Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | ₹16.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹16.0 LRejected-AOC | ₹16.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M.Rajagopal L2 | GR ENGINEERING AND CO L1 |
|---|---|---|---|---|---|
| 1.00PROVIDING CC ROAD IN JAWAHARLAL NAGAR MAIN ROAD IN PULLILYON PANCHAYAT | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 18.97 | cu.m | 132 ₹2,504 | 131 ₹2,485 |
| 3.00 | Filling with good dry river sand including cost and conveyance of all materials to site etc., complete | 9.49 | cu.m | 2,175 ₹20,641 | 2,173.5 ₹20,627 |
| 4.00 | Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.. | 156.72 | sqm | 138 ₹21,627 | 136.5 ₹21,392 |
| 5.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 89.17 | cu.m | 6,040 ₹5.4 L | 6,038 ₹5.4 L |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 77.78 | cu.m | 7,435 ₹5.8 L | 7,432.5 ₹5.8 L |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 58.02 | cu.m | 3,038 ₹1.8 L | 3,036.5 ₹1.8 L |
| 8.00 | Supply and Laying of Bittumen Pad including cost and conveyance of all materials to site and all labor charges etc., complete. | 12.1 | sqm | 246 ₹2,977 | 245 ₹2,965 |
| 9.00 | Supply and filling of Carted Earth for berms incl cost and conveyance of material and labour charges etc complete | 33.2 | sqm | 122 ₹4,050 | 120 ₹3,984 |
| 10.00 | Supply and fixing of 110 mm dia PVC pipe for Dummy Duct provision incl cost and conveyance of material and labour charges etc complete | 60.5 | sqm | 155 ₹9,378 | 150 ₹9,075 |
Tender Value
₹16.2 L
EMD Value
₹40,600
Closing Date
18 Sept 2025, 3:00 pmClosed
Block Development Officer VP
Block Development Office Puzhal
PROVIDING CC ROAD IN JAWAHARLAL NAGAR MAIN ROAD IN PULLILYON PANCHAYAT
2025_RDTN_602276_1
Panchayat General Fund 2025-26
Open Tender
Civil Works
90 days
Puzhal
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹40,600
Yes
2 Feb 2026
10 Sept 2025
18 Sept 2025
10 Sept 2025
18 Sept 2025
10 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid