Tender Value
Refer Docs
EMD Value
₹8.2 L
Closing Date
16 Sept 2026, 11:30 am
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
16 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' of whichever less ; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-C, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (Full details para 10.2 in tender documents)
Note : In case balance sheet of the previous financial- year is yet to be prepared/audited on the date of the submission of bids and tenderer wants to take fourth previous financial year to be considered for calculating average annual contractual turnover for this tender. Then tenderer should submit a certificate issued from concern Chartered Accountant to clarify that the balance sheet of the previous financial year is yet to be prepared/ audited. This certificate must be issued by Chartered Accountants, after floating date of the tender. If this certificate is not submitted along with offer then, the contractual turnover of previous three financial will be considered for evaluating standard financial criteria and 4th previous financial year will not be considered for evaluating standard financial criteria.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited : 1.2 during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. (Full details para 10.1 in tender documents)
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate
Defination of Similar Work :- Complete Track Renewal, through sleeper renewal, through rail renewal or Turnout renewal or TBTR or Deep Screening or Work involving loading and leading of P.Way materials or Distressing of LWR or Conversion of Track into LWR or Casual sleeper, rail fitting renewal or Through fitting renewal Or Through weld renewal or Raising of Track
43 conditions · 6 needing a document upload
For all contracts costing more than Rs. 5 Crore, Contractor's e-MB is mandatory and Contractor's e-MB should be part of Tender Document.
In case of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., Annexure-L shall also be submitted by the each member of a Partnershp Firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be, Non submission of a copy of certificate by the bidder shall result in summarily rejection of his/their bid. It shall be mandatorily incumbent upon the tenderer to identify, state and submit the supporting documents duly self attested/ digitally signed by which they/he are/is qualifying the Qualifying Criteria mentioned in the Tender Document.
In case of Partnership/LLP firm or In case one or more of the members of the JV is/are partnership/LLP firm(s): All Previous and Latest Partnership Deed/LLP Agreement has also been submitted along with the offer. Certificate in this regard has been submitted as per "Annexure- M" attached in tender document
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, GST, PAN Number, Adhar Number, Mobile Number and e-mail address.
Please furnish list of personnel, organization available on hand and proposed to be engaged for the subject work. [As per Annexure -D attached in tender document]
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.[As per Annexure - E attached in tender document]
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given. [As per Annexure -F attached in tender document]
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.[As per Annexure -G attached in tender document]
(A) The stamp duty payable in Bank Guarantee for Bid security and Performance guarantee differs from state/Union of Territory to State/Union of Territory as per the provisions of Stamp Duty Act applicable in that particular state/Union of Territory on the date of execution of Bank Guarantee. The Value of Non-Judicial Stamp paper for execution of the BG to be submitted shall be higher of the following two values :- (a) Stamp value as applicable in State/Union Territory from where Stamp paper is purchased. (b) Stamp value as applicable in the state of Uttar Pradesh. Stamp Duty applicable in the state of Uttar Pradesh for submission of Bank Guarantee for Bid Security and Performance Guarantee is Rs. Five per thousand or part thereof, subjected to maximum value of Rs. Ten Thousand (Rs. 10,000/-) (B) Bid offer of tenderer who submits Bank Guarantee in lieu of Bid security in violation of Para (A) above will be summarily rejected.
Address for submission of BG :- The original Bank Guarantee should be delivered in person to the Receipt and Dispatch Section to the "office of the DRM/Engineering/N.E. Railway, Varanasi (UP) - 221002" before closing date for submission of bids (i.e. excluding the last date of submission of bids).
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
"This tender complies with Public Procurement Policy Order 2017 dated 16.09.2020". The full details of the order can be seen at https://dpiit.gov.in/sites/default/files/PPP%20MII%20Order%20dated%2016%2009%202020.pdf
For all contracts costing more than Rs. 5 Crore, Contractor's e-MB is mandatory and Contractor's e-MB should be part of Tender Document.
The Railway Reserve the right to accept in whole or in part or reject any tender or all tenders without assigning any reason for such action. Rate should not be quoted for part quantity.
For those conditions for which standard formats have been given in the uploaded document titled-Formats for uploading of various format. The informations should only be submitted in these standard formats.
Rates are inclusive of all taxes/royalty charges etc. legally leviable by State, Central Govt. or any other local authority.
Goods and Services Tax (GST) will be recovered as per extant instruction on the subject.
Performance Guarantee :-(a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22nd day after the date of issue of LOA. Further, if the 60th day happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re- tender for that work.
(b)The successful bidder shall submit the Performance Guarantee (PG) amounting to 5% of the original contract value and Additional Performance Guarantee as per clause 16(4)(h) in any of the following forms: (i)A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii) Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v)Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii)Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x)National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted.
As Per New Para 16(4)(h) of Part-II of GCC,22 Advance Correction Slip No. 11, Vide Railway Board letter No. 2022/CE-1/CT/GCC-2022/Policy/Pt.I(E-3320424) Dated 13.03.2026 ( h ) If a tender is accepted on the quoted rates of bidder which is below the advertised tender 6.1.1 value, an additional performance security shall be submitted by the bidder : Bid quoted in % of advertised cost Below 0-5% (inclusive) Additional Performance Guarantee (%) is Nil and Bid quoted in % of advertised cost Below 5% then Additional Performance Guarantee (%) is 5%.
The tenderer shall upload scanned copies of mandatory credentials such as experience, Payment Certificates and any other documents as applicable.
Offer submission period :- Fifteen days prior to closing date of tender, during which tenderers can submit their offer.
(a)One qualified Graduate Engineer where the cost of the work to be executed is Rs.200 lakh and above. (b)One qualified Diploma Holder Engineer where the cost of the work to be executed is more then Rs.25 lakh, but less then Rs.200 lakh. Technical staff should be available at site whenever required by the Engineer-in-charge to take instructions. In case the contractor fails to employ the qualified Engineer, he shall be liable to pay amount of Rs.40000 and Rs.25000 for each month or part thereof for the default period for the provisions, as contained in para (a) and (b) above respectively. The decision of the Engineer-in-charge as to the period for which the required technical staff was not employed by the contractor and as to the reasonableness of the amount to be deducted on this account shall be final and binding on the contractor.
(1) Price Variation Clause (PVC) shall be applicable only in tender having advertised value above Rs. 2 Crores. The conditions will be follow with up-to-date correction slips. (2) Price Variation Clause for Annual Maintenance Contract or Zonal Contract :- The price variation Clause of General Conditions of Contract shall not apply to a works contract which is either an Annual Maintenance Contract or a Zonal Contract as per Railway Boards letter No.2013/CE/I/CT/O/10-PVC-Pt.I td.27.01.2015. (3) Price Variation Clause shall be applicable accordingly attached document.
Care in Submission of Tenders :
(a) (i)Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
(a)(ii)Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services Tax Act, 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified by Central/State Govt. & as amended from time to time and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
(a)(iii)The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the Contractor. The Contractor shall be responsible for deposition of applicable GST to the concerned authority.
(a)(iv)In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
(b)When work is tendered for by a firm or company, the tender shall be signed by the individual legally authorized to enter into commitments on their behalf.
(c)The Railway will not be bound by any power of attorney granted by the tenderer or by changes in the composition of the firm made subsequent to the execution of the contract. It may, however, recognize such power of attorney and changes after obtaining proper legal advice, the cost of which will be chargeable to the Contractor.
For all details of General Condition, Please See uploaded Tender Document.
Aunrihar - Varanasi Section: TTR-FS+TWS+WCMS-56 Set and Aunrihar - Jaunpur Section: TTR- FS+TWS+CMS-39 Set.
NER-BSB-2026-119~NER
NER-BSB-2026-119
Open
Works - General
12 Months
Varanasi, Uttar Pradesh
₹0
₹8.2 L
21 Aug 2026
21 Aug 2026
2 Sept 2026
87 items across 1 schedule · ₹4,12,40,147.35 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block. | — | — | — | — | |
| 1 | For Through Rail Renewal work | TRM | 7600.00 | 38.18 | 2,90,168 |
| Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in-Charge. Note: Rail drilling and cutting to be paid separately. | — | — | — | — | |
| 2 | For Through Rail Renewal work | TRM | 7600.00 | 39.36 | 2,99,136 |
| 3 | Removing seized ERC from SGCI inserts of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified quality as per provisions of IRPWM, as directed by Engineer in-charge. Note: 1.List of Seized ERC along with location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if SGCI insert is broken or sleeper gets cracked in the process. | ERC | 10545.00 | 44.09 | 4,64,929.05 |
| Gas cutting of rail of various sections with contractor's tools & plants, as directed by engineer in-charge : | — | — | — | — | |
| 4 | Rail section of 52Kg and above | Each | 2850.00 | 110.05 | 3,13,642.5 |
| Under Traffic Block: Dismantling of existing BG turnouts, diamond crossings and derailing switches with all types of rails and sleeper layout, removing rails, switches, crossings, sleepers & fastenings, leveling of ballast to correct profile & stacking all the released materials, sleepers, fastenings, rails, switches & crossings including segregating & stacking at specified locations in a neat and countable manner, within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed. Note: 1. This item shall be operated only when existing turnout is replaced either with new turnout in case of TTR or with plain track when existing turnout is no more required at that location. 2. Rail cutting will be paid extra under relevant item. 3. Laying of new turnout or plain track on prepared ballast bed, as required, shall be paid separately under relevant item. | — | — | — | — | |
| 5 | 1 in 12 Turnout (Under Traffic Block) | Set | 5.00 | 30,208.76 | 1,51,043.8 |
| Assembling complete BG Turnout on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches, crossings with a maximum lead of 500m, all lift & crossing of track as required and testing points with S&T staff for throw of switch etc. at station yard after levelling surface complete including lubrication of all fastenings, complete in all respect. Note: 1.Rail cutting and Drilling shall be paid separately 2. Required P.Way fittings/fastenings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 6 | 1 in 12 Turnout | Set | 12.00 | 37,225.44 | 4,46,705.28 |
| Assembling all types of Switches on staging, clear of infringements, to correct gauge and alignment as per standard drawings with all types of rail sections over PSC sleepers at specified locations, duly leading rails, special sleepers, switches with a maximum lead of 500m, all lift & crossing of track as required including cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including lubrication of fittings/fastenings, complete in all respect. Note: Required P.Way fittings shall be supplied at SSE/P.Way stores. | — | — | — | — | |
| 7 | 1 in 12 Turnouts | Set | 78.00 | 18,202.84 | 14,19,821.52 |
| Assembling on temporary staging and insertion of all types of turnouts including diamond crossings and derailing switches on prepared ballast bed during traffic block, manually or by contractor's cranes, at specified location with 52Kg / 60Kg rail section on PSC sleepers with Railways rails/sleepers available anywhere within 500m as per standard drawing, duly leading sleepers, rails, switches, crossings, fastenings etc. including rail cutting, drilling, fixing of all components, fittings etc. with housing of tongue rails as per requirement of signaling including crossing of track, filling and spreading of ballast in crib and shoulder as required, linking of turnout with existing track, attending track parameters including lifting, providing one round of packing to make track fit for 20 kmph speed including lubrication of fittings/fastenings, complete in all respect and as directed by Engineer in-charge. Note: Required P.Way fittings shall be supplied at the SSE/P.Way stores. | — | — | — | — | |
| 8 | 1 in 12 Turnouts | Set | 5.00 | 59,484.28 | 2,97,421.4 |
| Casual renewal of PSC sleepers on points and crossings, derailing switches and diamonds portion of any layout including packing under new sleepers. All the released materials shall be stacked at specified location in a countable manner within the lead of 250m & all lift, clear of infringements, crossing of track, if any complete, as directed with contractor's vehicles, consumables, stores, labour etc. complete, as directed by Engineer in-charge. Note: Approach and Exit sleepers shall be paid as normal sleepers under relevant item. | — | — | — | — | |
| 9 | Sleepers up to 2.85 m length | Each | 1794.00 | 516.98 | 9,27,462.12 |
| 10 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 3276.00 | 711.87 | 23,32,086.12 |
| 11 | Sleepers of more than 4.20 m length | Each | 2418.00 | 1,121.37 | 27,11,472.66 |
| Renewal of CMS Crossing of all rail sections with CMS crossing or with WCMS crossing complete with fastenings including replacement of worn-out rubber pads, liners and ERC, as required. All the released materials shall be stacked at specified location in a countable manner within the lead of 500m & all lift, clear of infringements, crossing of track, if any complete, as directed. with contractor's vehicles, consumables, stores, labour etc. complete, as directed by engineer in-charge. Note: Rail cutting and drilling shall be paid separately under relevant item. | — | — | — | — | |
| 12 | 1 in 12 Turnout | Set | 78.00 | 3,569.68 | 2,78,435.04 |
| Manual deep screening of Plain track/ turnouts as per procedure prescribed in IRPWM, June 2020 or latest, on PSC sleepers of any density and throwing away screened muck arising out of screening on toe of bank or on cess, if low or on spoil banks above top of cutting (including throwing and leveling, if required beyond minimum 5m from the edge of cutting which are up to 3m deep or alternatively carting it up to 50m for disposing it off beyond cutting or platforms) as per direction of Engineer in-charge, including cutting cess for effective drainage on both sides, one round of kutcha packing with screened ballast and further attending to track parameter to make track fit for 20 kmph speed complete in all respect. Note : Payment shall be made for length along main line only for turnouts. | — | — | — | — | |
| 13 | Depth of 250 mm below bottom of sleeper - For Plain Track : | TRM | 7600.00 | 438.56 | 33,33,056 |
| 14 | Depth of 250 mm below bottom of sleeper for Turnouts | TRM | 2750.00 | 701.7 | 19,29,675 |
| Deep screening of turnout under line block within stipulated time by way of removing the Points and Crossing assembly by using T-28 cranes, removing the entire stone ballast bed by excavators up to shoulders to depth of 200/250/300 mm, limiting the digging up to original formation level only, screening the ballast so removed and stacking, spreading ballast on the formation in uniform layer from stack of new/screened ballast, placing the points and crossing assembly in designed position, dumping and spreading ballast in cribs and shoulders, lifting of track as required so as to get a clean cushion of 300mm, shifting of sleepers to correct spacing including removal and re-fixing of fittings wherever necessary, aligning of sleepers as per prescribed layout, initial packing, aligning, dressing/ lowering the cess to deep screened depth up to the edge of bank with a slope of 1 in 30, boxing of ballast to profile and making fit to run the trains at a speed of non stop 20 KMPH as specified in IRPWM - June 2020 or latest complete in all respect as directed by the Engineer - in - charge. Note: 1. Rail cutting and Rail hole drilling shall be paid under relevant items. 2. Scooped ballast shall be screened and the unused quantity of screened ballast shall be stacked for use in future. | — | — | — | — | |
| 15 | For 1 in 12 points and Crossings | Set | 40.00 | 43,279 | 17,31,160 |
| 16 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 9500.00 | 22.36 | 2,12,420 |
| Unloading of ballast from Railway's Hopper Wagons, quantity distribution as per pre-defined site requirement, clearing infringements/jammed ballast, distributing the unloaded ballast uniformly over the track, profiling and boxing following all prescribed safety norms. | — | — | — | — | |
| 17 | Under Traffic Block Conditions: | cum | 20900.00 | 44.74 | 9,35,066 |
| First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm. | — | — | — | — | |
| 18 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 7695.00 | 117.18 | 9,01,700.1 |
| Through packing of points and crossings, derailing switches including gauging, fittings recoupment, ballasting as required, elimination of sag and to the required alignment after Deep Screening as per procedure prescribed in latest edition of IRPWM complete as per direction of Engineer-in-charge. Note: This work shall be operated in exceptional cases with written approval at DEN level when UNIMAT is not available and immediate packing is required to pass train over it. | — | — | — | — | |
| 19 | 1 in 12 PSC layout | Set | 95.00 | 12,686.32 | 12,05,200.4 |
| 20 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 190.00 | 1,546.42 | 2,93,819.8 |
| Anti-corrosive painting of rail outside track on rail bottom, web, foot and fishing plane with two coats of thickness of 100 microns each by bituminous black paint confirms to IS-9862 of reputed make including surface preparation, as a complete job as per procedure prescribed in latest edition of IRPWM. | — | — | — | — | |
| 21 | For 60 Kg Rails | RM | 19000.00 | 47.09 | 8,94,710 |
| Dismantling of existing Turnout by removing switches, rails, crossings, check rails, sleepers and all fixtures and stacking all released materials, removing ballast and muck by excavating up to required depth, preparation of formation bed, laying of pre assembled Turnout by Railway's T-28 machine, linking of track with all fittings, filling up of ballast duly screened, packing, adjusting, opening & housing of switch, testing operation of switch assembly and attending track parameters, so as to make track fit for 20 kmph speed including disposing off muck to indicated places up to free lead after the block working etc. complete. Note: Rate includes making necessary preparation for T-28 machine movement like preparation of approaches, transportation and laying of wooden sleepers/blocks, etc. | — | — | — | — | |
| 22 | 1 in 12 Turnout | Each | 12.00 | 52,056.61 | 6,24,679.32 |
| Dismantling of existing switch by removing switches, sleepers, fixtures and stacking all released materials, removing ballast and muck by excavating up to required depth, preparation of formation bed, laying of pre-assembled switch by Railway's T-28 machine, linking of track with all fittings, filling ballast duly screened, aligning, packing, adjusting, opening & housing of switch, testing operation of switch assembly and attending track parameters so as to make track fit for 20 kmph speed including disposing off muck to indicated places after the block working etc. complete. Note: Rate includes making necessary preparation for T-28 machine working/movement such as providing and removing rail closures, preparation of approaches, transportation and laying of wooden sleepers/blocks, etc. | — | — | — | — | |
| 23 | 1 in 12 Switch | Each | 78.00 | 21,952.35 | 17,12,283.3 |
| Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in-charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020) | — | — | — | — | |
| 24 | 60 Kg - 110/90 UTS - Outside Track | Each | 2375.00 | 205.44 | 4,87,920 |
| Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991. | — | — | — | — | |
| 25 | On Running Line | Each | 4750.00 | 64.02 | 3,04,095 |
| Loading of rails of any section and length up to 13 metres in Wagons / Truck / trailer including lead up to 50 metres and lift up to 5 metres. | — | — | — | — | |
| 26 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 1800.00 | 104.92 | 1,88,856 |
| Loading of tongue rail, stock rail, switch assembly and crossings of any section and length, SEJ, Glued joint etc. with / without P.Way fittings and fastenings, in Wagon / Truck / trailer including lead up to 250 metre and lift up to 5 metre. | — | — | — | — | |
| 27 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 2000.00 | 103.72 | 2,07,440 |
| Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road carriage is not possible with different lead with a lift up to 5 metre during block period. | — | — | — | — | |
| 28 | For lead up to 500 metre. | MT | 570.00 | 327.34 | 1,86,583.8 |
| Unloading of rails of any section and length up to 13 metre, in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/trailer including lead up to 50 metre, lift up to 5 metre and stacking in prescribed manner. | — | — | — | — | |
| 29 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 1800.00 | 77.66 | 1,39,788 |
| Loading of 52kg / 60kg PSC normal line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 30 | In Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer | MT | 4471.00 | 81.17 | 3,62,911.07 |
| Loading of 52kg / 60kg PSC line and special sleepers beyond 2.75 metre length including existing fittings and fastenings in Depot / Station / Mid-section between stations in a neat manner to departmental material train (DMT) or contractor's / Railway's Truck/trailer with crane or any other means including crossing of one track with free lead up to 250 metre and lift up to 5 metre, if required with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 31 | I n Wagon/Truck / trailer where mechanical handling is possible and traffic block is not required. | MT | 3325.00 | 103.28 | 3,43,406 |
| Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry to the nominated location under traffic in case road carriage is not possible for different leads and lift up to 5 metres. | — | — | — | — | |
| 32 | For lead up to 500 metres | MT | 2090.00 | 254.77 | 5,32,469.3 |
| Loading, leading and unloading of all types of P.Way fittings and all other miscellaneous material except Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: Lead shall be the shortest motorable road length between the points of loading and unloading. | — | — | — | — | |
| 33 | Lead up to 5 Km | MT | 40.00 | 147.28 | 5,891.2 |
| 34 | Lead beyond 5 Km and up to 10 km | MT | 40.00 | 188.44 | 7,537.6 |
| 35 | Lead beyond 10 Km and up to 20 km | MT | 40.00 | 244.97 | 9,798.8 |
| 36 | Lead beyond 20 Km and up to 30 km | MT | 40.00 | 314.47 | 12,578.8 |
| 37 | Lead beyond 30 Km and up to 50 km | MT | 40.00 | 411.83 | 16,473.2 |
| 38 | Lead beyond 50 Km and up to 100 Km | MT | 58.00 | 625.57 | 36,283.06 |
| 39 | Lead beyond 100 Km and up to 150 Km | MT | 508.00 | 943.9 | 4,79,501.2 |
| 40 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 25400.00 | 3.24 | 82,296 |
| Transportation of Rails, sleepers, switches, crossings, SEJs and Glued Joints by road vehicles for different leads. Note: 1. Lead shall be the shortest motorable road length between the points of loading and unloading. 2. Loading and unloading shall be paid extra under relevant items. | — | — | — | — | |
| 41 | Lead up to 5 Km | MT | 200.00 | 49.84 | 9,968 |
| 42 | Lead beyond 5 Km and up to 10 km | MT | 200.00 | 90.99 | 18,198 |
| 43 | Lead beyond 10 Km and up to 20 km | MT | 500.00 | 147.52 | 73,760 |
| 44 | Lead beyond 20 Km and up to 30 km | MT | 500.00 | 217.02 | 1,08,510 |
| 45 | Lead beyond 30 Km and up to 50 km | MT | 2000.00 | 314.38 | 6,28,760 |
| 46 | Lead beyond 50 Km and up to 100 Km | MT | 3000.00 | 528.13 | 15,84,390 |
| 47 | Lead beyond 100 Km and up to 150 Km | MT | 5190.00 | 846.46 | 43,93,127.4 |
| 48 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 1297500.00 | 3.24 | 42,03,900 |
| Unloading of 52kg / 60kg PSC line and special sleepers up to 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 250 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 49 | From Truck / Trailer | MT | 4471.00 | 76.06 | 3,40,064.26 |
| Unloading of 52kg / 60kg PSC special sleepers beyond 2.75 metre length in Depot / Station / Mid-section between stations in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with crane or any other means including crossing of one track and lead up to 50 metre & lift up to 5 metre with contractor's labour, tools & plants, machinery, consumables etc. Note: In case of any damage to sleeper during loading, penalty @ 50% of the all inclusive cost of sleeper shall be levied. | — | — | — | — | |
| 50 | From Truck / Trailer | MT | 3325.00 | 79.05 | 2,62,841.25 |
| Unloading of Switches / Crossings / SEJ Rails / Glued Joints of any rail section and length with or without P.Way fittings & fastenings in neat manner for Railway usage from departmental material train (DMT) or contractor's / Railway's Truck/Trailer with lead up to 250 metre & lift up to 5 metres. | — | — | — | — | |
| 51 | From Truck / Trailer | MT | 2000.00 | 105.43 | 2,10,860 |
| Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site. | — | — | — | — | |
| 52 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 950.00 | 781.72 | 7,42,634 |
| 53 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 950.00 | 836.21 | 7,94,399.5 |
| 54 | Tractor with Trolley for local transportation or other misc. works. | Hour | 950.00 | 200.69 | 1,90,655.5 |
| 55 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 950.00 | 598.06 | 5,68,157 |
| Schedule total | ₹4,12,40,147.35 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SpecialConditionofTrackWork.pdf
ATTACHMENT
RegardingeBG.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].