Tender Value
₹2.6 L
Closing Date
17 Feb 2021, 6:00 pmClosed
DFO Awantipora Forest Division
Office of the Divisional Forest Officer Awantipora Forest Division Awantipora.
Construction of Main Gate at Kanjinag Nursery Pilot No. II.
2021_FD_116276_5
e-NIT NO 03 OF 2020-21(Awantipora Forest Division)
Open Tender
Civil Works
Item Rate
25 days
Awantipora Forest Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Government Treasury under Account Head 0406-Forest
Exempted
1 Mar 2021
11 Feb 2021
18 Feb 2021
11 Feb 2021
17 Feb 2021
11 Feb 2021
Amount
E/W in excavtion in foundation trenches or drains ( not exceeding 1.5 mts in width as well as 10 sqmts on plan) including dressing of sides & ramming of botoms, lift up to 1.5mts & lead of 50 mts including getting out the execavated soil and disposal of surplus execavated soil as directed.
Providing & laying dry stone soling hand packed including ramming, watering and dressing including all carriages, Head load etc from approved source up to site of work complete job.
Providing & laying in position cement concrete (1cement: 4coarse sand: 8 graded stone agg 40mm nominal size) mix of specificied grade excl cost of centering and shuttering. including all carriages, Head load etc from approved source up to site of work complete job. All work upto plinth level. CRUSHED.
Centering and shuttering including strutting, propping etc and removal of form work for. Foundations, footings, bases of columns etc. including all carriages, Head load etc from approved source up to site of work complete job.
Centering and shuttering including strutting, propping etc and removal of form work for. Walls, pilasters, plinths, string courses etc. including all carriages, Head load etc from approved source up to site of work complete job.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement.1:2:4 (1 cement: 2 coarse sand: 4 graded crushed stone aggregate 20mm nominal size), Including all carriages of material from approved source up to site of work complete job. All work upto plinth level.
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and bending all complete. (TMT bars) Including all carriages of material from approved source up to site of work complete job..
Providing 40x5 mm flat iron hold fasts 40 cm long including fixing to frame with 10 mm diameter bolts, nuts and wooden plugs and embeddings in cement concrete block 30x10x15 cm 1:3:6 mix. (1 cement: 3 coarse sand : 6 graded stone 20 mm nominal size) including Mechnical carriage, Head load, loading & unloading etc from approved source up to site of work complete. For Gate Pillars.
Providing & fixing steel gate with frame of (40x40x6mm) angle iron with (3mm) gussets, plates, at the junction and corners incld all necessary fittings with a coat of steel primer including Mechnical carriage, Head load, loading & unloading etc from approved source up to site of work complete.
12 mm cement plaster of mix 1:4. (1 cement : 4 coarse sand). Including all carriages of material from approved source up to site of work complete job.
Finishing walls with water proofing cement paint of required shade New work (two or more coats) applied @3.84 kg/1 Osqm. (Plinth Wall).
Painting with ready mixed synthetic enamel paint of approved brand and manafacture in all shades to given an even shade. (two or more coats on new steel work).
Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and cleaning etc complete on 20mm thick bed of cement mortor 1:4 (1 cement: 4 coarse sand). Medium shade using 50% white cement and 50% ordinary cement.
TABISH JAN
SARTAJ AHMED PARRAY
M/S ADIL BASHIR PALA
TABID AHMAD BHAT
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .