Tender Value
₹32.6 Cr
EMD Value
₹65.1 L
Closing Date
19 Sept 2026, 3:00 pm
Superintending Engineer and Project Director PIU-I
Office of the Superintending Engineer and Project Director Project Implementation Unit - I,P.W. (Roads) Directorate, 3No. Commissariat Road Hastings Kolkata-700022.
Pandua Polba Road, from 0.00 kmp to15.635 km, Strengthening work (5.50 m carriageway) under Hooghly Highway Division No. I, in the district of Hooghly.
2026_WBPWD_5020139_1
WBPWD/PW(R)/SEPD/PIU-I/NIT-13 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
270 days
Pandua
Please refer Tender documents.
5 documents required · 5 mandatory
₹65.1 L
Yes
Project Implementation Unit - I, P.W.(Roads) Direc
25 Aug 2026
25 Aug 2026
21 Sept 2026
26 Aug 2026
19 Sept 2026
3 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0PART-A: ROAD WORKS | |||||
| 1.01 | Construction of Embankment with Material obtained from Borrow pits Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarilyshall not be exceed 75mm.(Reference to MoRT&H's specification clause 305).
[In case earth is available from Govt. land, compensation for earth i.e. ₹43.00/m3 to be deducted from the Rate.] | 1,316.7 | Cum | 168.17 | ₹2,21,429.44 |
| 1.02 | Construction of embankment with approved material obtained from borrow pits (land owned/arranged by the Agency with Royalty) with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 & 300-1 .The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H's specification clause 305). (Cost of compensation for Earth material & its carriage from private land at 5km distance have been included in the rate)
[Note: Royalty as appicable will be deducted from Agency's bill if not produce Royalty clearance certificate from the competent authority.] | 1,316.7 | Cum | 220.72 | ₹2,90,622.02 |
| 1.03 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to theembankment location within all lifts and lead upto 1000m (Reference to MoRT&H's specification clause 301). | 865.99 | Cum | 85.55 | ₹74,085.44 |
| 1.04 | Construction of Embankment with Material Deposited from Roadway Cutting.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 & 300-1. The size course material in the mix of earth ordinarily shall not be exceed 75mm.(Reference to MoRT&H'sspecification clause 305). With earth obtained from box cutting .
[Note: In case the earth cutting is done by dozer and pushed for filling in the embankment, the input of dozer in the cost of embankment i.e. ₹ 39.63/m3 shall be deducted from the Rate.] | 3,719.14 | Cum | 105.59 | ₹3,92,703.99 |
| 1.05 | Dismantling of Flexible Pavements.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202).
By Manual Means.
Granular courses. | 1,397.06 | Cum | 587.83 | ₹8,21,233.78 |
| 1.06 | Dismantling of Flexible Pavements.
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Reference to MoRT&H's specification clause 202).
By Mechanical Means.
Bituminous course. | 5,046.98 | Cum | 312.86 | ₹15,78,998.16 |
| 1.07 | Compacting original ground supporting sub-grade.
Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 & 300-1 for sub-grade construction (Reference to MoRT&H's specification clause 305.3.4). | 633.65 | Cum | 70.52 | ₹44,685 |
| 1.08 | Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Reference to MoRT&H's specification clause 305).
With fine sand | 889.65 | Cum | 1,202.64 | ₹10,69,928.68 |
| 1.09 | Water Bound Macadam Sub Base
Water Bound Macadam Sub Base by consolidating Jhama metal of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening :
By consolidating jhama metal @1.09 m3 / m3 with moorum screening @ 0.26 m3 / m3 (loose volume).
(Payment will be made on the basis of finished compacted volume). | 1,686.89 | Cum | 2,879.4 | ₹48,57,231.07 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 21.38 MB
FORM_2911ii_for_25-50cr.pdf
Tender Documents • 0.18 MB
BOQ_5094230.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].