| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.1 LAccepted-Finance | ₹21.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹21.1 L+₹2,116.27 (0.10%)Rejected-Finance 169 GARIWAN TOLA ALLAHABAD PRAYAGRAJ ALLAHABAD UTTAR PRADESH 211003 | PRAYAGRAJ | UTTAR PRADESH | 211003 | ₹21.1 L+₹2,116.27 (0.10%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹43,000
Closing Date
25 May 2026, 10:30 amClosed
EE RED Shamli
EE RED Office Shamli
New construction work of three rooms for running Kendriya Vidyalaya in Krishna Vidya Mandir High School Village Kabdaut special repair work of previously constructed rooms construction work of toilets.
2026_REDUP_1150698_2
73/EERED/TENDER/2026-27/ Dt 24-04-2026
Open Tender
Civil Works
Percentage
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹43,000
28 Jul 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismanteling of old CC flooring / Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202.(1:2:4) cement,C/sand& 20mm S/gritt I/C all comp. | 10.57 | CUM | 644.59 | ₹6,813.32 |
| 2 | Excavation in foundation in ordinary soil (Loam clay, or sand) including lift upto 1.50 mts and lead upto 30 m. & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches. | 23.89 | CUM | 134.37 | ₹3,210.1 |
| 3 | Concrete with 4 cm. gauge STONE ballast, C/sand of 1.25 finess modulous and cement in proportion of 10:5:1 in foundations and floors including supply of all materials, labour and T & P etc. required for proper completion of work. | 0.89 | CUM | 4,934.58 | ₹4,391.78 |
| 4 | First class brick work in 1:6 cement and F/ sand of 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T & P etc. required for proper completion of work. | 1.13 | CUM | 5,399.11 | ₹6,100.99 |
| 5 | M-150 Class B/W (1:4) cement C/sandMortor in foundation up to plinth SI-303 | 3.06 | CUM | 7,073.67 | ₹21,645.43 |
| 6 | First class brick work in 1:6 cement and F/sand of 1.25 F.M. mortar in superstructure including necessary cutting & moulding of brick as required thickness of walls of one brick thick, including supply of all materials labour and T & P etc. required for proper completion of work. | 52.8 | CUM | 6,893.2 | ₹3,63,960.96 |
| 7 | R.C.C. work with cement, approved coarse sand and 2 cm. gauge approved stone ballast in proportion of 1:1.50:3 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including necessary centering and shuttering etc. and also including supply of all materials, T&P etc.required for proper completion of work. | 3.54 | CUM | 6,847.63 | ₹24,240.61 |
| 8 | Centering and shuttering I/c strutting propping etc and removal of form for Roof slab./DSRV-1/5.9.3/=927.25*0.757=701.928 | 165.14 | sqm | 701.93 | ₹1,15,916.72 |
| 9 | R.C.C. work with cement, approved coarse sand and 2 cm. gauge approved stone ballast in proportion of 1:1.5:3 for slabs and excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including necessary centering and shuttering etc. and also including supply of all materials, T & P etc. required for proper completion of work. | 27.15 | CUM | 8,215.68 | ₹2,23,055.71 |
| 10 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work ( when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over lapping and hooks. | 24.09 | QTL | 8,107.47 | ₹1,95,308.95 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.85 MB
BOQ_2154937.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .