Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
19 Jul 2024, 2:00 pmClosed
Executive Engineer PHE Ground Water Division Srg
Executive Engineer PHE Ground Water Division Srg Bagi Ali Mardan Nowshera Srinagar
Construction of 125 mm Machine Drilled Hand Pump at ITI Lalpora Lolab
2024_PHE_252835_1
E. NIT No.12/JS-PHE/GWDS/Mech. of 2024-25
Open Tender
Drilling Works
Item Rate
7 days
Lalpora Lolab
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer PHE Ground Water Division Srg
₹10,000
Yes
22 Jul 2024
11 Jul 2024
19 Jul 2024
11 Jul 2024
19 Jul 2024
12 Jul 2024
Amount
Shifting of all machinery at site, carriage, loading and un loading of accessories required for complete work, The job shall include all logistic support in terms of men, machinery and stores at site. The charges on account of loading/ unloading, shifting of men & machinery arranged, clearing of debris at site if needed, leveling of ground required for smooth work, Haltage charges of the transport arranged for shifting of skilled and unskilled labors, men and machinery tools and tackles up to site of work.Drilling/Boring of 125 mm diameter tube well by air rotary drilling rig unit suitable for lowering of MS casing of 125mm diameter in suitably drilled bore hole as per specifications laid down in IS 2800 (Part-I) with up to date amendments. The job is to be done in all kinds of soils, boulder, rocks, collapsible strata, saturated soils, artisan conditions by DTH/ODEX attachments and exploration of ground water by tapping sufficient aquifer zones. The job includes the cost of drilling accessories, tools, bits, casing shoe, consumables like fuel, lubricants, skilled and unskilled labours and other unforeseen items. Development of tube well with backwash method with air compressor of minimum capacity 1000 CFM (300 PSI air delivery system with suitable arrangements till well is thoroughly developed in all respects as per the directions of site engineer.
Supply, Providing, Fitting, assembling and Lowering in vertical position in above drilled bore of Mild Steel plain and beveled ended 125mm dia. (Class B) as per IS: 4270 Casing pipes and subsequent lowering of casing assembly and its welding after every 10 feet, up to the drilled/desired depth. The whole casing pipe is inclusive of slotted pipe, which is to be used as per the site requirement and as directed by site engineer. The pipe shall be lowered up to the desired level BGL. The average length of each pipe shall not exceed 3.00 Mts. The welding electrodes used for welding the pipe shall confirm to relevant IS codes. The specifications of the tube well shall be as under: As per IS: 2800 (Part I & II)
Providing and laying of cement block of4x4 feet size and 0.3 m (1ft) deep in a mix of 1:3: 6 to adequate the strength to act as sanitary block for the well and grout the hand pump assembly in order to make it robust to resist shock load observed while pumping not available the surface area is adjusted accordingly .The block comprises mud mat of 4 inch height and then laying of 8 inch cement concrete. and Providing Laying of cement plaster in 1:4 mix to the above block to give aesthetically good appearance. Cost on account of stuttering, strutting, centring, curing etc. is included in the scope of work. In case the suitable space for the above specification is not available, the surface area is to be adjusted accordingly.
Harnessing and yield test of the tube well by way of Shifting all the men and machinery at site, carriage, loading, un loading, hire charges of DG set, submersible pumping unit, Tripod for lowering of pumping unit along with column pipes, starter, cable, tools and accessories and skilled labours and harnessed in accordance with IS: 11189-1985 to establish maximum rate of usable water yield without sand contents and without any other chemical contents by using submersible pumping unit. The pumping operation of well shall be continued till the measuring yield is achieved not less then 1000 GPH. by step draw down method and turbidity level comes below 5 NTU and collecting the water sample and shall be tested in central laboratory, all complete.
AL AMEEN INFRASTRUCTURES
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .