| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.5 LRejected-Finance | ₹1.5 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 LRejected-Finance | ₹1.5 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
15 Jan 2026, 10:30 amClosed
EE(C), BR-VII
9/1A, AJC BOSE ROAD, KOL-17
IMPROVEMENT OF UTTARAN PASSAGE (WILL DISTURBED DUE TO LAYING OF SEWER LINE) AT 36/1/1 PULIN KHATIC RD AND ITS SURROUNDING UTTARAN AREA IN WARD NO-58
2025_KMC_979286_9
KMC/EEC/VII/25-26/1
Open Tender
CIVIL WORKS
60 days
BOROUGH VII, KMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
5 May 2026
24 Dec 2025
17 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018)
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
Raising cover and frame of Catch Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_2387211.xls
BOQ • 0.33 MB
TF58114.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid