Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.9 LAccepted-AOC 101 1 KASI PADAYACHI STREET AYYAGOUNDER ROAD VALAPADY TK SALEM DT | TIRUCHIRAPPALLI | TAMIL NADU | 621011 | L1 | Accepted-AOC Lowest rate quoted | |
| 2 | L2₹73.2 L+₹15,462.01 (0.21%)Rejected-AOC 1A 20 EAST SEERANAGAPALAYAM ROAD SALEM 63607 | 63607 | L2 | Rejected-AOC Highest rate quoted |
| Sl No | Description | Qty | Unit | VRV CONSTRUCTION L2 | JJS Constructions L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing the Heavy Jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all charges for cutting for formation of road.
Km 1/6-2/0 | 1,600 | Square meter | 10 ₹16,000 | 9 ₹14,400 Lowest |
| 2.00 | Clearing the Light Jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all charges for cutting for formation of road.
Km 1/6-2/0 | 1,600 | Square meter | 7 ₹11,200 | 6 ₹9,600 Lowest |
| 3.00 | Advance patch work for making up the undulation in the existing BT surface upto 50 mm thickness using 45 mm IRC size HBG crusher metal premixed with 44kgs. of 80/100 bulk bitumen per cum of metal includung cost and conveyance of all materials to site stacking them to standard departmental metric guage for pre-measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the contractor himself at his own cost including handling charges for the same at both ends, heating the bitumen, premixing, laying, tamping including all labour charges for patch work and hire charges and fuel charges for all tools and plants employed and all the other incidental charges etc., complete
Km 0/0-1/6 | 43.56 | Cubic meter | 3,500 ₹1,52,460 | 3,485 ₹1,51,806.6 Lowest |
| 4.00 | Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces
Km 0/0-1/6 | 6,500 | Square meter | 28 ₹1,82,000 | 27.5 ₹1,78,750 Lowest |
| 5.00 | Bituminous Macadam :Providing and laying bituminous macadam of 50mm Thickness with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 111,112,501, 504 & 900 of MORTH Vth Revision-Grading II (Table 500-7)
Km 0/0-2/0 | 400 | Cubic meter | 8,300 ₹33,20,000 | 8,294 ₹33,17,600 Lowest |
| 6.00 | Bituminous Concrete (Table 500-17) : Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II
Km 0/0-2/0 | 240 | Cubic meter | 10,500 ₹25,20,000 | 10,485 ₹25,16,400 Lowest |
| 7.00 | GST 18% | 1 | Number | 11,16,298.8 ₹11,16,298.8 | 11,13,940.19 ₹11,13,940.19 Lowest |
Tender Value
₹73.1 L
EMD Value
₹46,530
Closing Date
14 May 2025, 3:00 pmClosed
Executive Officer
Arulmigu Kumaragiri Dhandayuthapani Swamy Thirukkoil, Sanyasigundu, in Salem Town, Salem Taluk, Salem District 636015
Special Repairs for the Existing B.T Road Surrounding the Temple Campus for Arulmigu Kumaragiri Dhandayuthapani Swamy Thirukkoil, Sanyasigundu, in Salem Town, Salem Taluk, Salem District
2025_HRCE_553137_1
02/2025/29.04.2025
Open Tender
Civil Works
Lump-sum
365 days
A/m Kumaragiri DhandayuthapaniSwamy Temple
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹46,530
O/o Joint Commissioner
9 Oct 2025
30 Apr 2025
16 May 2025
30 Apr 2025
14 May 2025
30 Apr 2025
30 Apr 2025 - 14 May 2025
5 May 2025
Amount
Clearing the Heavy Jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all charges for cutting for formation of road. Km 1/6-2/0
Clearing the Light Jungle by uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all charges for cutting for formation of road. Km 1/6-2/0
Advance patch work for making up the undulation in the existing BT surface upto 50 mm thickness using 45 mm IRC size HBG crusher metal premixed with 44kgs. of 80/100 bulk bitumen per cum of metal includung cost and conveyance of all materials to site stacking them to standard departmental metric guage for pre-measurement as directed by the departmental officer and including cost and conveyance of bitumen which will be supplied and procured by the contractor himself at his own cost including handling charges for the same at both ends, heating the bitumen, premixing, laying, tamping including all labour charges for patch work and hire charges and fuel charges for all tools and plants employed and all the other incidental charges etc., complete Km 0/0-1/6
Tack coat - Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 111, 112, 501, 503 & 900 of MORTH Vth Revision - over bituminous surfaces Km 0/0-1/6
Bituminous Macadam :Providing and laying bituminous macadam of 50mm Thickness with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 111,112,501, 504 & 900 of MORTH Vth Revision-Grading II (Table 500-7) Km 0/0-2/0
Bituminous Concrete (Table 500-17) : Providing and laying bituminous concrete of required thickness with central hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by JMF of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 111,112,501,507 & 900 of MORTH vth Revision complete in all respects - Grading II Km 0/0-2/0
VRV CONSTRUCTION (BID ID -1335798)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_660251.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .