| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-Finance HARDAHA BALUWA VARANASI CHANDAULE | L1 | Accepted-Finance L1 | |
| 2 | L2₹12.6 L+₹27,539.77 (2.23%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.1 L+₹76,139.36 (6.18%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹24,923
Closing Date
22 Jul 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Ward 57 from Ghani Lane in Raiganj via Daroga Masjid. In the link road connected to Ramniwas Verma and the road. Construction of RCC drain and CC road Work
2026_DOLBU_1170154_1
NNG
Open Tender
Civil Works
Percentage
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Nagar Nigam Gorakhpur
₹24,923
24 Sept 2026
17 Jul 2026
23 Jul 2026
17 Jul 2026
22 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | Dismentaling brick work or stone work in lime or cement mortor and including stacking of materials as directed be the engineer in charge wihin a distance of 60 meter (200feet) SI No 692 | 1 | Cum | 400 | ₹399.6 |
| 1.02 | Dismantilng of old damge interlocking tiles. | - | Sqm | 30 | - |
| 1.03 | Earth Work in excavation in foul posstion lead 50 mt & lift 1.5 mt incl . Lab T7P etc all complete. | 1 | Cum | 120 | ₹119.88 |
| 1.04 | P/L of base cocrete in 1:6:12 with cement L-sand and 40 mm S/B including mat. Lab | - | Cum | 4,007 | - |
| 1.05 | Rcc work with cement concrete (1:1.5:3) including all complete work. | 1 | Cum | 9,082 | ₹9,072.92 |
| 1.06 | M.S or iron work in reinforcement cutting, bending, binding and placing incl. etc all | - | Qtl | 7,690 | - |
| 1.07 | S/L two or more coat applied @ 1.67 lts/10sqm over and including base complete of work. | - | Sqm | 92 | - |
| 1.08 | S/L of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | 1 | Cum | 3,134.25 | ₹3,131.12 |
| 1.09 | Consolidation of GSB upto 10 cm thick loose layer by hand ramming including etc. all.complete. | 1 | Cum | 210 | ₹209.79 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.09 MB
d.pdf
Tender Documents • 2.08 MB
BOQ_2195620.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .