Loading…
Loading…
Tender Value
₹8.2 Cr
EMD Value
₹7.3 L
Closing Date
27 Oct 2026, 6:00 pm
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
PROVN OF B VEH DRIVING TRG TRACK AT BAMBOLIM UNDER GE PANAJI
2026_MES_791188_1
84700
Open Tender
Civil Works
Item Rate
360 days
Garrison Engineer Panaji
Class S and Category a(v) Roads
7 documents required · 7 mandatory
₹3,000
Garrison Engineer Panaji, Goa
₹7.3 L
Yes
29 Sept 2026
29 Sept 2026
3 Nov 2026
29 Sept 2026
27 Oct 2026
20 Oct 2026
30 Sept 2026 - 7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing not exceeding 15 cm deep and averaging 15cm deep in any type of soil and getting out including clearing away all grass, vegetation, saplings, shrubs, brushwood, undergrowth, roots, and trees not exceeding 30 cm girth (measured one metre above ground level) including digging out roots all as specified and directed. | 15,908.33 | Square Metre | - | - |
| - | Earth work in excavation by Mechanical means (Hydraulic excavator) / Manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) and not exceeding 1.5 m in depth in all kind of soil including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m , all as specified and directed. | - | Cum | - | - |
| - | Earth work in excavation by Mechanical means (Hydraulic excavator) / Manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) and not exceeding 1.5 m in depth in ordinary rock including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m , all as specified and directed. | - | Cum | - | - |
| - | Grubbing up tree trunk exc 30 cm & N. exc 100 cm including cutting of trunk portion protruding over ground, digging out roots, filling holes and leveling off ground, stacking of serviceable material and removing of unserviceable material to a distance n exc. 50 m and clearing site complete all as specified and directed. | 50 | Each | - | - |
| - | Grubbing up tree trunk exc 100 cm & N. exc 150 cm including cutting of trunk portion protruding over ground, digging out roots, filling holes and levelling off ground, stacking of serviceable material and removing of unserviceable material to a distance n exc. 50 m and clearing site complete all as specified and directed. | 15 | Each | - | - |
| - | Removal of soil exceeding to a distance exceeding 250 m but not exceeding 500 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed. | - | Cum | - | - |
| - | Removal of excavated rock exceeding to a distance exceeding 250 m but not exceeding 500 m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed. | - | Cum | - | - |
| - | Rolling and consolidating formation surface in cutting with power roller exceeding 8 tonne but not exceeding 12 tonne all as directed by Engr- in- Charge. | 1,917.5 | 10 Sqm | - | - |
| - | M & L for laying and compacting 150 mm thick (compacted thickness) Granular Sub-Base Course (GSB), Grade I, conforming to Table 400-1 of MoRTH Specifications for Road and Bridge Works, 2013, in a single layer over compacted subgrade, using natural sand, crushed gravel, crushed stone, crushed slag or combination thereof, of specified grading. Material shall be mechanically mixed, spread and levelled by motor grader and compacted with 80–100 kN static weight vibratory roller to achieve minimum 98% of MDD, including consolidation to required line, level, gradient and camber, with finished surface tolerances as per Table 900-1 of MoRTH, complete as specified and directed. | 1,917.5 | 10 Sqm | - | - |
| - | M & L for laying and compacting 225 mm thick (compacted thickness) Wet Mix Macadam (WMM), laid in three layers of 75 mm each, conforming to MoRTH Specifications for Road and Bridge Works, 2013, comprising clean, crushed and graded aggregate and granular material premixed with water to a dense mass, manufactured in WMM plant, spread by sensor paver and compacted with 80–100 kN static weight vibratory roller, including consolidation to required line, level, gradient and camber. Finished surface tolerances shall be as per Table 900-1 of MoRTH Specifications for Road and Bridge Works, 2013, complete as specified and directed. | 1,917.5 | 10 Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
84700-Tender-B-Veh.pdf
Tender Documents • 4.18 MB
BOQ_887004.xls
BOQ • 0.33 MB
scan1375.pdf
Additional Documents • 0.65 MB
CEPZ-2019-TD-04 (SHT 1.1).pdf
Additional Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .