Chimri, Dibang Multipurpose Project, Arunachal Pradesh”as per TS and Scope of Work
Earth work in excavation in soils containing 50% or more of shingle or small size boulders upto 30 cm size including banking in 20 cm layers and breaking clods, ramming and dressing up for the purpose of making embankments or filling up ground depressions lead upto 50 m and lift up to 1.50 m.
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Random rubble masonry with hard stone in foundations and plinth in cement mortar 1 : 6 (1 cement : 6 fine sand) including levelling up with cement concrete 1 : 6 : 12 (1 cement : 6 coarse sand :12 stone aggregate 20 mm nominal size) at plinth level
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) foundations and plinth
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Construction of cement concrete drain 30 cm wide and 23 cm deep in cement concrete 1 : 3 : 6 (1 cement : 3 sand : 6 hard graded stone chips/shingle 40 mm and down gauge) 8 cm thick on sides and bottom and plastering on all exposed surfaces with 12 mm thick cement mortar1 : 3 (1 cement : 3 fine sand) including shuttering complete
Making plinth protection 50 mm thick of cement concrete 1 : 3 : 6 (1 cement :3 coarse sand : 6 stone aggregate using 20 mm nominal size) over 75 mm bed of stone ballast 40 mm nominal well rammed and consolidated and grouted with fine sand including finishing the top smooth
Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand).
Reinforcement cement concrete works in lintels,Beams amd bresumers upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1 cement: 3 fine sand) of thickness not ecxceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a)M20 ( 1 Cement: 1.5 Coarse Sand : 3 Stone Aggregate 20 mm nominal size)
Providing and fixing bolts above 300 mm in length including nuts and washers complete.
Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/TMT Steel
Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete.
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete b) Size of Tile 600x600 mm
Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1: 4 (1 Cement : 4 Coarse Sand), Jointing with grey cement slurry @ 3.3 Kg/Sqm including pointing the joints with white cement and matching pigment etc., complete.
Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads
Cost of Haulage Excluding Loading and Unloading on hill roads . Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road.
Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint b) In Tees, Angles, Flats and Channels
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings.This includes jointing of pipes & fittings with one step CPVC solvent cement,trenching, refilling & testing of joints complete as per direction of Engineer in Charge :(a)External work (iv) 32 mm nominal outer dia Pipes
Providing and fixing brass full way valve with wheel of approved quality a) 32 mm nominal bore
Providing and fixing brass stop cock of approved quality. d) 32 mm nominal bore
Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
Providing and laying in cement concrete 1:3:6 ( 1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size)excluding the cost of centring and shuttering in - (a) foundation and plinths.
Centering and shuttering including strutting , propping etc. and removal of form for :c) Suspended floors, roofs, landing shelves and their supports, balconies and chajjas (3.5 m height)
Reinforced cement concrete work in suspended floors ,roofs,landing and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3(1 cement:3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding excluding cost of centring, shuttering and reinforcement with M-20 (1 cement :1.5 coarse sand : 3 stone aggrigate 20mm normal size)
15 mm Cement Plaster 1:4 (1 cement : 4 fine sand) on the rough side of single or half brick wall
Constructing brick masonry manhole with 2nd class bricks in cement mortar 1 : 5 (1 cement : 5 fine sand) RCC top slab with 1 : 2 : 4 mix (1 cement : 2 coarse sand : 4 stone single 20 mm nominal size), foundation concrete 1 : 4 : 8 mix (1 cement : 4 coarse sand : 8 stone aggregate 40 mm nominal size) inside plastering 12 mm thick with cement mortar 1 : 3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making channels in cement concrete 1 : 2 : 4 mix (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size) neatly finished complete as per standard design. (a) Inside size 90 x 80 cm and 45 cm deep including CI cover with frame (light duty) 455 x 610 mm internal dimensions total weight of cover and frame to be not less than 38 Kg (weight of cover and frame to be not less than 38 kg, (weight of cover 23 Kg and weight of frame 15 Kg).
Providing M.S. foot rests including fixing in manholes with 20x20x10cm cement concrete blocks 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) as per standard design :19.15.1 With 20x20 mm square bar
Making soak pit 2.50 m dia 3 m deep with 45 x 45 cm dry brick honeycomb shaft and SW drain pipe 100 mmdia 1.80 m long complete as per standard design.
Providing, laying and jointing glazed stoneware pipe grade 'A' with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc. complete :(b)150 mm dia SW pipes
Providing and laying cement concrete 1 : 5 : 10 (1 cement : 5 lime sand : 10 graded stone aggregate 40 mm nominal size) all around SW Pipe including bed concrete 15 cm thick as per standard design. : (b) 150 mm dia SW pipes
Providing and fixing sand cast iron/ cast iron (spun) soil, waste and vent pipes.a) 100 mm dia
Providing and fixing sand cast iron/ cast iron (spun) soil, waste and vent pipes.b) 75 mm dia
M/s North East Engineering & Construction Agency
M/s. Tama Fabrication Works
m/s rinya yangfo construction
SUNSHINE AND CO.
GREEN ENERGYZ
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .