Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC C O SHRI SUKHDEV SINGH VILL PIRAULI PO PIRAULI KISHANPUR DISTT MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | ₹3.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹3.3 L+₹5,122.35 (1.59%)Rejected-Finance SHANTI NAGAR BISHRAMPUR DISTT SURAJPUR C G | ₹3.3 L+₹5,122.35 (1.59%) | L2 | Rejected-Finance Being L2 |
| Sl No | Description | Qty | Unit | Gurucharan Singh L1 | Rakesh Bahadur Singh L2 |
|---|---|---|---|---|---|
| 1.00 | Malma / debris cleaning for the Site preparation & stacking with in 40 mtr. | 36.23 | cum | 558.78 ₹20,244.6 Lowest | 575 ₹20,832.25 |
| 2.00 | Groove cutting: In coal in sides. | 1.5 | cum | 1,375.1 ₹2,062.65 Lowest | 1,415 ₹2,122.5 |
| 3.00 | Groove cutting In stone ( Floor) | 2.97 | cum | 7,188 ₹21,348.36 Lowest | 7,397 ₹21,969.09 |
| 4.00 | PCC work (1:2:4) including centering and shuttering | 26.11 | cum | 2,330.23 ₹60,842.31 Lowest | 2,398 ₹62,611.78 |
| 5.00 | 12 mm Cement Plaster up to 5 mtr above from floor level (1:6) | 47 | sqm | 446.63 ₹20,991.61 Lowest | 453 ₹21,291 |
| 6.00 | Loading the material in to tub | 43.95 | cum | 325.38 ₹14,300.45 Lowest | 335 ₹14,723.25 |
| 7.00 | Unloading of material at destination in UG | 43.95 | cum | 216.92 ₹9,533.63 Lowest | 223 ₹9,800.85 |
| 8.00 | Lead for transportation of materials by manual labour For every addl.15Mtr Beyond 75 Mtr | 38.22 | Tub | 57.11 ₹2,182.74 Lowest | 58.75 ₹2,245.42 |
| 9.00 | Pushing tub for first 30mtr. : Nil and after every 30Mtrs. | 2,811 | Tub | 6.59 ₹18,524.49 | 6.25 ₹17,568.75 Lowest |
| 10.00 | Sand : Coarse sand (zone III) | 12.52 | cum | 1,141.18 ₹14,287.57 Lowest | 1,174.4 ₹14,703.49 |
Tender Value
₹3.2 L
EMD Value
₹4,100
Closing Date
6 Jun 2026, 5:00 pmClosed
GENERAL MANAGER Oprn.
GM OFFICE SECL BISHRAMPUR AREA.
Construction of 5 Nos. Protection Walls for protection of the running district and working in dip most area from perculated water from roof and flowing of water from old working in Seam-0 (bottom Seam), and 04 Nos Pump Foundation out of which 01 Nos
2026_SECL_360306_1
GM/BSPR/GMO/Srvy/e-tender/ 2026-27/03 dt.26.05.26
Open Tender
Civil Works - Others
Item Rate
120 days
REHAR UG MINE OF SECL BISHRAMPUR AREA
AS PER NIT AND GCC
4 documents required · 4 mandatory
₹4,100
20 Jul 2026
27 May 2026
8 Jun 2026
27 May 2026
6 Jun 2026
28 May 2026
27 May 2026 - 30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Malma / debris cleaning for the Site preparation & stacking with in 40 mtr. | 36.23 | cum | 558.78 | ₹20,244.6 |
| 2 | Groove cutting: In coal in sides. | 1.5 | cum | 1,375.1 | ₹2,062.65 |
| 3 | Groove cutting In stone ( Floor) | 2.97 | cum | 7,188 | ₹21,348.36 |
| 4 | PCC work (1:2:4) including centering and shuttering | 26.11 | cum | 2,330.23 | ₹60,842.31 |
| 5 | 12 mm Cement Plaster up to 5 mtr above from floor level (1:6) | 47 | sqm | 446.63 | ₹20,991.61 |
| 6 | Loading the material in to tub | 43.95 | cum | 325.38 | ₹14,300.45 |
| 7 | Unloading of material at destination in UG | 43.95 | cum | 216.92 | ₹9,533.63 |
| 8 | Lead for transportation of materials by manual labour For every addl.15Mtr Beyond 75 Mtr | 38.22 | Tub | 57.11 | ₹2,182.74 |
| 9 | Pushing tub for first 30mtr. : Nil and after every 30Mtrs. | 2,811 | Tub | 6.59 | ₹18,524.49 |
| 10 | Sand : Coarse sand (zone III) | 12.52 | cum | 1,141.18 | ₹14,287.57 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_373175.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .