| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST TENDER VALUE | |
| 2 | Rejected-Technical | - | Rejected-Technical Highest Tender Value |
| Sl No | Description | Qty | Unit | N.Sanjeevi L2 | VIJAYALAKSHMI L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all class of soil and sub soils such in hard stiff clay, stiff black cotton soil, hard red earth, Earth mixed with 50% fair sized boulders and hard gravellysoil and depositing on bank with initial lead and lift as per SS 20B etc. complete | 22.46 | m3 | 265 ₹5,951.9 | 263 ₹5,906.98 Lowest |
| 2.00 | Supply and filling in foundation and basement with filling sand in layer and including all cost and conveyance of all charges etc. complete | 14.35 | m3 | 2,274 ₹32,631.9 | 2,271 ₹32,588.85 Lowest |
| 3.00 | C.C.1:4:8 mix using 40mm size HBG metal including all cost and conveyance of all cost and conveyance etc. complete | 7.2 | m3 | 6,175 ₹44,460 | 6,174 ₹44,452.8 Lowest |
| 4.00 | R.C.C. 1:11/2:3 mix using 20mm size HBG metal including all cost and conveyance of all charges etc. complete. Column up to Basement | 7.24 | m3 | 10,078 ₹72,964.72 | 10,075 ₹72,943 Lowest |
| 5.00 | R.C.C. 1:11/2:3 mix using 20mm size HBG metal including all cost and conveyance of all charges etc. complete. Column up to Roof | 8.36 | m3 | 10,219 ₹85,430.84 | 10,217 ₹85,414.12 Lowest |
| 6.00 | Brick work in C.M. 1:5 mix using country bricks of size 8 ¾ x4 ¼ x2 ¾ including cost and conveyance ofall materials to site and including all labour charges etc. complete as per std. specification | 7.66 | m3 | 6,285 ₹48,143.1 | 6,282 ₹48,120.12 Lowest |
| 7.00 | Supply and erecting centering for sides and soffits all labour charges forcentering and other incidental charges etc. complete as per std. specification. Column up to Basement | 37.5 | m2 | 550 ₹20,625 | 547 ₹20,512.5 Lowest |
| 8.00 | Supply and erecting centering for sides and soffits all labour charges forcentering and other incidental charges etc. complete as per std. specification. Column up to Basement Column up to Roof level | 73.33 | m2 | 1,097 ₹80,443.01 | 1,095 ₹80,296.35 Lowest |
| 9.00 | Supplying and fabrication of steel including all labour charges etc complete | 2.7 | MT | 91,925 ₹2,48,197.5 | 91,924 ₹2,48,194.8 Lowest |
| 10.00 | Plastering in Cement Mortar 1:3 mix 10mm thick including all cost and conveyance etc.complete | 72.75 | m2 | 335 ₹24,371.25 | 333 ₹24,225.75 Lowest |
Tender Value
₹9 L
EMD Value
₹9,000
Closing Date
23 Feb 2026, 3:00 pmClosed
BDO BP, Panruti
Panchayat Union, Panruti
Construction of Resting Shed (Karuma kaariya Kottakai) at Semakottai Panchayat in Panruti block.
2026_RDTN_654828_1
A2/1478/2025 MLACDS (PANRUTI) - 23.02.2026
Open Tender
Civil Works - Others
Item Wise
180 days
Panchayat Union, Panruti
As per Tender
3 documents required · 3 mandatory
₹0
₹9,000
Panchayat Union, Panruti
11 Mar 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
23 Feb 2026
11 Feb 2026
20 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all class of soil and sub soils such in hard stiff clay, stiff black cotton soil, hard red earth, Earth mixed with 50% fair sized boulders and hard gravellysoil and depositing on bank with initial lead and lift as per SS 20B etc. complete | 22.46 | m3 | 1.25 | ₹28.08 |
| 2 | Supply and filling in foundation and basement with filling sand in layer and including all cost and conveyance of all charges etc. complete | 14.35 | m3 | 100 | ₹1,435 |
| 3 | C.C.1:4:8 mix using 40mm size HBG metal including all cost and conveyance of all cost and conveyance etc. complete | 7.2 | m3 | 53 | ₹381.6 |
| 4 | R.C.C. 1:11/2:3 mix using 20mm size HBG metal including all cost and conveyance of all charges etc. complete. Column up to Basement | 7.24 | m3 | 53 | ₹383.72 |
| 5 | R.C.C. 1:11/2:3 mix using 20mm size HBG metal including all cost and conveyance of all charges etc. complete. Column up to Roof | 8.36 | m3 | 53 | ₹443.08 |
| 6 | Brick work in C.M. 1:5 mix using country bricks of size 8 ¾ x4 ¼ x2 ¾ including cost and conveyance ofall materials to site and including all labour charges etc. complete as per std. specification | 7.66 | m3 | - | - |
| 7 | Supply and erecting centering for sides and soffits all labour charges forcentering and other incidental charges etc. complete as per std. specification. Column up to Basement | 37.5 | m2 | 53 | ₹1,987.5 |
| 8 | Supply and erecting centering for sides and soffits all labour charges forcentering and other incidental charges etc. complete as per std. specification. Column up to Basement Column up to Roof level | 73.33 | m2 | 53 | ₹3,886.49 |
| 9 | Supplying and fabrication of steel including all labour charges etc complete | 2.7 | MT | - | - |
| 10 | Plastering in Cement Mortar 1:3 mix 10mm thick including all cost and conveyance etc.complete | 72.75 | m2 | 53 | ₹3,855.75 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_785149.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
TechnicalBid.pdf
Tender Documents • 0.79 MB
BOQ_785149.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .