Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC DUE TO LOWEST RATE |
| 2 | L2₹3.5 CrRejected-Finance ALAMPUR FATEHPUR JANPAD ALIGARH | ALIGARH | UTTAR PRADESH | ₹3.5 Cr | L2 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 3 | L3₹3.6 CrRejected-Finance | ₹3.6 Cr | L3 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 4 | L4₹3.6 CrRejected-Finance NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹3.6 Cr | L4 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| 5 | L5₹4.2 CrRejected-Finance ASHOK NAGAR ETAWAH ETAWAH UTTAR PRADESH 206001 | ETAWAH | UTTAR PRADESH | 206001 | ₹4.2 Cr | L5 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
| Sl No | Description | Qty | Unit | M/S RANA PRATAP SINGH L3 | BHAMAR SINGH L2 | SHIV SUNDER CONSTRUCTION & CONSULTANTS PVT LTD L6 | M/S KANISHK INFROLOGISTICS PVT LTD L1 | GSB DEVELOPERS PRIVATE LIMITED L4 | M/S UNITE ENTERPRISES L7 | singh iron industries L5 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting of bank as per drawing By Hydraulic excavator (Poclain) of capacity 60 cum per hour ie 2592/60 including all lead and lift ,cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 72,553.2 | Cum | 31 ₹22.5 L | 40 ₹29.0 L | 15 ₹10.9 L | 30 ₹21.8 L | 42 ₹30.5 L | 58.1 ₹42.2 L | 26 ₹18.9 L |
| 2.00 | Earth work in back filling as per drawing By Hydraulic excavator (Poclain) of capacity 60 cum per hour ie 2592/60 including all lead and lift ,cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 30,405.3 | Cum | 31 ₹9.4 L | 50 ₹15.2 L | 15 ₹4.6 L | 30 ₹9.1 L | 52 ₹15.8 L | 58.1 ₹17.7 L | 26 ₹7.9 L |
| 3.00 | Supplying, laying & Placing of 9mm ,4 strands poly propelene Rope Gabion size 1.80 Mx1.80Mx0.50M with Lid and slings ,150 mmx150 mm mesh size filled with RBM inWoven Geotextile bags size1.00 M X 0.75M(outer to outer) 200 GSM, sewing by Geotextile material,sewing Machine including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 10,170 | Cum | 1,925 ₹2.0 Cr | 1,600 ₹1.6 Cr | 2,700 ₹2.7 Cr | 1,800 ₹1.8 Cr | 1,605 ₹1.6 Cr | 2,355 ₹2.4 Cr | 2,650 ₹2.7 Cr |
| 4.00 | Supplying Laying & Filling 3.0 M dia 20 M long Techtube Geotextile Tube made of 80 KN Bi-axial strength multifilament woven Geotextile including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 135 | No | 39,592 ₹53.4 L | 45,000 ₹60.8 L | 55,000 ₹74.3 L | 50,000 ₹67.5 L | 45,010 ₹60.8 L | 42,890 ₹57.9 L | 51,000 ₹68.8 L |
| 5.00 | Supplying ,Laying & Placing of Porcupine sets on river bed ,casted with R.C.C (1:1.5:3 ) consisting of 6 member, each member size 0.1M x0.1M x 3.0 M including cost of,nut bolt ,reinforcement ,all material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 840 | No | 4,091 ₹34.4 L | 5,500 ₹46.2 L | 5,600 ₹47.0 L | 5,600 ₹47.0 L | 5,510 ₹46.3 L | 6,245 ₹52.5 L | 5,500 ₹46.2 L |
| 6.00 | Supplying and bracing Bamboo size 50 mm to 80 mm dia for Bracing of porcupine sets including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 11,592 | RM | 54 ₹6.3 L | 80 ₹9.3 L | 20 ₹2.3 L | 50 ₹5.8 L | 85 ₹9.9 L | 72 ₹8.3 L | 30 ₹3.5 L |
| 7.00 | Supplying & filling of Jhankar/ Behaya in porcupine screen including cutting of Jhankhar including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge. | 15,120 | Cum | 231 ₹34.9 L | 200 ₹30.2 L | 110 ₹16.6 L | 100 ₹15.1 L | 202 ₹30.5 L | 285 ₹43.1 L | 45 ₹6.8 L |
Tender Value
₹5.1 Cr
EMD Value
₹10.3 L
Closing Date
21 Mar 2026, 3:30 pmClosed
Superintending Engineer
Irrigation Works Circle Sitapur
Anti-erosion work to protect the villages Master Purva, Budhnapur, Katkola, Babupurva and others situated on the right bank of Sharda river under Tehsil Laharpur in Sitapur district from the erosion of Sharda river (Lot No.-02)
2026_UPIDC_1122433_11
03/SE/2025-26
Open Tender
Civil Works
90 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹10.3 L
18 Apr 2026
16 Mar 2026
21 Mar 2026
16 Mar 2026
21 Mar 2026
16 Mar 2026
Earth work in cutting of bank as per drawing By Hydraulic excavator (Poclain) of capacity 60 cum per hour ie 2592/60 including all lead and lift ,cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Earth work in back filling as per drawing By Hydraulic excavator (Poclain) of capacity 60 cum per hour ie 2592/60 including all lead and lift ,cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Supplying, laying & Placing of 9mm ,4 strands poly propelene Rope Gabion size 1.80 Mx1.80Mx0.50M with Lid and slings ,150 mmx150 mm mesh size filled with RBM inWoven Geotextile bags size1.00 M X 0.75M(outer to outer) 200 GSM, sewing by Geotextile material,sewing Machine including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Supplying Laying & Filling 3.0 M dia 20 M long Techtube Geotextile Tube made of 80 KN Bi-axial strength multifilament woven Geotextile including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Supplying ,Laying & Placing of Porcupine sets on river bed ,casted with R.C.C (1:1.5:3 ) consisting of 6 member, each member size 0.1M x0.1M x 3.0 M including cost of,nut bolt ,reinforcement ,all material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Supplying and bracing Bamboo size 50 mm to 80 mm dia for Bracing of porcupine sets including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
Supplying & filling of Jhankar/ Behaya in porcupine screen including cutting of Jhankhar including all cost of material,labour,T&P etc required for proper completion of work as per direction of engineer in charge.
stage.html
html • 0.06 MB
technical_2099436.pdf
techsummary_2099436.pdf
finance_2099436.pdf
BOQ Comparative Chart
xlsx
finsummary_2099436.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_2099436.xls
BOQ • 0.28 MB
BID_Lot-2.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid