Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 L+₹3,984.04 (1.81%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹4,050.44 (1.84%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,427
Closing Date
14 May 2026, 2:00 pmClosed
EE
S/O
Laying of 300 mm dia Sewer Line 35 Mtr with Construction of 4 M.H. from Varsi Hair Dressure to Mister Nivas in Ward 102, Kanpur.
2026_DOLBU_1146163_13
JalKal / 284 / EE Zone 3 /
Open Tender
Miscellaneous Works
Percentage
10 days
Jal Kal Vibhag Kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Jal Kal Vibhag
₹4,427
18 Jun 2026
8 May 2026
14 May 2026
8 May 2026
14 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Bituminous Road(As Unit
Rate in 2025-26). (A) For Sewer Line 300 mm dia (B) For M.H. | 43.64 | SQM | 404.1 | ₹17,634.92 |
| 2 | Excavation of Foundation in Ordinary soil
With Supply of labT&P etc all comp. (As
Unit Rate in 2025-26). (A) For Sewer Line 300 mm up to 1.5 Mtr (B) For M.H (C) For Sewer Line 300 mm 1.5 to 3.0 Mtr (D) For M.H | 99.49 | SQM | 291.89 | ₹29,040.14 |
| 3 | Excavation of Foundation in Ordinary soil
With Supply of labT&P etc all comp. (As
Unit Rate in 2025-26). (A) For Sewer Line 300 mm up to 1.5 Mtr (B) For M.H (C) For Sewer Line 300 mm 1.5 to 3.0 Mtr (D) For M.H | 4.66 | SQM | 4,747.35 | ₹22,122.65 |
| 4 | Making Necessary Arrangement of Barricating With Sal ballies, Red Flag, Lab, T&P etc all Comp. | 50 | Mtrs | 200 | ₹10,000 |
| 5 | 1st Class Brick Work with 1:3 Cement & Coarse Sand mortar & including Supply of lab, Mat, T&P etc all Comp. | 8.88 | Mtrs | 7,200 | ₹63,936 |
| 6 | 1st Class Brick Work with 1:3 Cement & Coarse
Sand mortar & including Supply of lab, Mat,
T&P etc all Comp. (As Unit Rate in 2025-26). | 32.4 | Rmt | 237.17 | ₹7,684.31 |
| 7 | Providing Bier to Retain Sewage water etc
all Comp. (As Unit Rate in 2025-26). | 6 | Nos | 450 | ₹2,700 |
| 8 | RCC Work with Cement, C.Sand & 20 mm
Gauge appd.stone ballast in Prop. Of
1:1.5:3 in Slab including Supply of Lab,
Mat, T&P etc all comp. (As Per UP JN
2023-24 Item Coad 1019) | 1.08 | Nos | 1,280 | ₹1,382.4 |
| 9 | Mild steel or Iron Work in Slab. | 0.85 | Cum | 5,500 | ₹4,675 |
| 10 | Cast, Cement, Concrete for seat fixing
in 1:2:4 cement, sand, stone with
Supply of lab,Mat,T&P etc all Comp.
(As Unit Rate in 2025-26). | 5 | days | 470 | ₹2,350 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_2144293.xls
BOQ • 0.35 MB
28.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .