| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-Finance BILASPUR | ₹4.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹4.7 L+₹15,463.07 (3.41%)Rejected-Finance IND AREA ROAD TAHLIWALA TEH HAROLI DISTT UNA H P | TAHLIWALA | UNA | HIMACHAL PRADESH | ₹4.7 L+₹15,463.07 (3.41%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.8 L+₹24,299.11 (5.37%)Rejected-Finance BILASPUR | ₹4.8 L+₹24,299.11 (5.37%) | L3 | Rejected-Finance L3 |
Tender Value
₹4.4 L
EMD Value
₹4,418
Closing Date
10 Apr 2026, 9:00 amClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for providing 11kV HT Line with AB Cable and 11/0.4kv,100 kva Sub-Station alongeith CT/PT Unit/Str for SOP to MS Jai Baba filling Station at Santokhgarh Road Una Bid No- UED/03/2026-27 under ESD HPSEBL NOI Una
2026_HPSEB_133384_1
BID NO- UED/03/2026-27
Open Tender
Electrical Works
Percentage
90 days
S Jai Baba filling Station at Santokhgarh Road Una
AS PER SBD
5 documents required · 5 mandatory
₹509
₹4,418
18 Jul 2026
4 Apr 2026
10 Apr 2026
5 Apr 2026
10 Apr 2026
5 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | ERECTION PART HT LINE | - | - | - | - |
| 1.02 | Erection of S.T Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect. | 1 | Nos | - | - |
| 1.03 | Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect. | 0.15 | P/w / P/Kms | - | - |
| 1.04 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect. | 0.05 | Kms. | - | - |
| 1.05 | Stringing and sagging HT AB Cable (3C+ Messenger) Size 70 mm2 to 185 mm2:- Laying of AB Cable, Installation of Suspension and Tension assembly etc.,Sagging of AB Cable,Heat Shrinkable Cable Jointing/Termination/T0joint (1 No. Straight Through+2 No. Cable termination & 1 No T0 Jointing) complete in all respect. | 0.23 | P/Kms | - | - |
| 1.06 | Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. | 1 | Nos | - | - |
| 1.07 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. | 1 | Set | - | - |
| 1.08 | Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site | 1 | JOB | - | - |
| 1.09 | ERECTION PART 11/0.4kV,100 KVA Sub-Station | - | - | - | - |
| 1.1 | Erection of100 kva S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. | 1 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.09 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_197225.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .