| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71,601.50Accepted-Finance | ₹71,601.50 | L1 | Accepted-Finance 1st Lowest |
| 2 | L1₹71,601.50Accepted-Finance VILL GADAIIPUR P O SOMRUK P S ULUBERIA HOWRAH 711316 | ULUBERIA | HOWRAH | WEST BENGAL | 711316 | ₹71,601.50 | L1 | Accepted-Finance 1st Lowest |
| 3 | L2₹1.6 LRejected-Finance | ₹1.6 L | L2 | Rejected-Finance 2nd Lowest |
| 4 | L3₹1.6 LRejected-Finance | ₹1.6 L | L3 | Rejected-Finance 3rd Lowest |
| 5 | L4₹1.7 LRejected-Finance | ₹1.7 L | L4 | Rejected-Finance 4th Lowest |
Tender Value
₹1.8 L
EMD Value
₹3,580
Closing Date
25 May 2026, 3:30 pmClosed
EE-II,LDCD
Office of the Executive Engineers Lower Damodar Construction Division Fuleswar, Uluberia, Howrah-711316
Protection work (length 25.00m) at Left bank of Bhaanipur Khal near Tea shop of Nabin Das to meat Shop of Sanat Das in G.P- Balichaturi , Block-Shyampur-I, P.S-Shyampur, Dist-Howrah under LDC Sub-Divn-II
2026_IWD_1024538_13
WBIW/EEII/LDCD/eNIT05/2026-27
Open Tender
CIVIL WORKS
Percentage
7 days
Balichaturi
Please refer Tender documents.
6 documents required · 6 mandatory
₹3,580
22 Jun 2026
18 May 2026
28 May 2026
18 May 2026
25 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.
Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.
(i)12.5 cm av. Diameter | 351 | Mtr. | 172.81 | ₹60,656.31 |
| 2 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
iii) 12.5 cm av. diameter
Note:
1) Payment to be made on the length driven into the ground. Diameter to be measured at 1.5m. from the thicker end.
2) For string staging under specific instruction of Engineer-in-charge or for driving from pontoon or boats, the rate will be enhanced by ` 4.00 per meter. | 305.85 | Mtr. | 109.65 | ₹33,536.45 |
| 3 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc.complete with cost of all materials and carriage to site.
(a) Width of thinner end above 10 cm and less than 15cm.
(i) Jhaw / Eucalyptus. | 77 | Mtr. | 123.95 | ₹9,544.15 |
| 4 | Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-charge
a) Two Coat | 195.01 | Sqm | 65.55 | ₹12,782.91 |
| 5 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. | 25.78 | cum | 96.54 | ₹2,488.8 |
| 6 | Extra rate over Item Nos.1.01, 1.02 & 1.03 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30metres (i)Three no extra lead | 25.78 | Each | 42.9 | ₹1,105.96 |
| 7 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
C) Beyond 2.00 km and upto 3.00 km | 77.34 | cum | 350.74 | ₹27,126.23 |
| 8 | Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet, fixture all complete as per direction of the Engineer - in - charge. | 22.5 | sqm | 520.82 | ₹11,718.45 |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). | 1,005 | Each Bag | 7.15 | ₹7,185.75 |
| 10 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).
NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. | 1,005 | Each Bag | 8.34 | ₹8,381.7 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
13.pdf
Additional Documents • 0.34 MB
Form2911.pdf
Tender Documents • 0.56 MB
BOQ_2517891.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].