Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | ₹3.2 L | L1 | Accepted-Finance Complied |
| 2 | L2₹3.3 L+₹9,088.88 (2.81%)Accepted-Finance | ₹3.3 L+₹9,088.88 (2.81%) | L2 | Accepted-Finance Complied |
| 3 | L3₹3.4 L+₹14,455.18 (4.46%)Accepted-Finance | ₹3.4 L+₹14,455.18 (4.46%) | L3 | Accepted-Finance Complied |
| 4 | L4₹3.9 L+₹62,800.28 (19.4%)Accepted-Finance | ₹3.9 L+₹62,800.28 (19.4%) | L4 | Accepted-Finance Complied |
| 5 | L5₹4.1 L+₹86,972.83 (26.8%)Accepted-Finance | ₹4.1 L+₹86,972.83 (26.8%) | L5 | Accepted-Finance Complied |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
17 Apr 2026, 4:00 pmClosed
Execuitve Engineer JS PHE Division Chadoora
Execuitve Engineer JS PHE Division Chadoora at Alipora Chadoora
Annual stage maintenance Repairs and Other Emergent Works of Sub Division Chadoora
2026_PHE_307572_1
Detailed E NIT No 02/JS/PHED/CHADOORA of 2026-27
Open Tender
Civil Works
Percentage
90 days
Chadoora
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
Yes
Execuitve Engineer JS PHE Division Chadoora
₹10,000
Yes
27 Apr 2026
9 Apr 2026
18 Apr 2026
9 Apr 2026
17 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan: In all kinds of soils | - | Cum | - | - |
| 2 | Ordinary rock | - | Cum | - | - |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) & for shafts, wells, cesspits and the like not exceeding 10 sqm on plan: In all kinds of soils | - | Cum | - | - |
| 4 | Ordinary rock | - | Cum | - | - |
| 5 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth: In all kinds of soil | - | Cum | - | - |
| 6 | Ordinary rock | - | Cum | - | - |
| 7 | Earth work in bulk excavation by mech means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge: In all kinds of soils | - | Cum | - | - |
| 8 | Ordinary rock | - | Cum | - | - |
| 9 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | - | Sqm | - | - |
| 10 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_997745.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .