| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC LOA ISSUED, ELECTRONIC CLOSING OF LOA IS BEING DONE NOW |
Tender Value
₹5.2 L
EMD Value
₹5,225
Closing Date
28 Mar 2018, 2:00 pmClosed
SE/MEDC/TANGEDO/MADURAI
SE/MEDC/TANGEDO/K.PUDHUR,MADURAI
E-tender for Erection of new HT Lines for HVDS and LT Strengthening works in Vadipatti Panchayat in Vadipatti section in Samayanallur Division of Madurai Electricity Distribution Circle, Madurai under IPDS Scheme.
2018_EB_90085_1
SE/MEDC/ET/ WC (IPDS)/ 118 /17-18 Dt 20.03.2018
Open Tender
Electrical Works
Works
90 days
Vadipatti
As per BQR Conditions in the tender documents
2 documents required · 2 mandatory
₹0
₹5,225
Yes
18 Mar 2021
20 Mar 2018
28 Mar 2018
20 Mar 2018
28 Mar 2018
20 Mar 2018
Amount
Labour charge for transporting of 9 M PSC (400 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART A)
Labour charge for Earth work excavation to 9 M PSC (400 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3 (PART A)
Labour charge for Erection of 9 M PSC (400 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for earthing of 9 M PSC (400 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART A)
Labour charge for transporting of 8 M PSC (200 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART A)
Labour charge for Earth work excavation to 8 M PSC (200 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including Tools and plant, lead and lift complete etc. Pit Size 1.13 M3 (PART A)
Labour charge for Erection of 8 M PSC (200 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for earthing of 8 M PSC (200 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete ( PART A)
Providing PCC sleeve concrete and plastering of concrete for 42' RSJ / 36' RSJ /9M PSC pole (400 KG-Wind pressure) / 8 M PSC (200 KG-Wind pressure) Pole for the size of - 0.12 M3 (0.6 X 0.45 X 1.2) Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART A)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc (PART A)
Labour charge for Erection of stay set complete with stay plate incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART A)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART A)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/4.09mm conductor (PART A)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/3.35 mm conductor (PART A)
Labour charges for erection of Three Phase cross arm with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location (PART A)
Labour charge for Erection HT 4'-6" ' V cross arm , Top insulator Fitting with pin insulator complete etc in Pin point location.(PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator complete etc in Pin point location. (PART A)
Labour charge for Erection HT 4'-6" ' V cross arm , Top insulator Fitting with pin insulator and Disc complete etc in Pin point location. (PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator and Disc complete etc in Cut Point location (PART A)
Labour charge for Erection HT Tapping channel Cross arm ,Guarding cross arm , Top insulator Fitting with pin insulator and Disc complete etc (PART A)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc. (PART A)
Labour charge for transporting of 9 M PSC (400 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART B)
Labour charge for Earth work excavation to 9 M PSC (400 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3 (PART B)
Labour charge for Erection of 9 M PSC (400 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART B)
Labour charge for earthing of 9 M PSC (400 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART B)
Labour charge for providing of sleeve concrete and plastering of concrete for 9 M PSC (400 KG-Wind pressure) Pole for the size of - 0.12 M3 (0.6 X 0.45 X 1.2) Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for transporting of 8 M PSC (200 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART B)
Labour charge for Earth work excavation to 8 M PSC (200 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including Tools and plant, lead and lift complete etc. Pit Size 1.13 M3. (PART B)
Labour charge for Erection of 8 M PSC (200 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART B)
Labour charge for earthing of 8 M PSC (200 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete. (PART B)
Labour charge for providing of sleeve concrete and plastering of concrete for 8 M PSC (200 KG-Wind pressure) Pole for the size of - 0.12 M3 (0.6 X 0.45 X 1.2) Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc. (PART B)
Labour charge for Erection of stay set complete incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART B)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/3.35 mm conductor (PART B)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/2.59 mm conductor (PART B)
Labour charges for erection of Single phase cross arm with pin insulators / LT shackles etc., including tools and plant complete etc. depend upon location (PART B)
Labour charges for erection of Three Phase cross arm with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location. (PART B)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc. (PART B)
Labour charges for Disconnection/ Re-Connection for each LT single phase service including Tools and Plant, machinery complete etc., (PART B)
Labour charges for Disconnection/ Re-Connection for each LT Three phase service including Tools and Plant, machinery complete etc., (PART B)
Labour charge for breaking the concreting of damaged PSC/ RCC pole and transporting the grill to the road side and hand over to section officer for all Size of poles including hire vehicle and tools charges complete etc. (PART B)
Labour charge for releasing of ACSR 7/2.59 mm and lower Size conductor and hand over to the section officer including hire vehicle and tools charges complete etc. (PART B)
Applicable SGST has to be quoted as numbers
Applicable CGST has to be quoted as numbers
Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .