Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.0 LAccepted-AOC GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹55.0 L | L1 | Accepted-AOC below 22.37 |
| 2 | L2₹55.8 LRejected-AOC 117 N 566 KRISHNA DHAM KAKADEO KANPUR NAGAR KANPUR | KANPUR | KANPUR NAGAR | UTTAR PRADESH | ₹55.8 L | L2 | Rejected-AOC below 21.25 percent |
| 3 | L3₹59.2 LRejected-AOC | ₹59.2 L | L3 | Rejected-AOC below 16.43 percent |
| 4 | L4₹60.2 LRejected-AOC 21 SARSWATIPURAM KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹60.2 L | L4 | Rejected-AOC below 14.96 percent |
| 5 | L5₹60.4 LRejected-AOC NIVASI BALASINGHKHEDA POST KARORA DISTRICT LUCKNOW LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹60.4 L | L5 | Rejected-AOC below 14.70 percent |
| Sl No | Description | Qty | Unit | M/S KAPOOR TRADERS L3 | M/s RATHAUR CONSTRUCTION L4 | M/S J.P. INTERPRISES L5 | DHARAM DEV CHAUHAN L6 | M/S SAI DEVELOPER L2 | M/s VINAY KUMAR CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of R.C.C. V.R.B. at Km. 1.870 of Sonhar Drain | |||||||||
| 1.01 | Dry earth filling including manual compaction, dressing lead upto 30m & lift upto 1.5 m in building and Masonry works. | 3,806.31 | Cum | 85 ₹3.2 L | 80 ₹3.0 L | 75 ₹2.9 L | 80 ₹3.0 L | 63 ₹2.4 L | 100 ₹3.8 L |
| 1.02 | EC Bags filed with local earth Supply and laying of sandy earth plastic cement bags(Volume 0.035) including cost of earth, cost of empty bags, labour, stitching with surely complete, laying and placing complete at the place of restoration of embankment. | 673.12 | Nos. | 75 ₹50,484 | 30 ₹20,193.60 | 26 ₹17,501.12 | 20 ₹13,462.40 | 32 ₹21,539.84 | 300 ₹2.0 L |
| 1.03 | Earth work in Foundation of RCC Work on drain including manual compaction and dressing to profile. | 765.44 | Cum | 90 ₹68,889.60 | 90 ₹68,889.60 | 90 ₹68,889.60 | 80 ₹61,235.20 | 100 ₹76,544 | 80 ₹61,235.20 |
| 1.04 | Providing and Laying P.C.C. in M-15 (1:2:4) mix Kabrai Stone grit 10 to 20 mm and Hameer Pur Course Sand i/c cosst of all material, Framework labour, T&P etc. complete for Proper completion of work. | 40.86 | Cum | 4,200 ₹1.7 L | 7,600 ₹3.1 L | 7,510 ₹3.1 L | 6,000 ₹2.5 L | 7,385 ₹3.0 L | 6,500 ₹2.7 L |
| 1.05 | Providing and laying R.C.C. below bed level in M-25 (1:1:2) mix Kabrai Stone grit 10 to 20mm and Hameerpur Coarse sand i/c cosst of all material, framework labour, T&P etc. complete for Proper completion work. | 215.54 | Cum | 9,700 ₹20.9 L | 9,200 ₹19.8 L | 9,140 ₹19.7 L | 9,200 ₹19.8 L | 9,042 ₹19.5 L | 7,800 ₹16.8 L |
| 1.06 | Providing and Laying P.C.C. in M-20 (1:1.5:3) mix Kabrai Stone grit 10 to 20 mm and Hameer Pur Course Sand i/c cosst of all material, Framework labour, T&P etc. complete for Proper completion of work. | 139.22 | Cum | 7,600 ₹10.6 L | 8,900 ₹12.4 L | 8,985 ₹12.5 L | 7,500 ₹10.4 L | 8,407 ₹11.7 L | 7,000 ₹9.7 L |
| 1.07 | Centering and shuttering for RCC work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. for bridge slabs above 3.0M Span. | 328.72 | Sqm | 350 ₹1.2 L | 750 ₹2.5 L | 810 ₹2.7 L | 600 ₹2.0 L | 839 ₹2.8 L | 700 ₹2.3 L |
| 1.08 | Boring with 100mm dia casing pipe including lowering and extraction of assembly, loading, unloading and carriage. One boring has 10 meter water dia dewatering capacity so no. of including all cost of materials, T& P and labour and other accessories required for proper completion of work. | 5 | Nos. | 5,000 ₹25,000 | 4,500 ₹22,500 | 4,590 ₹22,950 | 40,000 ₹2 L | 4,091 ₹20,455 | 60 ₹300 |
| 1.09 | Running of 5HP Diesel pump/generator for dewatering including suction & delivery pipe, Operator & Khalashi and P.O.I. complete with all respect. | 1,260 | Hrs | 300 ₹3.8 L | 190 ₹2.4 L | 205 ₹2.6 L | 200 ₹2.5 L | 90 ₹1.1 L | 100 ₹1.3 L |
Tender Value
₹70.8 L
EMD Value
₹1.4 L
Closing Date
26 Mar 2026, 5:00 pmClosed
S.E.
Office of Superintending Engineer Drainage Circle, Yojana Nagar Lucknow
Construction of R.C.C. V.R.B. at Km. 1.870 of Sonhar Drain of District Hardoi
2026_UPIDC_1128608_1
Letter no.378/DCL/eTender/Dt.26.02.26
Open Tender
Civil Works
270 days
Hardoi
Please refer Tender documents.
3 documents required · 3 mandatory
₹720
₹1.4 L
17 Apr 2026
21 Mar 2026
27 Mar 2026
21 Mar 2026
26 Mar 2026
21 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Construction of R.C.C. V.R.B. at Km. 1.870 of Sonhar Drain | ||||||
| 1.01 | Dry earth filling including manual compaction, dressing lead upto 30m & lift upto 1.5 m in building and Masonry works. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 1.02 | EC Bags filed with local earth Supply and laying of sandy earth plastic cement bags(Volume 0.035) including cost of earth, cost of empty bags, labour, stitching with surely complete, laying and placing complete at the place of restoration of embankment. | - | Nos. | - | - | BI01010001010000000000000515BI0100001114 |
| 1.03 | Earth work in Foundation of RCC Work on drain including manual compaction and dressing to profile. | - | Cum | - | - | BI01010001010000000000000515BI0100001115 |
| 1.04 | Providing and Laying P.C.C. in M-15 (1:2:4) mix Kabrai Stone grit 10 to 20 mm and Hameer Pur Course Sand i/c cosst of all material, Framework labour, T&P etc. complete for Proper completion of work. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.05 | Providing and laying R.C.C. below bed level in M-25 (1:1:2) mix Kabrai Stone grit 10 to 20mm and Hameerpur Coarse sand i/c cosst of all material, framework labour, T&P etc. complete for Proper completion work. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.06 | Providing and Laying P.C.C. in M-20 (1:1.5:3) mix Kabrai Stone grit 10 to 20 mm and Hameer Pur Course Sand i/c cosst of all material, Framework labour, T&P etc. complete for Proper completion of work. | 1 | Cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.07 | Centering and shuttering for RCC work including rent of shuttering, material, labour and T&P required for proper completion of work for slab, and wall etc. for bridge slabs above 3.0M Span. | - | Sqm | - | - | BI01010001010000000000000515BI0100001119 |
| 1.08 | Boring with 100mm dia casing pipe including lowering and extraction of assembly, loading, unloading and carriage. One boring has 10 meter water dia dewatering capacity so no. of including all cost of materials, T& P and labour and other accessories required for proper completion of work. | - | Nos. | - | - | BI01010001010000000000000515BI0100001120 |
| 1.09 | Running of 5HP Diesel pump/generator for dewatering including suction & delivery pipe, Operator & Khalashi and P.O.I. complete with all respect. | - | Hrs | - | - | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.06 MB
technical_2104984.pdf
techsummary_2104984.pdf
finance_2104984.pdf
BOQ Comparative Chart
xlsx
finsummary_2104984.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 9.24 MB
BOQ_2104984.xls
BOQ • 0.33 MB
BIDDOC01.pdf
Tender Documents • 1.46 MB
Download all tender documents and submit your bid