| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.8 LAccepted-AOC | ₹39.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹44.2 LRejected-AOC | ₹44.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SUNIL XAVIER L2 | RIYAS K V L1 |
|---|---|---|---|---|---|
| 1.00Appendix I | |||||
| 1.00 | 65.7:Hydraulic excavator | 10 | Day | 11,811 ₹1.2 L | 10,630.46 ₹1.1 L |
| 1.00 | OD6928/2025-2026:Filling with Quarry Waste spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete. | 55 | cum | 1,426.61 ₹78,463.55 | 1,283.95 ₹70,617.25 |
| 1.00 | OD6939/2025-2026:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 10kg to
200kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for
forming the armour and berm of rubble mount shore protection inclusive of cost of stones, hire
of lorries and machineries, labour charges required at quarry and at sorting place and the
measurements of catagorised stones after proper sorting are taken on the private weigh bridge
(weighment should be taken and recorded by departmental officers at the cost of the contractor )
having print outs using contractors supplied papers, stationeries and conveyed to the approved
alignment of the shore to the lines and levels as per approved drawings with tolerance of +/- 20
cm in final levels including all cost and labour charges, hire and operational charges of mobile
crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the
profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the
roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete
as per the direction of departmental officers at site Thrissur District | 1,875 | tonne | 1,919.03 ₹36.0 L | 1,727.12 ₹32.4 L |
| 1.00 | OD6934/2025-2026:(Based on CTE approved observed data on 2023)Putting up reclamation bund of top width
2.0m, bottom width 2.75m.and average height of 5.00m
with 1:1/4 side slope and protect the sides with coconut post of 7.00m long driving down
2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post
on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion
and screening the sides of bund with Seperation memebrane of impermeable plastic sheet
125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails
in full height including tying properly using iron wire and coir altogether and supply and
filling inside with hard clay/cut earth up to 5.00m, levell and conveyed with all leads and
lifts including consolidating properly and maintaing the bund till the work is completed and
dismantling the bund after completion of work etc. as per the directions of departmental
officers at site.
Bottom width 2.75m, Height 5.00m Side slope 1:1/4 Length of coconut pile 7.00m
Spacing 0.75m No. of leyers 2
Length of full coconut pile required for 10m = ((10/0.75)+1)x2x7.00 = 200.67m
Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m
Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m
cost of full coconut post (Details vide 60.64.1), Coconut post required for 1m
=200.67/10 = 20.06m (average length of coconut pile is 7 m and dia 25cm) Assuming
cocunut post can be used 2 times
No. of coconut pile required for 1m = 20.06/7 = 2.87 nos.
Carriage of timber = 2.87x7x3.14x0.125x0.125 = 0.985cum
Assume 3 rows wailing pieces in both sides and 3 cross ties, Total 52.60+60 -
112.50m Hence for 1.0m = 112.50/10 = 11.25m
7m long coconut tree equals 24m 1/4 split coconut piles ,
coconut post required = 11.25/24 = 0.469nos.
Carriage required = 7x3.14x0.125x0.125 = 0.343cum
Sawing area for 1m = 0.375x6x2x0.25 = 1.406sq.m
Carpenter II class required = (4.3/10)x1.125 = 0.4838nos.
Totla no.of coconut pile for 10m length @ 0.75m c/c = 10/0.75+1 = 14 nos on both
sides = 14x2 = 28 nos. for 1m length = 28/10 = 2.8 nos Pile driving down length =
2.0m total length 2.0x2.8 = 5.6m
Screening the frame with polythene sheet nailed to wailing pieces and coconut post,
Plythene sheet require =10.3x2x5.00 = 103.00sqm For 1m = 103/10 = 10.30sqm
Quantity of clay = (2.0+2.75)/2x5.00 = 11.88cum | 80 | metre | 6,147.69 ₹4.9 L | 5,532.92 ₹4.4 L |
| 2.00Morth | |||||
| 2.00 | OD6933/2025-2026:Supplying and placing 150 Gsm wowen Geotextiles like polypropylene multi filament fabric using twisted high tenacity yarn at the back side of the reclamation wall in one layer as filter including and providing necessary overlaps, all cost, conveyance, labour charges etc complete as per the instruction of departmental officers. | 785 | sqm | 169 ₹1.3 L | 152.53 ₹1.2 L |
Tender Value
₹40.2 L
EMD Value
₹50,000
Closing Date
20 Jan 2026, 6:00 pmClosed
Executive Engineer
Harbour Engineering Division Ernakulam munambam Pallipuram p o 683515
NABARD RIDF XXX Development Upgradation and Associated Infrastructure works of Chettuva Fishing Harbour Construction of Reclamation Bund Balance work II nd Phase General Civil Work
2026_HED_827235_1
HED/CEHED/673/2025-2026
Open Tender
Civil Works - Others
120 days
Chettuva fishing Harbour
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
4 Mar 2026
13 Jan 2026
22 Jan 2026
13 Jan 2026
20 Jan 2026
13 Jan 2026
Appendix I
65.7:Hydraulic excavator
OD6928/2025-2026:Filling with Quarry Waste spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete.
OD6939/2025-2026:Supplying blasted rock from approved quarry to sorting site and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the armour and berm of rubble mount shore protection inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on the private weigh bridge (weighment should be taken and recorded by departmental officers at the cost of the contractor ) having print outs using contractors supplied papers, stationeries and conveyed to the approved alignment of the shore to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site Thrissur District
OD6934/2025-2026:(Based on CTE approved observed data on 2023)Putting up reclamation bund of top width 2.0m, bottom width 2.75m.and average height of 5.00m with 1:1/4 side slope and protect the sides with coconut post of 7.00m long driving down 2.00m below bed level at 75cm c/c, providing 3 rows of weiling pieces 1/4 split coconut post on both sides and 1/4 split cross ties to alternate posts at top, bottom and middle portion and screening the sides of bund with Seperation memebrane of impermeable plastic sheet 125 micron thick fixed properly using coconut post and weiling pieces using reeper and nails in full height including tying properly using iron wire and coir altogether and supply and filling inside with hard clay/cut earth up to 5.00m, levell and conveyed with all leads and lifts including consolidating properly and maintaing the bund till the work is completed and dismantling the bund after completion of work etc. as per the directions of departmental officers at site. Bottom width 2.75m, Height 5.00m Side slope 1:1/4 Length of coconut pile 7.00m Spacing 0.75m No. of leyers 2 Length of full coconut pile required for 10m = ((10/0.75)+1)x2x7.00 = 200.67m Length of (1/4 split) coconut cross ties for 10m = 3x2.5 av. x 7 Nos. = 52.50 m Length of 1/4 split weiling pieces for 10m = 3x2x10 = 60m cost of full coconut post (Details vide 60.64.1), Coconut post required for 1m =200.67/10 = 20.06m (average length of coconut pile is 7 m and dia 25cm) Assuming cocunut post can be used 2 times No. of coconut pile required for 1m = 20.06/7 = 2.87 nos. Carriage of timber = 2.87x7x3.14x0.125x0.125 = 0.985cum Assume 3 rows wailing pieces in both sides and 3 cross ties, Total 52.60+60 - 112.50m Hence for 1.0m = 112.50/10 = 11.25m 7m long coconut tree equals 24m 1/4 split coconut piles , coconut post required = 11.25/24 = 0.469nos. Carriage required = 7x3.14x0.125x0.125 = 0.343cum Sawing area for 1m = 0.375x6x2x0.25 = 1.406sq.m Carpenter II class required = (4.3/10)x1.125 = 0.4838nos. Totla no.of coconut pile for 10m length @ 0.75m c/c = 10/0.75+1 = 14 nos on both sides = 14x2 = 28 nos. for 1m length = 28/10 = 2.8 nos Pile driving down length = 2.0m total length 2.0x2.8 = 5.6m Screening the frame with polythene sheet nailed to wailing pieces and coconut post, Plythene sheet require =10.3x2x5.00 = 103.00sqm For 1m = 103/10 = 10.30sqm Quantity of clay = (2.0+2.75)/2x5.00 = 11.88cum
Morth
OD6933/2025-2026:Supplying and placing 150 Gsm wowen Geotextiles like polypropylene multi filament fabric using twisted high tenacity yarn at the back side of the reclamation wall in one layer as filter including and providing necessary overlaps, all cost, conveyance, labour charges etc complete as per the instruction of departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1388176.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Biddocsigned.pdf
Tender Documents • 6.78 MB
BOQ_1388176.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid