| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical AT PO KULEI PS BANPUR KHORDHA 752034 | KULEI | KHORDHA | ODISHA | 752034 | Accepted-Technical ACCEPTED |
| 2 | Accepted-Technical | Accepted-Technical ACCEPTED |
| 3 | Accepted-Technical | Accepted-Technical ACCEPTED |
Tender Value
₹81.7 L
EMD Value
₹81,698
Closing Date
23 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO,CHILIKA
AT/PO-GANGADHARPUR, DIST-KHORDHA
CONSTRUCTION OF BLOCK LEVEL CONVENTION CENTRE CHILIKA
2026_PRCHK_144730_1
05/CPS/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
CHILIKA BLOCK
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹81,698
Yes
25 Nov 2026
31 Oct 2026
25 Nov 2026
31 Oct 2026
23 Nov 2026
31 Oct 2026
31 Oct 2026 - 23 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work : AR0102aa (Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 292.73 | CUM | 282.89 | ₹82,808.18 |
| 2 | Earth Work : AR0115 (Filling foundation and plinth with sand well watered and rammed) : Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 232.97 | CUM | 1,283.4 | ₹2,98,990.75 |
| 3 | Concrete : AR0303 (Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal) : Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 58.77 | CUM | 6,142.67 | ₹3,61,029.17 |
| 4 | R.C.C. Work : AR0405A (RCC work of M-25 grade with 20mm and downgrade black hard granite (crusher broken)stone chips including hoisting and laying (including centering and shuttering) (for column-based/footing/mass concrete )) :
Reinforced cement concrete work of M-25 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) | 233.42 | CUM | 6,520.57 | ₹15,22,021.62 |
| 5 | R.C.C. Work : AR0410c (R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs etc) : Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc | 383.42 | SQM | 217.24 | ₹83,296.84 |
| 6 | R.C.C. Work : AR0410d (Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting) : Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, girder and bressmer, etc. Data for 4.2sqm | 478.74 | SQM | 1,060.61 | ₹5,07,756.54 |
| 7 | R.C.C. Work : AR0410e (Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting) : Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm | 82.02 | SQM | 502.39 | ₹41,205.05 |
| 8 | R.C.C. Work : AR0410a (Centring & Shuttering for R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas) : Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height | 454.21 | SQM | 768.81 | ₹3,49,198.15 |
| 9 | Masonry Brick Work : AR0603b (Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth) : Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 28.85 | CUM | 5,426.05 | ₹1,56,526.4 |
| 10 | Masonry Brick Work : AR0603bi (Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure) : Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 87.79 | CUM | 6,133.69 | ₹5,38,492.06 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
DTCNBCC98.pdf
Tender Documents • 1.26 MB
BOQ_616901.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .