| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance AT MAHAPATRABALANDA PO MAHAPATRABALANDA PS MAHULPALI DIST SAMBALPUR PIN 768228 | SAMBALPUR | ODISHA | 768228 | +0.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance PLOT NO NS 320 IRC VILLAGE WARD NO 21 POST NAYAPALLI PS NAYAPALLI BHUBANESWAR DIST KHORDHA PIN 751015 | KHORDHA | ODISHA | 751015 | +0.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹25.4 L
EMD Value
₹25,406
Closing Date
18 Sept 2026, 5:00 pmClosed
COMMISSIONER, SMC
Commissioner Sambalpur Municipal Corporation
Construction of Paver Road and Drain from Sabitri Thakur House to Srimanta Hota House, Maa Shakti Nagar, Ward no 27 under SMC, Sambalpur
2026_ORULB_140422_2
27/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹25,406
Yes
23 Sept 2026
9 Sept 2026
19 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kind of soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 243.2 | cum | 255.01 | ₹62,018.43 |
| 2 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | 170.24 | cum | 276.01 | ₹46,987.94 |
| 3 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 19.5 | cum | 847.2 | ₹16,520.4 |
| 4 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 93.8 | cum | 1,660.72 | ₹1,55,775.54 |
| 5 | Cement Concrete (1:3:6) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete. | 116.1 | cum | 6,084 | ₹7,06,352.4 |
| 6 | P.C.C. work in (1:2:4) with 12mm size crusher brocken h.g. chips mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing labour required for the work etc but excluding centring, shuttering . Complete as per direction of E-I-C. | 25.1 | cum | 7,561.7 | ₹1,89,798.67 |
| 7 | R.C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips including hoisting & laying with cost of all labour, materials with all taxes, lead ,T & P , ,but excluding centering, shuttering cost of steel and labour required for bending, binding etc. all complete as per direction of E-I-C | 53.1 | cum | 5,747.1 | ₹3,05,171.01 |
| 8 | Providing reinforcement for RCC work with cutting bending binding , placing in proper position as per design including cost of steel , binding wire and labour required for bending , binding . | 31.36 | Qntl | 9,534.7 | ₹2,99,008.19 |
| 9 | Providing and laying 80 mm thick factory made cement concrete interlocking paver block of M.40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. | 971.5 | Sqm | 608.4 | ₹5,91,060.6 |
| 10 | Providing rigid smooth centring and shuttering for C.C/R.C.C. works including false work and dismantling then after casting including cost of materials complete as per direction of E-I-C. | 672.1 | Sqm | 249.8 | ₹1,67,890.58 |
stage.html
html • 0.06 MB
finance_608679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_608679.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .