| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance | -19.55% | ₹32.5 L | L1 | Admitted-Finance |
| 2 | L2₹32.7 L+₹27,848.26 (0.86%)Admitted-Finance | -18.86% | ₹32.7 L+₹27,848.26 (0.86%) | L2 | Admitted-Finance |
| 3 | L3₹34.5 L+₹2.1 L (6.40%)Admitted-Finance | -14.40% | ₹34.5 L+₹2.1 L (6.40%) | L3 | Admitted-Finance |
Tender Value
₹40.4 L
EMD Value
₹80,720
Closing Date
27 Jul 2026, 3:00 pmClosed
EE,HCD-5,DDA
EE,HCD-5,DDA
Fencing by Barbed wire and signage for Aranya Policy 2026 plantation in DDA parks (Ashoka Garden, Baba Khimman Singh, Rattan wala bagh, Birla Mill.) under the jurisdiction of SD-V/HCD-V.
2026_DDA_917652_1
11/EE/HCD-5/DDA/2026-27
Open Tender
Civil Works
Works
30 days
LAWRENCE ROAD
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹80,720
4 Aug 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavating holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto1.5 m. | |||||
| 1.1 | All kinds of soil. | - | Each | 82.45 | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:3:6 (1 Cement : 3 manufactured sand derived from Recycled concrete Aggregate (RCA) : 6 graded stone aggregate 20 mm nominal size Recycled Aggregate (RA)). | - | Cum | 5,639.85 | - |
| 3 | Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. | - | Kg | 125.75 | - |
| 4Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. | |||||
| 4.1 | With G.I. barbed wire | - | metre | 22.1 | - |
| 5Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : | |||||
| 5.1 | Two or more coats on new work. | - | Sqm | 155.9 | - |
| 6Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_964355.xls
BOQ • 0.30 MB
NIT11.pdf
Tender Documents • 2.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .