Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC INDEX NO E 29 CWE JRC 352 3 GURU NANAK PURA EAST JALANDHAR CITY PIN 144001 | JALANDHAR CITY | JALANDHAR | PUNJAB | 144001 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹11.7 L+₹99,080 (9.24%)Rejected-AOC | L2 | Rejected-AOC Other than Lowest bidder |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
25 Jul 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Jalandhar Cantt
HQ CWE Nalwa Road Jalandhar Cantt PIN-144005
Please refer tender documents
2023_MES_605065_1
8323/22/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Jalandhar Cantt
Class E Category b(ii) for contractors enlisted with MES
8 documents required · 8 mandatory
₹500
Garrison Engineer Kapurthala
₹30,000
Yes
22 Aug 2023
22 Jun 2023
1 Aug 2023
22 Jun 2023
25 Jul 2023
13 Jul 2023
Amount
M & L for detecting leakage from transformer complete by removing HT & LT supply connections, decanning oil for reuse, opening top cover, removing, scraping of old worn out gasket of oil tank and fixing of new cork gasket sheet on the tank top cover of 6.0 mm thick and pasted by using suitable adhesive for the transformer, removing old bushing rod with gasket/ packing and fixing bushing rod with gasket complete for transformer of any type/make of capacity 63 to 160 KVA including re-filling oil after heating & dehydration, making necessary electric connections and testing complete on site in existing location (at plinth/in CSS/at pole structure) complete. Note : (i) The items replaced shall be measured under relevant items mentioned at Sr No 1 (a) to (d) Supply only.
Supply only LT & HT Gasket Tape cover cork gasket sheet 6mm thick min.
Supply only LT Bussing Rod complete set.
Supply only Press bolt, Gutty block Sticks.
Supply only HT bushing rod gasket and oil seals.
M & L for detecting leakage from transformer complete by removing HT & LT supply connections, decanning oil for reuse, opening top cover, removing, scraping of old worn out gasket of oil tank and fixing of new cork gasket sheet on the tank top cover of 6.0 mm thick and pasted by using suitable adhesive for the transformer, removing old bushing rod with gasket/ packing and fixing bushing rod with gasket complete for transformer of any type/make of capacity 200 to 315 KVA including re-filling oil after heating & dehydration, making necessary electric connections and testing complete on site in existing location (at plinth/in CSS/at pole structure) complete. Note : (i) The items replaced shall be measured under relevant items mentioned at Sr No 2 (a) to (d) Supply only.
Supply only LT & HT Gasket Tape cover cork gasket sheet 6mm thick min.
Supply only LT Bussing Rod complete set.
Supply only Press bolt, Gutty block Sticks.
Supply only HT bushing rod gasket and oil seals.
Taking down carefully transformer copper wound of capacity 300 KVA from platform or 4 pole structure, with the help of crane and disconnecting HT, LT & earthing connections, testing diagnosing of fault, transporting in suitable conveyance to workshop from site including loading, unloading reqd at site, workshop complete incl testing for checking fault, decanning of transformer oil and keeping in safe custody for reuse after carrying out repair, opening the top cover, dismantling & step opening, removing LT/HT bushing connections, taking out HT & LT coils in the presence of Engineer-in-charge, taking out complete unserviceable core assembly and inserting/ fixing new LT & HT coils made of suitable size winding wire, tap changer fitting with connections, setting the HT/ LT coils, varnishing including replacement of insulating material, pasting/ fixing the rubberised cork sheet with quick fix adhesive, fixing HT & LT side bushing rod with cork sheet gaskets, seals and reassembling, filling of existing dehydrated/ new transformer oil of approved quality for topping up and testing, transporting back in suitable conveyance at his location and making all connection of HT and LT sides complete including testing and commissioning of transformer on load complete. The following Works as under:- (i) Re-winding of HT/LT coils, (ii) Replaceing of Press bolt, Gatty blockSticks. (iii) Dehydration of existing oil and adding new oil for top up of transformer. (iv) Replacement of HT/LT gasket tape (v) Replacing of bleaching rodc Crack paper. Note:- (i) The rate quoted include the cost of replacing all cork sheet gasket of tank & bushing. (ii) The rate quoted includes cost of transportation and any crane, vehicle reqd. (iii) The rate quoted includes cost of Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse (iv) The rate quoted includes cost of Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified. (v) The rate quoted include cost of any type of T&P reqd for testing. (vi) The rate quoted include cost of any other items/ work which are required for repair of transformer but not mentioned here.
All as per item No. 3 here-in-before but transformer of capacity 200 KVA.
M&L transformer oil having di-electric strength of 60 KV as per IS complete for top up/replacement all as specified and as directed by Engr-in-Chief (Oil should be supplied in sealed barrel of Power/Transol brand). Note:- Oil shall be filled in the transformer/stabilizers to be repaired or installed at site at different locations.
Dehydration /Filerating of transformer oil at site by means of centrifuing machine in order to improve delectric strength of oil as per IS-355. Breakdown voltage should not be less than 50 KV complete all as specified and directed.
Material and labour for rewinding of burnt/ over heated HT/ LT limbs of transformers 11 KV/ 433 volts, 3 phase of capacity 63 to 160 KVA by using double paper covered (DPC) insulation, cotton tape, superior quality insulated copper wire of suitable gauge, size, specification and drying, curing in oven complete all as specified.
Material and labour for rewinding of burnt/ over heated HT/ LT limbs of transformers 11 KV/ 433 volts, 3 phase of capacity 200 to 300 KVA by using double paper covered (DPC) insulation, cotton tape, superior quality insulated copper wire of suitable gauge, size, specification and drying, curing in oven complete all as specified.
Taking down carefully transformer from platform or 4/2 pole structure, with the help of crane and disconnecting HT, LT & earthing connections, testing diagnosing of fault, transporting in suitable conveyance to workshop from site including loading, unloading reqd at site, workshop complete incl testing for checking fault, decanning of transformer oil and keeping in safe custody for reuse after carrying out repair, opening the top cover, dismantling & step opening, removing LT/HT bushing connections, taking out HT & LT coils in the presence of Engineer-in-charge, taking out complete unserviceable core assembly and inserting/ fixing new LT & HT coils made of suitable size winding wire, tap changer fitting with connections, setting the HT/ LT coils, varnishing including replacement of insulating material, pasting/ fixing the rubberised cork sheet with quick fix adhesive, fixing HT & LT side bushing rod with cork sheet gaskets, seals and reassembling, filling of existing dehydrated/ new transformer oil of approved quality for topping up and testing, transporting back in suitable conveyance at his location and making all connection of HT and LT sides complete including testing and commissioning of transformer on load complete . Note:- The items replaced shall be measured under relevant items mentioned at Sr No 6 to 9
M&L for painting of tranformer after preparation of existing surface of trasformer, remove oil stains dust etc and applying two coat of hammertone by spray incl writing SM No.MES No capacity of transformer of following capacity all as directed by Engr-in-Chief.
(a) 63 KVA to 160 KVA
(b) 200 KVA to 315 KVA
Supply & fixing of Silica gel in granular form for transformer air breather complete all as specified & directed by Engr-in -Charge
Supply & replacement of defective tap changer switch assembly complete with tapping arrangement suitable to steping up/ down of 2.5% voltage normal tapping suitable for transformer 11 KV/ 433 volts, 3 phase of capacity including making connections and testing commissioning up to 400 KVA complete all as specified & directed by Engineer-in-charge.
Supply, fixing and testing after jointing Cable Jointing Kit for 11 KV grade cable for outdoor type termination cold shrinkable joint complete with jointing material and accessories suitable for XLPE armoured aluminum cable of size 95 sqmm to 120 Sqmm 3 core.
Supply, fixing and testing after jointing Cable Jointing Kit for 11 KV grade cable for indoor type termination cold shrinkable joint complete with jointing material and accessories suitable for XLPE armoured aluminum cable of size 95 sqmm to 120 Sqmm 3 core.
M&L cable jointing kit for 11 KV (E) grade cable for straight through heat shrink type complete with jointing material and accessories suitable for XLPE armoured aluminium conductor cable of size 95 sqmm to 120 sqmm 3 core in repair including of existing wornout staright through joint complete all as specified and directed.
Earthing complete with galvanised steel earth plate electrode 60cmx60cmx6mm thick buried directly in ground vertically at a depth not less than 2.25 metres below normal ground level with top edge of the plate at a depth not less than 1.5 metres below normal ground level, connected with and including GI strip 32mm x 6mm upto test point and incl Aluminium strip 25x3.15mm from test point to equipment and including GI pipe 40mm bore light grade as protection pipe (from top of earth plate up to the test point) by means of GI bolts, nuts, check nuts and washers of GI and thimbles, earth plate surrounded by packed layers of charcoal dust and common salt 15cm thick, all around including top and bottom and watering pipe 20mm bore of GI pipe light grade with funnel and wire mesh, PCC chamber of size 300x300x300mm (top of chamber minimum 15 cm above the normal ground level (1:3:6) using 20mm graded stone aggregate and RCC cover (1:2:4) type B-I using 20mm graded crushed stone aggregate with 1 nos MS handles of 8mm dia including necessary excavation/ earth work in any type of soil/rock and as shown in Electrical plate No. 3 of SSR Part-I (2009) testing on completion complete all as specified.
Cleaning and preparation of old painted surface of 4 pole structure and painting with one coat of aluminium paint to all steel structure such as channel/brackets, bracing, clamps, anti climbing device, cross arms and marking 30 cm high alternate yellow & black strips with synthetic enamelled paint upto 1.5 mtr height and writing pole Nos and applying one coat of cement base paint on complete PCC pole and coping complete all as specified and directed.
Supply and fixing Pin type insulator porcelain viterous white brown or green incl one galvanised mild steel spindle two galvanised iron washer and one galvanised iron nuts 150 mm height, 150 mm dia for 11000 volts grade.
Supply and fixing HT Lightning Arrestor Metal Oxide Type (Gap less) heavy duty single pole suitable for system voltage of 12 KV and working rated arrestor voltage 9 KV with normal discharge current of 10 KA all as per IEC 99.4 effectively earthed complete all as specified and directed. Make :- Jaipuria/ Rashtriya/ Oblum
Supply, laying, jointing and testing under ground XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured electric power cable (heavy duty) with stranded aluminium conductor, 11000 volts grade earthed system of size 95 sqmm 3 core conforming to IS-7098 (Part-II) 1985 laid in trenches, in floor, in duct, through pipes or along the pole including taking out unserviceable HT cable complete all as specified and directed.
Supply, laying, jointing and testing XLPE insulated, screened, PVC bedded, galvanized steel strip or wire armoured electric power cable (heavy duty) with stranded aluminium conductor, 11000 volts grade earthed system of size 120 Sqmm 3 core conforming to IS-7098 (Part-II) 1985 laid in trenches, in floor, in duct, through pipes or along the pole including taking out unserviceable HT overhead conductor complete all as specified and directed
Shifting of retrieved serviceable cable in any length recd complete collecting from store to reqd site and Relaying of 11 KV HT Cable off size carefully at diff route in trench including connecting to existing/new system incl testing, commissioning complete all as specified and directed by Engineer-in-Charge. Note: The excavation and related civil wk will be measured and paid separately.
Excavation in trenches in soft/loose soil not exceeding 1.50 mtr wide and not exceeding 1.50 mtr in depth for laying of cables and getting out complete all as specified and directed by Engineer-in-Charge.
Returing, filling in, including spreading, leveling watering and well ramming inlayers not exceeding 25 cms thick each layer compete all as specified and directed by Engineer-in-Charge.
Removal of surplus soil to a distance not exceeding 50 mtr and depositing where directed at a level not exceeding 1.5 mtr above the starting point complete all as specified and directed by Engr-in-charge.
Material and labour for sand cushioning with a layer of sand 8cm thick before laying of cable and 15 cm thick after laying of cable and punned down to thicknes of 18cm in trenches complete all as specified. (Note: Punned thickness of 18 cm will be measured)
Supply & laying un-reinforced precast concrete cable cover, class HVP, type I, flat, size 300mm x 180mm x 40mm laid flat in trenches over the cable with the length of brick perpendicular to the direction of cable length, adjacent/abutting each other complete all as specified and directed by Engineer-in-charge.
Relaying of existing retrieved bricks/PCC cover laid in trenches for cable protection perpendicular to the direction of cable length, adjacent abutting each other complete all as specified and directed.
Material and labour for cleaning 2 pole/ 4 pole structure by cutting grass and excavation upto 30 cm depth, spraying chemical, laying polythene in excavated area and filling complete with provn of 63mm graded stone aggregate upto height 40cm all as specified and directed.
Supply & Fix 15mm dia gun metal gate valves with iron wheel head screwed at both ends for drain out transformer oil complete including dismantling of old unserviceable gate valve from existing transformer at any location complete all as specified and as directed.
S & F 25 mm x 3 mm aluminum strip as earth continuity conductor including from test point to equipement complete all as speicified & directed by Engineer-in-charge.
S & F 32 mm x 6 mm GI strip as earth continuity conductor including from test point to equipement complete all as speicified & directed by Engineer-in-charge.
Supplying and fixing switch Air break Gang Operated Switch outdoor type HT 11 KV triple poles upto 400 amps with fixed contacts of phosphorus bronze and moving contacts of copper with mechnically operating from ground level vertical mounted complete with HT insulator on steel frame operating rod made out of 25 mm GI pipe medium grade worked from ground level with handle and locking arragement with 12 insulators with drop out fuses complete all as per specified and directed by Engr-in-Charge and (Clamps/cross arms shall be measured and paid for separately)
Material and labour for locating fault of HT underground cables of size 70 Sq mm to 120 Sq mm 3.0 core laid in trenches by locating fault visually with fault locator machine with machine operator by excvating (upto 10 mtr of length) the faulty portion of cable, taking out to protection bricks or cover, sand and faulty cable and making of joints or repair to existing joint including all jointing material such as LT joint, ferrule and relaying after repair including refilling of sand and relaying of brick protection cover complete all as specified and directed. Note :- (a) HT joint will be meaured and paid separately. (b) The contractor will have to arrange the fault locating machine, if contractor fails to diagnose/ locate the fault withing 04 Hrs of fault intimation. A penalty of Rs. 300/Hrs will be imposed/ levied, if contractor to arrange the machine. The quoted rate includes cost of arranging, shifting of fault locator machine, any operating charges at site, T&P required, number of times as and when required during the currency of contract. Nothing exra will be paid on the account. (c) The qty catered will be executed different times during currency of work as directed by Engr-in-Charge. Hence contractor shall quote his rate accordingly considering this aspect. (d) If cable required the same will be issued by Department of cable.
Kaul Enterprises
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .