Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | -37.86% | ₹1.3 L | L1 | Admitted-Finance |
| 2 | L2₹1.4 LAdmitted-Finance | -36.00% | ₹1.4 L | L2 | Admitted-Finance |
| 3 | L3₹1.7 LAdmitted-Finance | -22.26% | ₹1.7 L | L3 | Admitted-Finance |
| 4 | L4₹1.7 LAdmitted-Finance | -20.00% | ₹1.7 L | L4 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,320
Closing Date
2 May 2026, 6:00 pmClosed
xen rew jammu
xen rew jammu
Construction of culvert near the land of Rampal Sharma and others at Mukhra Pyt Mandal Block Mandal Phallian AC Marh
2026_RDPR_308060_1
e-NIT No. 05 REWJ of 2026-27 dated 17-04-2026
Open Tender
Civil Works
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
govt treasury jammu
₹4,320
11 May 2026
17 Apr 2026
4 May 2026
18 Apr 2026
2 May 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavaton by manual means in trenches for foundatons, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for sha s, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including ge ng out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | - | sqm | 256.85 | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and laying in posi on cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | - | cum | 4,826.5 | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying in positon cement concrete of specified grade including curing but excluding the cost of centring and shu ering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | cum | 5,733.6 | - | BI01010001010000000000000515BI0100001115 |
| 4 | Boulder @30% | - | cum | 937.9 | - | BI01010001010000000000000515BI0100001116 |
| 5 | Reinforced cement concrete in beams ,suspended floors.roofs having slopes upto 15 degree landings,balconies,shelves,chajjas,lintels,bands, plain windows sills,stair cases and spiral stair cases upto 5 level including curing but excluding the cost of centering,shuttering and reinforcement with 1:1.5:3 (1 Cement:1.5 Coarse : sand:3 Graded stone aggregate 20mm nominal size) | - | cum | 9,821.85 | - | BI01010001010000000000000515BI0100001117 |
| 6 | Centering and shu ering including stru ng, propping etc. and removal of form for. Foundation. | - | sqm | 286.35 | - | BI01010001010000000000000515BI0100001118 |
| 7 | Centering and shu ering including stru ng, propping etc. and removal of form slab | - | sqm | 718.2 | - | BI01010001010000000000000515BI0100001119 |
| 8 | Steel Reinforcement for RCC Work including straightening,cu ng,bending, placing in positon and binding all complete above plinth level . Cold twisted bars fe500 | - | kg | 123.2 | - | BI01010001010000000000000515BI0100001120 |
| 9 | Carriage of Sand 3km | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Carriage of Aggregate 3km | - | cum | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_998779.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid