Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-Finance | L1 | Accepted-Finance - | |
| 2 | Rejected-Technical | - | Rejected-Technical - |
| Sl No | Description | Qty | Unit | MOHANKUMAR . C L1 | G RAJENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete clearing away and carefully stacking materials useful for re-use for any thickness of walls including cost and conveyance of all materials to site etc. complete. complying with std. specifications. | 53 | m3 | 483 ₹25,599 Lowest | 495 ₹26,235 |
| 2.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 89 | m3 | 184 ₹16,376 Lowest | 195 ₹17,355 |
| 3.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 32 | m3 | 5,471 ₹1,75,072 Lowest | 5,499 ₹1,75,968 |
| 4.00 | Supplying and erecting shuttering including Necessary supports for plain surfaces such asR.C.C. Columns for footings, plimn beam, Stair case, RCC. Critical pier etc., complete In all floor. | 525 | m2 | 459.5 ₹2,41,237.5 Lowest | 470 ₹2,46,750 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, Two part sand and Four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications. | 88 | m3 | 6,920 ₹6,08,960 Lowest | 6,935 ₹6,10,280 |
| 6.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 105 | m2 | 167 ₹17,535 Lowest | 175 ₹18,375 |
Tender Value
₹13 L
EMD Value
₹26,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive Officer
62 Main road P.Mettupalayam
Construction of Storm Water Drain at Ward No.12 Vinobha street in P.Mettupalayam Town panchayat
2025_DTP_590149_1
112/2025
Open Tender
Civil Works
Works
105 days
P.Mettupalayam Town panchayat
as per tender
2 documents required · 2 mandatory
₹0
₹26,000
Yes
13 Aug 2025
7 Aug 2025
12 Aug 2025
7 Aug 2025
12 Aug 2025
7 Aug 2025
7 Aug 2025 - 12 Aug 2025
Amount
Dismantling Plain Cement Concrete clearing away and carefully stacking materials useful for re-use for any thickness of walls including cost and conveyance of all materials to site etc. complete. complying with std. specifications.
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying and erecting shuttering including Necessary supports for plain surfaces such asR.C.C. Columns for footings, plimn beam, Stair case, RCC. Critical pier etc., complete In all floor.
Plain Cement Concrete 1:2:4 Mix (one part cement, Two part sand and Four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications.
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
G RAJENDRAN (BID ID -1423626)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_704932.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .