| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.5 LAccepted-AOC BIRD LINE CALICUT POST SRI VIJAYA PURAM SOUTH ANDAMAN 744105 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744105 | ₹45.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹49.2 L+₹3.7 L (8.18%)Rejected-Finance | ₹49.2 L+₹3.7 L (8.18%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹50.9 L+₹5.3 L (11.7%)Rejected-Finance | ₹50.9 L+₹5.3 L (11.7%) | L3 | Rejected-Finance Not being L1 |
| 4 | L4₹51.0 L+₹5.5 L (12.1%)Rejected-Finance | ₹51.0 L+₹5.5 L (12.1%) | L4 | Rejected-Finance Not being L1 |
| 5 | L5₹51.4 L+₹5.9 L (12.9%)Rejected-Finance | ₹51.4 L+₹5.9 L (12.9%) | L5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | RPG AND COMPANY L7 | M/s Prem Enterprise L4 | M/s K Moorthi L5 | DELTA ELECTRICALS L1 | Bismi Builders & Enterprises L2 | M/s Kamal Electrical L3 | SKV Engineering L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for disconnecting carefully electrical connection from both LT (Incomer & Outgoing) sides of the voltage stabilizer, keeping them at safe side and taking out the Voltage stabiliser of capacity 250 to 150 KVA of any make for carrying out complete overhauling which shall comprise of the following:-
a) M&L for lifting, transporting, handling, the voltage stabilizer to workshop and opening top cover of the voltage stabilizer by unscrewing nuts, bolts, washers etc. including disconnecting core assembly from LT bushing and lifting the same gently and taking out from the shell (container/ body) of the voltage stabilizer.
b) M&L for draining out oil from the above said voltage stabilizer in the suitable capacity of container /drums and keeping it in safe custody for reuse. | 1 | Each Job | 21,300 ₹21,300 | 21,100 ₹21,100 | 21,150 ₹21,150 | 25,000 ₹25,000 | 21,200 ₹21,200 | 21,000 ₹21,000 Lowest | 21,200 ₹21,200 |
| 1.01c) M&L for cleaning the voltage stabilizer body from inside, removing deposited dirt/ sludge/ foreign particles etc. from the bottom/ body of the transformer and drying up the shell from inside before refilling of the transformer oil. d) M&L for cleaning and washing thoroughly core and windings of the voltage stabilizer by hosting down with clean dry oil( without moisture) conforming to IS 335/1983, removing deposited dirt/sludge/foreign particles from the windings/ core, thorough inspection of windings, providing insulations to leads and terminals, heating/ drying/ baking complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as directed by Engr-in- charge. e) Lifting and refixing core assembly inside the voltage stabilizer shell gently and carefully, connecting primary/ secondary/ Neutral connections to the bushings assembly including tightening of nuts, bolts, washers of the core to reduce humming noise all as directed. f) Refilling the filtered transformer oil in the shell of voltage stabilizer complete. g) Refixing the top cover including replacement of cork sheet/ gasket, tightening of nuts/ bolts/ washers etc.complete all as directed by Engr-in charge | ||||||||||
| 1.02h) Lifting/ shifting to the place from where removed or to any location as directed and re-installing the voltage stabilizer including connecting incoming/ outgoing/ neutral and earthing connections etc. all as directed by Engr-in-Charge. j) The inspection of voltage stabilizer shall involve:- i) Checking of all clamps, nuts, bolts including core bolts & cover fixing bolts. Ii) Checking all brazings, joints, tap heads and connection joints. iii) Checking all jumpers, terminations/ connections inside the voltage stabilizer. iv) Inspection of tap changer and servo motor for smooth operation, checking the moving and fixed contacts for contact wear and connection to winding. k) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record. | ||||||||||
| 1.03k) Conducting the tests on core and windings as per IS like ratio, magnetic imbalance, short circuit etc. in presence of Engr-in-Charge and test results shall be signed both by the contractor and Engineer -in-Charge and kept on record. Note:- (i) Any damage to insulators/ bushes/ windings etc. while in the custody of the contractor shall be made good at no extra cost to Department. The serviceability of the voltage stabilizer shall be checked and confirmed by the contractor before taking into his custody. (ii) M&L for rewinding/ re-insulation of LT (primary/ secondary) coils, new transformer oil and dehydration of transformer oil shall be measured and paid separately. | ||||||||||
| 2.00 | All as per Item No-1.00 herein before but voltage stabiliser of capacity 75 KVA to 25 KVA | 1 | Each Job | 17,300 ₹17,300 | 17,100 ₹17,100 | 17,150 ₹17,150 | 20,000 ₹20,000 | 17,250 ₹17,250 | 17,000 ₹17,000 Lowest | 17,200 ₹17,200 |
| 3.00 | M & L for Filtration of transformer oil of servo controlled voltage stabilisers installed at various locations to achieve di-electric strength not less than 60 KV at 2.5mm gap as per relevant IS with portable filtration plant, testing of the oil for the di-electric strength before filtration and after filtration and submit the same signed by both contractor and Engineer in Charge and kept on record complete all as directed. | 2,260 | Litre | 45 ₹1,01,700 | 30 ₹67,800 | 32 ₹72,320 | 15 ₹33,900 Lowest | 50 ₹1,13,000 | 28 ₹63,280 | 35 ₹79,100 |
| 4.00 | Supply and topping up of transformer oil with di-electric strength not less than 60 KV in to the Voltage Stabilizers at various locations complete all as specified and as directed.
[Make: Poweroil/ Transol/ Sabitha Chemicals] | 120 | Litre | 250 ₹30,000 | 215 ₹25,800 | 225 ₹27,000 | 190 ₹22,800 Lowest | 250 ₹30,000 | 210 ₹25,200 | 230 ₹27,600 |
| 5.00 | M&L for rewinding of servo controlled voltage stabilizers of capacity ( 25 KVA to 250 KVA) by winding the defective coils with new copper wire as per I.S. of same gauge and existing size together with new insulated materials/ bracings before placing in to the transformer and assembling the coil with new insulation and fitting the coils in the chamber, testing and commissioning the transformer and recording the test results complete all as directed.
[Note: M&L for re-insulation of serviceable coils will be measured & paid separately under relevant items.] | 40 | Kg | 15,300 ₹6,12,000 | 15,100 ₹6,04,000 | 15,150 ₹6,06,000 | 1,800 ₹72,000 Lowest | 15,200 ₹6,08,000 | 15,020 ₹6,00,800 | 15,200 ₹6,08,000 |
| 6.00 | M&L for re-insulating windings of servo controlled voltage stabilizers of capacity ( 25 KVA to 250 KVA) by strip opening of coils (i.e. Primary/ secondary coils) from core assembly safely, unwinding the coils (i.e. Primary/ secondary coils) complete, removing the old defective insulation paper and replacing with new DPC insulation to the copper conductor, re-varnishing of the windings with super varnish including heating/ drying/ backing complete carefully and thoroughly inside the heating chamber at suitable temperature to obtain required value of insulation resistance etc. all as per IS 1986-87 complete all as specified and as directed. | 25 | Kg | 600 ₹15,000 | 490 ₹12,250 | 495 ₹12,375 | 350 ₹8,750 Lowest | 495 ₹12,375 | 480 ₹12,000 | 500 ₹12,500 |
| 7.00M&L for preparation of old painted surfaces of voltage stabilizers with coarse cloth/ brush and painting throughout externally on exposed surfaces with two coats of smoke grey colour synthetic enamel paint or as approved colour complete all as specified and directed for the following capacity:- | ||||||||||
Tender Value
₹43.8 L
EMD Value
₹87,500
Closing Date
24 May 2025, 6:00 pmClosed
GE, Minniebay, Sri Vijaya Puram
GE, Minniebay, Sri Vijaya Puram - 744 103
REP MAINT RENEWAL OF SURGICAL OT LIGHTS, UNINTERRUPTED POWER SUPPLY SYSTEM, VOLTAGE STABILISERS, SERVO CONTROLS, BACK UP SYSTEM, CONNECTED SWITCHGEARS, REP MAINT REPL OF FIRE ALARM SYSTEM, INT AND EXT FIRE FIGHTING SYSTEM, FIRE MAIN PUMPSETS, SPRINK
2025_MES_706503_1
8561/E8
Open Tender
Civil Works
Item Rate
GE, Minniebay, Sri Vijaya Puram
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
Yes
GE Minnie Bay
₹87,500
Yes
21 Oct 2025
3 May 2025
26 May 2025
3 May 2025
24 May 2025
17 May 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .