Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.2 L+₹127 (0.03%)Rejected-Finance | ₹4.2 L+₹127 (0.03%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | G PADMA L1 | Isai Builders L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 32 | Cum | 169 ₹5,408 Lowest | 170 ₹5,440 |
| 2.00 | Preparing the Existing surface to laying the road to Proper Gradient and remove the loose soil without damage the Water Supply and other Pipe lines. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. | 18 | Cum | 133 ₹2,394 Lowest | 133 ₹2,394 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement, four fine aggregates and Eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 22 | Cum | 5,403 ₹1,18,866 Lowest | 5,403 ₹1,18,866 Lowest |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed. For Drain Wall | 70 | Sqm | 333 ₹23,310 Lowest | 334 ₹23,380 |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two fine aggregates and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 35 | Cum | 6,777 ₹2,37,195 Lowest | 6,777 ₹2,37,195 Lowest |
| 6.00 | Plastering with cement mortar (1:3) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications | 25 | Sqm | 609 ₹15,225 Lowest | 610 ₹15,250 |
| 7.00 | Towards Charges For Trowel Finishing for Top CC Pavement and Groove Cutting Charges Etc., Complete As Per Standard Specification | 175 | Sqm | 80 ₹14,000 Lowest | 80 ₹14,000 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
4 Aug 2025, 3:00 pmClosed
THE COMMISIONER
Hosur City Municipal Corporation Bagalur Road Hosur
Construction of Storm Water Drain, Providing CC Road at Ward No. 44, Old Mathigiri 2nd Cross in Hosur City Municipal Corporation
2025_MAWS_580627_5
15003/2024/E1/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
90 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
9 Apr 2026
18 Jul 2025
4 Aug 2025
18 Jul 2025
4 Aug 2025
18 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_693969.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_693969.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .