Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | ₹24.5 L | L1 | Accepted-AOC Accept |
| 2 | L2₹25.0 LRejected-Finance | ₹25.0 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | GOBALAKRISHNAN P L1 | K.SELVARAJ L2 |
|---|---|---|---|---|---|
| 1.00Name of Work: construction of ComPound Wall in allround Burial Ground in ad colony @ keeranatham H/O Keeranatham Panchayat. SS Kulam union in Coimbatore District under Village Panchayat General Fund 2025-26 Package No. TN 01-SSKM-01 | |||||
| 2.00 | (Compound wall) 1.Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm. thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed . | 77.16 | Cum | 263 ₹20,293.08 | 300 ₹23,148 |
| 3.00 | Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers. | 10.41 | Cum | 5,489 ₹57,140.49 | 5,500 ₹57,255 |
| 4.00 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications(For Centring below Ground Floor) | 112.8 | Sqm | 547.5 ₹61,758 | 550 ₹62,040 |
| 5.00 | Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications(For Centring Above Ground Floor) | 121.72 | Sqm | 1,095 ₹1.3 L | 1,100 ₹1.3 L |
| 6.00 | Reinforced Cement concrete 1:1.5:3 (One of cement, one & half of sand and three of hard broken granite stones) using 20mm gauge hard broken granite stones for all reinforced cement concrete works viz. Raft slabs, raft beams, column footing, plinth beam, lintel, square or circular columns, T, L, or rectangular beam , floor, roof or waist slab, drop cum parapet wall, loft, sun shade and other similar works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects. | 36.13 | Cum | 9,113 ₹3.3 L | 9,113 ₹3.3 L |
| 7.00 | Fabricating and placing the steel grills for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also) | 3.2 | Mt | 91,910 ₹2.9 L | 91,910 ₹2.9 L |
| 8.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 59.86 | Cum | 7,555 ₹4.5 L | 7,600 ₹4.5 L |
| 9.00 | Plastering the walls with cement mortar 1:5 (One of cement and five of sand) 12mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers. | 607.24 | Sqm | 284 ₹1.7 L | 300 ₹1.8 L |
| 10.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete | 607.24 | Nos | 262 ₹1.6 L | 300 ₹1.8 L |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
26 Jan 2026, 3:00 pmClosed
The Special Officer Keeranatham Panchayat
The Special Officer Keeranatham Panchayat
construction of ComPound Wall in allround Burial Ground in ad colony and keeranatham H/O Keeranatham Panchayat
2026_RDTN_646594_1
20/2025-1
Open Tender
Civil Works
180 days
Keeranatham
construction of ComPound Wall in allround Burial Ground in ad colony and keeranatham H/O Keeranatham Panchayat
4 documents required · 4 mandatory
₹0
₹25,000
Yes
6 Feb 2026
23 Jan 2026
26 Jan 2026
23 Jan 2026
26 Jan 2026
23 Jan 2026
(Compound wall) 1.Earth work excavation for foundation in all soils and sub-soils such as hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm. thick well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial leads and lifts, etc., including levelling the site complete complying with standard specifications and as directed .
Cement concrete 1:4:8 (One of cement, four of sand and eight of hard broken stone) using 40mm size hard broken stone inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications(For Centring below Ground Floor)
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) and supported by casurina props of 10cm to 13cm dia (Spaced at 75cm c/c) as noted below including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications(For Centring Above Ground Floor)
Reinforced Cement concrete 1:1.5:3 (One of cement, one & half of sand and three of hard broken granite stones) using 20mm gauge hard broken granite stones for all reinforced cement concrete works viz. Raft slabs, raft beams, column footing, plinth beam, lintel, square or circular columns, T, L, or rectangular beam , floor, roof or waist slab, drop cum parapet wall, loft, sun shade and other similar works excluding the cost and fabrication of reinforcement grills in position, shuttering, centering but including laying, vibrating, curing, finishing and providing Mild steel fan hooks in the RCC slab wherever necessary as directed by the departmental officers etc., complete in all respects.
Fabricating and placing the steel grills for reinforcement for all reinforced cement concrete works such as plinth beam, lintels, beams, sunshade, roof and floor slabs etc., including cost of steel and fabricating the reinforcement grills in position etc., complete in all floors (The rate to include the cost of binding wire steel also)
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering the walls with cement mortar 1:5 (One of cement and five of sand) 12mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers.
Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Pipe Culvert Sub Estimate : 1.Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying & erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surface in all cross bracings using mild steel sheets etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum.
Supply and fixing of 900 mm RCC Hume pipe including all labour charges etc
laying of 900mm RCC Hume pipe including all labour charges etc
Refilling excavated earth including all Labour charges etc
Plastering the walls with cement mortar 1:5 (One of cement and five of sand) 20mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers.
CC road Sub Estimate : 1.Earth work excavation and depositing on bank with in initial lead of 10 mt and initial lift of 2mt in Hard Gravelly soil for foundation as per specification SS 20 B.
Cement Concrete 1:4:8 mix using 40 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
Supplying & erecting centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surface in all cross bracings using mild steel sheets etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying & curing etc complete for 10 cum.
Cement Concrete 1:2:4 mix using 20 mm ISS H.B.G. metal including cost and conveyence of all materials to site and all other labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_775045.xls
BOQ • 0.25 MB
pricebid.pdf
Tender Documents • 0.91 MB
tech.pdf
Tender Documents • 0.85 MB
Download all tender documents and submit your bid