| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAccepted-AOC KHAWASNIWAS NEAR POLICE QTRDEORALI GANGTOK SIKKIM | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹31.7 L+₹42,723 (1.37%)Rejected-Finance | L2 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 3 | L3₹32.3 L+₹1.0 L (3.23%)Rejected-Finance | L3 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 4 | L4₹32.7 L+₹1.4 L (4.57%)Rejected-Finance KHAWAS BUILDING BELOW PAIZOR STADIUM GANGTOK 737101 SIKKIM | GANGTOK | EAST DISTRICT | SIKKIM | 737101 | L4 | Rejected-Finance HIGHER THEN L1 BIDDER | |
| 5 | L5₹32.9 L+₹1.6 L (5.24%)Rejected-Finance | L5 | Rejected-Finance HIGHER THEN L1 BIDDER |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
12 Jan 2024, 6:00 pmClosed
CWE
HQ 136 WORKS ENGINEERS PIN - 914136 C/O 99 APO
REPAIR/ MAINT OF GENERATOR SETS, INCENATORS, HEATING PLANTS, MH EQPTS, EOT CRANE AND STP INCL AMC and CONNECTED ACCESSORIES AT NEW MIL STN UNDER GE GANGTOK
2023_MES_632835_1
CWE/136-WE/48 OF 2023-24
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Gangtok
Class E, Category b(ii)
8 documents required · 8 mandatory
₹500
GE Gangtok
₹60,000
Yes
16 Feb 2024
15 Dec 2023
13 Jan 2024
15 Dec 2023
12 Jan 2024
2 Jan 2024
15 Dec 2023 - 23 Dec 2023
Amount
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 7.5 KVA installed at 383 ASC Supply including replacement of spares complete including the following all as specified and directed :-. (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract.Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter, against Item No 01 here-in-before.
Supply only Lub oil filter,against Item No 01 here-in-before.
Supply only Air filter element,against Item No 01 here-in-before.
Supply only Carbon brush, against Item No 01 here-in-before.
Supply only v belt for dynamo against Item No 01 here-in-before.
Supply only Fan belt,against Item No 01 here-in-before.
Supply only high pressure oil pipe,against Item No 01 here-in-before.
Supply only Lub oil pipe,against Item No 01 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 20 KVA installed at STP including replacement of spares complete including the following all as specified and directed . (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 10 here-in-before.
Supply only Lub oil filter,against Item No 10 here-in-before.
Supply only Air filter element,against Item No 10 here-in-before.
Supply only Carbon brush,against Item No 10 here-in-before.
Supply only coupling flanged type,against Item No 10 here-in-before.
Supply only Fan belt,against Item No 10 here-in-before.
Supply only high pressure oil pipe,against Item No 10 here-in-before.
Supply only Lub oil pipe,against Item No 10 here-in-before.
Supply only Radiator hose pipe set,against Item No 10 here-in-before.
Supply only LLOP Sensor,against Item No 10 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 25 KVA installed at Signal Centre including replacement of spares complete including the following all as specified and directed . (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 21 here-in-before.
Supply only Lub oil filter,against Item No 21 here-in-before.
Supply only Air filter element,against Item No 21 here-in-before.
Supply only Carbon brush,against Item No 21 here-in-before.
Supply only coupling flanged type,against Item No 21 here-in-before.
Supply only Fan belt,against Item No 21 here-in-before.
Supply only high pressure oil pipe,against Item No 21 here-in-before.
Supply only Lub oil pipe,against Item No 21 here-in-before.
Supply only Radiator hose pipe set,against Item No 21 here-in-before.
Supply only LLOP Sensor,against Item No 21 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 30 KVA installed at Burdong including replacement of spares complete including the following all as specified and directed . (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 32 here-in-before.
Supply only Lub oil filter,against Item No 32 here-in-before.
Supply only Air filter element,against Item No 32 here-in-before.
Supply only Carbon brush,against Item No 32 here-in-before.
Supply only coupling flanged type,against Item No 32 here-in-before.
Supply only Fan belt,against Item No 32 here-in-before.
Supply only high pressure oil pipe,against Item No 32 here-in-before.
Supply only Lub oil pipe,against Item No 32 here-in-before.
Supply only Radiator hose pipe set,against Item No 32 here-in-before.
Supply only LLOP Sensor,against Item No 32 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 63 KVA/62.5 KVA installed at certain unit oxygen plant including replacement of spares complete including the following all as specified and directed by Engineer-in-Charge. (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 43 here-in-before.
Supply only Lub oil filter,against Item No 43 here-in-before.
Supply only Air filter element,against Item No 43 here-in-before.
Supply only Carbon brush,against Item No 43 here-in-before.
Supply only coupling flanged type,against Item No 43 here-in-before.
Supply only Fan belt,against Item No 43 here-in-before.
Supply only high pressure oil pipe,against Item No 43 here-in-before.
Supply only Lub oil pipe,against Item No 43 here-in-before.
Supply only Radiator hose pipe set,against Item No 43 here-in-before.
Supply only LLOP Sensor,against Item No 43 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 75 KVA installed at Pump House Burdong including replacement of spares complete including the following all as specified and directed by Engineer-in-Charge. (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 54 here-in-before.
Supply only Lub oil filter,against Item No 54 here-in-before.
Supply only Air filter element,against Item No 54 here-in-before.
Supply only Carbon brush,against Item No 54 here-in-before.
Supply only coupling flanged type,against Item No 54 here-in-before.
Supply only Fan belt,against Item No 54 here-in-before.
Supply only high pressure oil pipe,against Item No 54 here-in-before.
Supply only Lub oil pipe,against Item No 54 here-in-before.
Supply only Radiator hose pipe set,against Item No 54 here-in-before.
Supply only LLOP Sensor,against Item No 54 here-in-before.
M&L for Periodic maintenance & servicing of existing make and model DG set including tappet cover adjustment & gasket replacement of capacity 320 KVA installed at 178 MH, 17 MDSR & JADC including replacement of spares complete including the following all as specified and directed . (a) Change of Engine Oil including cleaning of engine oil chamber properly (Engine oil will be measured and paid seperately) (b) Replacement of LO filter, Fuel filter, By pass filter, O ring, Gasket sets, screws etc. (c) Lubricate ball joints of the throttle linkage of Hyd Governor and change of fuel tank breather. (d) Change of Air cleaner evacuator valve and Check Fan hub / Idler and water pump. (e) Change of Cranckcase breather. Check Air piping and vibration damper. (f) Clean Fuel tank from inside. Draining out water from radiator assembly, clean properly and refill new after mixing with complete coolant in radiator including tightening all inlet and outlet connections. (g) Inspection of alternator and starter etc and replacement of parts as required (Parts will be measured seperately). (h) Applying grease, CRC in moving parts and and replacing minor items such as hose clamp, screws, washers etc Note: (i) If any fault/defects will be found during period of conract. Contractor will be rectified and inluded in quoted rate. (ii) Spares will be measured & paid separately under respective items here in after but fixing of the same is deemed to be included in quoted Rates.
Supply only Diesel fitter,against Item No 65 here-in-before.
Supply only Lub oil filter,against Item No 65 here-in-before.
Supply only Air filter element,against Item No 65 here-in-before.
Supply only Carbon brush,against Item No 65 here-in-before.
Supply only coolant switch against Item No 65 here-in-before.
Supply only Fan belt,against Item No 65 here-in-before.
Supply only high pressure oil pipe,against Item No 65 here-in-before.
Supply only Lub oil pipe,against Item No 65 here-in-before.
Supply only Radiator hose pipe set,against Item No 65 here-in-before.
Supply only LLOP Sensor,against Item No 65 here-in-before.
M&L for dismantling of radiator of DG set of any make and capacity 7.5 to 30 KVA and transporting to work shop for servicing/cleaning after dismantling twin tanks, replacement of gasket packing, nuts, bolts, washers, descaling with appropriate chemical and welding of copper brazing of damaged fins/ tubes and reassembling & fixing in same position after testing complete all as specified and as directed .
All as per Sl item No. 76.00 here-in-above but for capacity of DG set 63 to 75 KVA
All as per Sl item No. 76.00 here-in-above but for capacity of DG Set 320 KVA
M&L water coolant for topping up of water coolant in radiator of DG sets installed at various locations complete all as specified and as directed. Make :TVS Girling/volvo line or of equivalent approved
Supply only Engine Oil of 15/40 multigrade for 7.5 to 320 KVA DG set. ( Make : HP / BP / Indian Oil)
Supply and filling of distilled water high quality in DG set radiators complete all as specified and as directed.
Supply, fixing, connected and testing in replacement automatic transfer switch (ATS) four pole, automatic/manual operation type with complete protection, 630 AMPs four pole 50 Hz, 415V controller input time display and complete with enclosure Make : HAVELLS Cat No - IHYFCDE630 or equivalent make all as approved & directed by GE
M & L for Automatic voltage regulator suitable for existing DG set complete all as directed for rating of DG Sets. 7.5 KVA.
Ditto as Item No 83 here-in-before but rating of DG Set 20 KVA to 30 KVA
Ditto as Item No 83 here-in-before but rating of DG Set 63 KVA to 75 KVA
Ditto as Item No 83 here-in-before but rating of DG Set 320 KVA
Supply and fixing controller actuatar 320 DG Set.
M & L for overhauling Turbo Charger assembly for 320 KVA Graeves Make DG Set including replacement of defective turbo kit and other defective parts, hydarulic pressure and testing including grinding , polishing & remettaling at work shop and cleaning of deposited material, applying of CRC and lubricants, and reassemble engine turbo assembly, testing etc complete all as specified and as directed.
Ditto as Item No 88 here-in-before but rating of DG Set 20 KVA to 30 KVA
Ditto as Item No 88 here-in-before but rating of DG Set 62.5 KVA to 75 KVA
Ditto as Item No 88 here-in-before but rating of DG Set 7.5 KVA
M & L for overhauling Injector assembly for 320 KVA Graeves Make DG Set including replacement of defective injector sleeves, cups, fuel liner and other defective parts including replacing all o rings , hydarulic pressure and testing including grinding , polishing & remettaling at work shop and cleaning of deposited material, applying of CRC and lubricants, and reassemble engine injector assembly, testing etc complete all as specified and as directed.
Ditto as Item No 92 here-in-before but rating of DG Set 20 KVA to 30 KVA
Ditto as Item No 92 here-in-before but rating of DG Set 62.5 KVA to 75 KVA
Ditto as Item No 92 here-in-before but rating of DG Set 7.5 KVA
M & L for overhauling Fuel pump assembly for 320 KVA Graeves Make DG Set including replacement of defective fuel pump kit, gear. bearing, washers, O rings, and other defective parts including hydarulic pressure and testing and cleaning of deposited material, applying of CRC and lubricants, and reassemble engine injector assembly, testing etc complete all as specified and as directed.
Ditto as Item No 96 here-in-before but rating of DG Set 20 KVA to 30 KVA
Ditto as Item No 96 here-in-before but rating of DG Set 62.5 KVA to 75 KVA
Ditto as Item No 96 here-in-before but rating of DG Set 7.5 KVA
Supply and fix in repairs battery 180 AH, 12V complete as directed .
Supply and fix in replacement battery 12V 130AH for DG set all complete as specified and directed.
Supply and fix in repairs battery 90 AH, 12V complete as directed .
S&F in repairs Power contactor AC operational current upto 415v and 9A .
S&F in repairs temperature controller .
S&F in repairs 3 Pole power contactor AC operational current upto 415v .
S&F in repairs 3 Pole power contactor AC operational current upto 415v .
S&F in repairs MN suitable for MNX Contactor 24-30A, 415V .
S&F in repairs single phase preventor .
S&F in repairs electronic timer .
S&F in VAF + PF Meters,
S&F in Voltage monitoring relay 3 phase, 3 wire,
S&F in Temperature controlling relay 110-240V AC phase,
Supply and fix in replacement of 12 V battery charger all complete as specified and directed.
Supply and fix in replacement of 24 V battery charger all complete as specified and directed.
Periodical maintenance of following items of Mechanical laundry at 178 MH complete in all respect complete all as specified and as directed. Items Covered for preventive and breakdown maintenance are : (i) Industrial Washer extractor Model FWX 30 of 02 Nos (ii) Automatic machine fully automatic Cacity 15 Kg (iii) Industrial Drying Tumbler model DTE35 of 01 Nos (iv) Flat work Ironer Calendering machine Model F15-10 of 01 No (v) Flat bed press model SFESE of 01 No (vi) Vaccume Finishing Table Model FES786 of 01 Nos (vii)Stem Gen set capacity- 10 Kg/Hour of 01 Nos Note :- (i) Quoted rate is Exclusive of the cost of the spares used and spares will be measured separately (ii) Quoetd rate is inclusive of T&P and service Engineer. (iii) If any fault/defects will be found during period of conract. Contractor will be rectified and also inluded in quoted rate.
Supply only V belt of Cat No :AX60LP039 B-124 for Industrial washer extrator model FWX 30 Make : Stefab
Supply only 3 way Water Solenoid Valve for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Door gasket for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Hose pipe for drain-Straight for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only bearing for electric motor for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Limit Switch for drain-Straight for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Hose Clamp for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only water inlet pipe for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Fuse link 4A for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only Fuse base set for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only rectifier unit for Industrial washer extrator model FWX 30 complete all as specified and as directed.
Supply only V belt for Flat work Drying Ironer Model FS 53-300 complete all as specified and as directed.
Supply only HRC fuse Base for Flat work Drying Ironer Model F15-10 complete all as specified and as directed.
Supply only HRC Fuse Link 4A for Flat work Drying Ironer Model F15-10 complete all as specified and as directed.
Supply only contactor for Flat work Drying Ironer Model F15-10 complete all as specified and as directed.
Supply only Thermocouple j type 3Mt Length for Flat work Drying Ironer Model F15-10complete all as specified and as directed.
Supply only Conveyar belts for Flat work Drying Ironer Model F15-10 complete all as specified and as directed.
Supply only Digital timer for Flat bed press model SFESE complete all as specified and as directed.
Supply only Teflon Sheet For Head for Flat bed press model SFESE complete all as specified and as directed.
Supply only Kit for Pneumatic Cylinder For Head for Flat bed press model SFESE complete all as specified and as directed.
Supply only Heater for Iron For Vaccume Fiish Table Model FES786 complete all as specified and as directed.
S & F in repair water solenoid valve 1.5" for FWX 30 part no. AX60FR026 complete all as specified and as directed.
Supply and fix in replacement of Display control unit microprocessor based computer control functioning unit, LCD with touch functionality, 415 main voltage, 3 phase, AC supply, calliberating and programming to operate the washing machine/industrial dry Clean Machine/Industrial Washer extractor/ Industrial Drying Tumbler and providing smooth operation to the system, along with all necessary wiring etc all complete as specified and directed.
Supply and fix in repair of double function type bearing for washer extractor or drying tumbler of capacity of 60 KG including all fitting and fixture washer nut, bolts complete all as specified and as directed.
Supply and fix in repair of Vibrator bush as per existing sample complete all as specified and as directed.
M & L for cleaning of Air compressor Machine air line and air storage tank as per existing sample complete all as specified and as directed.
Supply and fix in repair of Automatic pressure release valve as per existing sample complete all as specified and as directed.
Supply and fix in repair of Air filter for compressor as per existing sample complete all as specified and as directed.
Supply and replacement of Air compressor Belt as per existing sample complete all as specified and as directed.
Supply only NC / 2 Emergency Stop for water extractor and drying tumbler complete all as specified and as directed.
S&F in replacement of heater 9 KW existing water extractor and drying tumbler as directed.
M& L for servcing of pump sets 7.5 HP capacity the pump sets by repalcing the worn out bushes, gland rope, gland bolts & nuts, etc including testing and commissioning complete all as specified and directed .
Material and labour for periodical maint of oil fired incinerator with rotary scrubbing system burning capacity 55 to 65 KG/Hr comprising of primary and secondary chamber which includes the following works :- (a) Descalling of Gap between greades (b) Descalling of combution chamber (c) Descalling of arch chamber (d) Descalling of stack arrester. (e) Overhauling burner nozzel blast tube pump, diffuser etc. (f) Cleaning of Diesel tank and fuel lines. Note :- (i) Rate includes for painting on Diesel Tank and writing in White Paint Date of cleaning and capacity. (ii) Contractor shall be liable to provice OEM technician a and when required for trouble shooting of incinerator during the currency of defect liability period.
M&L for strip opening of primary chamber and removal of the ashes or any dust materials from inside with restoring of all calicum silicate insulation and welding of steel plates and its bracing and stiffening, complete repair to the refractory lining of the chamber and providing of ceramic wool for flanges and expansion joints, settings of dismantled insulation bricks and providing heat resistant aluminium painting complete all as specified and as directed.
M&L for strip opening of the secondry chamber and removal of the ashes or any dust materials from inside with restoring of all calicum silicate insulation and welding of steel plates and its bracing and stiffening, complete repair to the refractory lining of the chamber and providing of ceramic wool for flanges and expansion joints, settings of dismantled insulation bricks and providing heat resistant aluminium painting complete all as specified and as directed.
Material and labour for complete servicing of fire burner pump No complete all as specified and as directed.
Supply and fix in replacement of burner of 30 A for complete of fire burner pump complete all as specified and as directed. Make- Bentone cat part No. B 30A
Material and labour for De-silting & cleaning of sewage treatment plant sump complete with taking out water mixed with bleaching powder, sludge & solid sludge etc removing and depositing out of cantt area in a covered container and servicing STP plant for proper functioning of STP all as specfieid and as directed. Note :- The cleaning of the following pit, chamber, sump and drain :- (a) Coarse bar screen pit - 01 No (b) Receiving sump - 01 No (c) Stiling chamber - 02 Nos. (d) Fine bar screen pit - 02 Nos (e) Main out going drain of length 50 Mtr. Note-(i) New filter media as will be measured and paid separately under relevant itemsof BOQ (ii) Contractor shall be liable to provice OEM technician and when required for trouble shooting of STP during the currency of defect liability period.
Supply only aggregate filter media for STP sludge drying bed(as per existing) complete of size 1/8 to 1/16,1/16 to 1/32 inch size compete in layers as per existing sample complete all as specified and directed by engr-in-charge.
Suppying only alam cleaning of treated water complete all as specified and as directed.
M& L for taking out existing type pumpset/airblower/Induction motor of following capacity for servcing by disconnecting motor,blower,,pipe line and removing of all aprts like bearing,bushes,imleller,shaft etc cleaning all surface and scales/sluged/dirt/formed inside/outside pumpset/blower etc lubricating/greasing at proper places and refixing in position with all serviceable parts with motor incl painting with one coat of anti corrosive paint over red oxide primer and testing and commissioning all as directed by Engr-in-Charge.(Note spares like bearing,winding will be measured paid seperately)
Suppy only ball bearing for following capacity of pumpset/airblower/motor
M& L for taking out existing type air compressor of 40 M3/HR capacity for servcing by disconnecting motor,blower,,pipe line and removing of all aprts like bearing,bushes,imleller,shaft etc cleaning all surface and scales/sluged/dirt/formed inside/outside pumpset/blower etc lubricating/greasing at proper places and refixing in position with all serviceable parts with motor incl painting with one coat of anti corrosive paint over red oxide primer and testing and commissioning all as directed by Engr-in-Charge.
S&F in Temperature controlling relay 110-240V AC phase,
Repairs to EOT by removing u/s gear box oil and filling new oil, greasing the moving parts, chain etc. Removing u/s chain pulley auto moving switch button box and copper cable from ground to EOT and fixing seviceable cable and switch box, repairs to EOT panel by replacing contactors and limit switches complete including painting with two coats of existing colour for complete EOT and all as specified. Note- (i) Contractor shall be liable to provice OEM technician and when required for trouble shooting of EOT crane during the currency of defect liability period.
Supply and fix acrylic 3D glow sign board including writing with suitable lightings, arrangement, MS frame works, each board exceeding 40 Sqft and n.exc 70 Sqft, complete all as specified and as directed.
Water testing of samples of STP (New Cantt) for (A) Physical, Chemical & Bacteriological Charecteristics of water (B) General parameters concerning physical - 11 parameters (i) pH Value Total dissolved solids (TDS) (iii) Total suspended solids (TSS) (iv) Ammonical Nitrogen as NH3 (v) Dissolved Oxygen (DO) (vi) Biochemical Oxygen Demand (BOD) (3 days at 27 deg Celcius) (vii) Chemical Oxygen Demand (COD) (viii) Oil & Grease (ix) Total Kjeldahl Nitrogen (x) Faecal Coliforms (xi) Fluoride. ( 1 sample per quarter)
M&L complete servicing conditioning, testing, rectification of medical gase pipeline, Medical air and other gases pipeline distribution system from the source of supply to the terminal unit to make the system functional in MH, overall length approx 300 RM. This job shall include area valve srvice units (AVSUs) for iolation of the system for servicing or repair, line valves assemblies (LVA) (complete with NISTs) Presure Monitoring and alarm systems. 170.01 Testing and servicies/maintenances as required of (i) The mainfold system (ii) AUTOMATIC CONTROL PANEL (iii) MASTER ALARM PANEL (iv) AREA VALVE SERVICES UNITS (v) AREA ALARM SYSTEM (vi) Terminal units (vii) Area Valve service unit modules (AVSU) (viii) BED HEAD PANELS (ix) VACUUM SYSTEM (x) WARD/THEATRE VACUUM TERMINAL UNIT (xi) Medical grade Air compressors 170.02 Testing and servicidng/maintenance as required of the followings systems:- (i) Oxygen Gas cylinder manifold via piping sytems. (ii) Pressure swing adsorption (PSA) technology via piping system. (iii) Continuity of supply to the Terminal units. (iv) Piping system vix, Supply pipelines, feeder pipeline, distribution pipeline, Drop pipe etc. checking of all tubing, valves and fittings throughly for any grease, oil or other combustible material and utilizing silver brazing Flux-less silver brazing alloy to be used, silver copper-phosphorus brazing alloy CP 104 conforming to BS EN 1044:1999 and making complete pipeline serviceable.
170.03. Checking servicing/maintenance for MGPS pipeline having adequate support at sufficient intervals incl where pipes pass through walls, partitions or floors be fitted with sleeves of copper pipes. 170.04. Checking the serviceablity and maintaing in the vacuum system as required:- (i) A vacuum of 300 mm Hg (40 kPa) at eachterminal unit design flow of 40 LPM & 15 LPM at 300mm Hg in OP and ward respectively. (ii) PLC based controller with sequencing or cascading effect. (iii) Duplex filtration & Isolation system, connected to the discharge (exhaust) system with a silencer/muffler. (iv) Exhaust discharge. (v) Alarm to indicate vacuum pump failure, integrate master alarm system etc. 170.05. Checking of reciprocating air compressors supply and replacemnt of existing gauge water. 170.06. Finalpressure testing after locating and rectification of leaks and cross-connection testing. 170.07. Supply andreplacemnt of Non return valve with body and internal parts made of copper-aluminium dedicated to oxygen generation plant suystem, oxygen gas supply system designed for combustive gases with leakage class IV-1 and handling pressure upto 40 bar. Note: (ii) Contractor shall be liable to provice technician and when required for trouble shooting of medical gas pipe line during the currency of defect liability period. (ii) Spares shall be measured and paid separately at supply only rates.
Suppy only Vacuum Charge 1 bar in system.
Supply only 4" Vaccum gauge for Vaccum pipe line complete all as specified and directed.
Supply only NRV Mainifold for oxygen pipeline complete all as specified and directed.
Supply only Probe for outlet complete all as specified and directed.
Supply only Dry filters for oxygen complete all as specified and directed.
Supply only 20 cfm dryers complete all as specified and directed.
Supply only 22 mm Ball Valves complete all as specified and directed.
Supply only 15 mm Ball Valves complete all as specified and directed.
Supply only 4 gas Digital Alarm system complete all as specified and directed.
Supply only 3 gas Digital Alarm system complete all as specified and directed.
Supply only 5 gas Digital Alarm system complete all as specified and directed.
Supply only 2 gas Digital Alarm system complete all as specified and directed.
Note 1:- (Applicable for all parts/items) : The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and general condition of contracts before entry/quoting the rates. Note 2:- Attention to bidder is hereby invited to upload revised BOQ if published during their bid submission. Uploading of incorrect/ pre-revised BOQ shall be treated as non bonafide and rejected. Note 3:-Products "Make" of BOQ items are given in Particular Specification of Tender Documents.Bidders are advised to keep in mind of all products make as per Particular Specification of Tender Documents before quoting the rates .
BIJAY MITTAL
SANJAY KAUSHIK
MAHENDRA KHAWAS
GEETA CONSTRUCTION
KAMLESH ENTERPRISE
DHARMINDER SINGH
RAAJ BANGAR
KARMA TSETEN BHUTIA
M/S MANOJ VERMA
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .